Case CX210 CX230 & CX240 Crawler Excavators Operator's Manual 6-31743 - PDF DOWNLOAD

Page 95

OPERATING INSTRUCTIONS

ENGINE OPERATION The engine should be run at full speed when operating conditions permit.

Template Name: OM_1_col Template Date: 1994_04_29

When the engine has started and before beginning work, the following procedure must be observed :

The operating speed of the machine and of the attachment should be controlled by means of the control levers.

- Let the engine run at idle speed until the engine reaches normal operating temperature.

Check the systems display and control panel regularly.

- Move the engine throttle button to the maximum speed position. Once normal operating temperature has been reached, check the following : - The exhaust smoke is normal. - There is no abnormal noise or vibration. - There are no oil, fuel or water leaks. TRIM THIS EDGE

Stop the engine immediately if one of the following situations occurs : - Sudden increase or decrease in engine speed. - Abnormal noise.

Alt= to hide template information Alt+ to display template information

- Black smoke at the exhaust. - A message appears on the display screen and the audible alarm device sounds.

92

TRIM THIS EDGE LEFT PAGE


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.