Figure 1. A cost-optimised generating station to keep concrete and earthwork costs down, Manitoba Hydro asked bidders to optimise the dimensions of the generating station using a 3D model during the bidding phase.
54
Figure 1. A cost-optimised generating station to keep concrete and earthwork costs down, Manitoba Hydro asked bidders to optimise the dimensions of the generating station using a 3D model during the bidding phase.
54