CNH Multi-purpose circuit proportional control kit - CX210D Crawler excavator Manual 47844483 - PDF

Page 39

3 - ASSEMBLY

Port relief valve installation 1. Remove the plug, and then install the 2 port relief valves (59) on the control valve (*1). • Tightening torque: 78.4 - 88.3 N·m (57.8 - 65.1 lb ft) After installing the port relief valve (59), adjust the relief pressure to match the attachment used. (See the Service Manual.)

SMIL14CEX5912BB

1

3-29 EN


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.