
1 minute read
PREP ARING FOR ASSEMBL Y Preparation
from CNH Multi-purpose circuit proportional control kit - CX210D Crawler excavator Manual 47844483 - PDF
An “*” this document indicates that the part mounted the actual Items prepare:
• W renches ( , , , , )
• Hexagon wrenches ( 8 , )
• Phillips screwdriver
• scissors
• Rag
Position the main
• Put the main unit level put the bucket cylinder its open stroke the arm der its open stroke end, lower the boom, and touch the arm top the SMIL13II00106AA
Switch the ignition key (a) “OFF”, check that the engine has stopped, and then switch the ignition key “ON” (Do not start the

Bleed out the pressure inside the
• Flip the lever (c) and then turn the upper operation lever (b) about times bleed out the


• Move the travel lever (d) back and forth about 5 times bleed out the SMIL13II00108BA
Bleed out the pressure from inside the hydraulic
• Press the air breather button (e) top the draulic tank release the pressure inside the