
1 minute read
Port relief valve installation
from CNH Multi-purpose circuit proportional control kit - CX210D Crawler excavator Manual 47844483 - PDF
Remove the and then install the 2 port relief valves (59) the control valve (*1)
• T ightening torque: - N·m ( - ) After installing the port relief valve (59) , adjust the relief pressure match the attachment used. (See the Service

Boom line installation 3 - 1 C
Control lever installation 3H
Harness installation - Proportional control 3I
Installation nameplate inside cab 3 -
K
Kit content 1 - 1 P
Pilot line installation - proportional control 3Port relief valve installation 3Preparation 2 - 1 T
T ank indicator sensor installation (filter clog warning) 3U
Upper main line installation 3 - 5
SER VICE - T echnical Publications & T ools
© 2015 CNH Industrial Italia

All rights reserved. part the text illustrations this publication may reproduced.
CNH policy one continuous improvement and the right change specification equipment any time without notices
All data given this publication subject production Dimensions and weight are approximate only and the illustrations not necessarily show products standard For exact information about any particular please consult your CNH Dealer
