Linkbelt 210-240X2 EXCAVATOR SHOP MANUAL (SECTION 2-5) - PDF DOWNLOAD

Page 61

3-6 Air Conditioner: Assembly and Disassembly 2 Removal and Installation of Condenser Warning

• The air conditioner circuit is filled with high-pressure gas. Beware of the gas that is released when loosening the pipes.

Caution

• Be sure to stop the engine before beginning work.

Items to prepare • • • • •

Wrench (13 mm, 17 mm, 19 mm, 22 mm) Caps Plugs Rags Cleaning fluid

[1]

[2]

Use a 17-mm wrench to fasten the pipe (1), and then use a 19-mm wrench to loosen and remove the low-pressure pipe (2). • Always remove the low-pressure pipe first. • Attach caps or plugs to the condenser and pipes to prevent the entry of water, dust or dirt. • Clean the pipes by spraying with a parts cleaner to prevent scratches and prevent dirt from accumulating on the connectors.

2

Use a 22-mm wrench to fasten the pipe (1), and then use a 22-mm wrench to loosen and remove the high-pressure pipe (2). • The cap with "H" indicates the highpressure pipe. • Attach caps or plugs to the condenser and pipes to prevent the entry of water, dust or dirt. • Clean the pipes by spraying with a parts cleaner to prevent scratches and prevent dirt from accumulating on the connectors.

2

57

1

1


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Linkbelt 210-240X2 EXCAVATOR SHOP MANUAL (SECTION 2-5) - PDF DOWNLOAD by www.heydownloads.com - Issuu