Komatsu Hydraulic Excavator PC1800-6 Operation & Maintenance Manual

Page 157

OPERATION

MACHINE OPERATIONS AND CONTROLS

MACHINE OPERATIONS AND CONTROLS BEFORE STARTING ENGINE WALK-AROUND CHECKS Before starting the engine, look around the machine and under the machine to check for loose nuts or bolts, or leakage of oil, fuel, or coolant, and check the condition of the work equipment and hydraulic system. Check also for loose wiring, play, and accumulation of dust at places which reach high temperatures.

WARNING Remove any flammable materials from around the battery or engine muffler, or other high temperature engine parts. Leakage of fuel or oil will cause the machine to catch fire. Check carefully, and be sure to repair any abnormalities, or please contact your Komatsu distributor.

Always check the items in this section before starting the engine each day. 1.

Check for damage, wear, play in work equipment, cylinders, linkage, hoses Check that there are no cracks, excessive wear, or play in the work equipment, cylinders, linkage, or hoses. If any abnormality is found, repair it.

2.

Remove dirt and dust from around engine, battery, radiator Check if there is any dirt or dust accumulated around the engine or radiator. Check also if there is any flammable material (dead leaves, twigs, grass, etc.) accumulated around the battery or high temperature engine parts, such as the engine muffler or turbocharger. Remove all such dirt or flammable material.

3.

Check for leakage of water or oil around engine Check that there is no leakage of oil from the engine or leakage of water from the cooling system. If any abnormality is found, repair it.

4.

Check for oil leakage from hydraulic equipment, hydraulic tank, hoses, joints Check that there is no oil leakage. If any abnormality is found, repair the place where the oil is leaking.

5.

Check the undercarriage (track, sprocket, idler, guard) for damage, wear, loose bolts, or leakage of oil from rollers

6.

Check for damage to handrail, loose bolts Repair any damage and tighten any loose.

7.

Check for damage to gauges, monitor. Check that there is no damage to the gauges and monitor in the operator's cab. If any abnormality is found, replace the parts. Clean off any dirt on the surface.

8.

Clean rear view mirror, check for damage Check that there is no damage to the rear view mirror. If it is damaged, replace it with a new mirror. Clean the surface of the mirror and adjust the angle so that the view to the rear can be seen from the operator’s seat.

9.

Seat belt option and mounting clamps Check that there is no abnormality in the seat belt or mounting clamps. If there is any damage, replace with new parts. 3-103


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

DISASSEMBLING MACHINE

1min
page 367

PRECAUTIONS DURING OPERATION

2min
pages 362-366

OPERATIONS

1min
page 360

EXPLANATION OF COMPONENTS

1min
pages 358-359

CONTROL DEVICES

1min
pages 352-354

PROTECTIVE GUARD

1min
pages 350-351

ATTACHMENT GUIDE

1min
page 349

PRECAUTIONS WHEN INSTALLING ATTACHMENTS

1min
page 348

GENERAL PRECAUTIONS

2min
pages 346-347

MAINTENANCE PROCEDURE MAINTENANCE

25min
pages 304-335, 337-340, 342-343

INSPECT SEALANT AROUND ENGINE COOLING SYSTEM

17min
pages 278-303

MAINTENANCE PROCEDURE MAINTENANCE

11min
pages 262-277

MAINTENANCE PROCEDURE

6min
pages 255-261

TIGHTENING TORQUE SPECIFICATIONS

1min
page 248

LUBRICANTS, COOLANT AND FILTERS

5min
pages 239-242

MAINTENANCE INFORMATION

3min
pages 236-238

DISCHARGED BATTERY

8min
pages 225-231

TROUBLESHOOTING

3min
pages 222-224

LONG TERM STORAGE

1min
pages 220-221

COLD WEATHER OPERATION

3min
pages 217-219

PARKING MACHINE

1min
pages 212-216

TRAVELING ON SLOPES

5min
pages 206-211

WORK EQUIPMENT CONTROLS AND OPERATIONS

3min
pages 201-205

STARTING ENGINE

14min
pages 178-200

MACHINE OPERATIONS AND CONTROLS

15min
pages 157-177

HANDLING ACCUMULATOR

1min
pages 155-156

CONTROLLER (COMPUTER)

3min
pages 150-154

CAR RADIO

7min
pages 141-149

HANDLING AIR CONDITIONER

4min
pages 133-140

CONTROL LEVERS, PEDALS

5min
pages 126-132

SWITCHES

9min
pages 111-125

EXPLANATION OF COMPONENTS OPERATION

14min
pages 96-110

EXPLANATION OF COMPONENTS OPERATION

11min
pages 76-95

CGC MONITOR

1min
pages 73-75

MONITOR SWITCHES

1min
pages 71-72

METER DISPLAY PORTION

3min
pages 67-70

EXPLANATION OF COMPONENTS

4min
pages 59-66

SAFETY MAINTENANCE INFORMATION

7min
pages 47-55

LIFTING OBJECTS WITH BUCKET

1min
page 46

SAFETY MACHINE OPERATION

11min
pages 34-45

SAFETY INFORMATION

12min
pages 25-33

POSITION FOR ATTACHING SAFETY LABELS

1min
pages 20-24

POSITION FOR ATTACHING SAFETY LABELS

1min
page 18

SAFETY INFORMATION

2min
pages 5-6

FOREWORD

1min
page 4
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.