Bobcat E19 Compact Excavator Operation & Maintenance Manual 7256913 (11-14) – PDF DOWNLOAD

Page 59

TRACK FRAME RETRACTION - EXPANSION Operation Figure 57

Figure 55

1 RETRACTED

100 - 150 mm (4.00 - 6.00 in)

P113408

P113409B

With the boom and arm positioned over the blade, lower the blade until the track is raised 100 - 150 mm (4.00 6.00 in) off the ground [Figure 57].

Figure 56

Rotate the upperstructure 180 degrees. Figure 58

EXPANDED P113407

100 - 150 mm (4.00 - 6.00 in) Expand the track frame performance [Figure 56].

for

increased

digging P113410B

IMPORTANT

Lower the boom and arm to raise the rear of the excavator until the track is 100 - 150 mm (4.00 - 6.00 in) off the ground [Figure 58].

To prevent wear and damage to the track, always lift the excavator before expanding or retracting the track frame. I-2193-0599

57 59 of 178

E19 Operation & Maintenance Manual

Dealer Copy -- Not for Resale

Put the Blade / Track Retraction - Expansion Switch (Item 1) [Figure 57] to the right in the Blade position.

The excavator can be operated with the track frame retracted for transportation on a trailer or to access narrow areas [Figure 55].


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Bobcat E19 Compact Excavator Operation & Maintenance Manual 7256913 (11-14) – PDF DOWNLOAD by www.heydownloads.com - Issuu