Tadano Faun GR-250N-2 Rough Terrain Crane (Circuit Diagrams & Data) Service Manual SN FB4745 - PDF

Page 34

Y- 4

Y- 4

Air Bleeding Procedure 2.3. Hydraulic motor assy

(b) Winch motor

(a) Swing motor

[NOTICE] Do not apply any load to the motor before completing air bleeding.

[NOTICE] Do not apply any load to the motor before completing air bleeding.

Bleed the winch motor by following either (1) or (2).

Bleed the swing motor by following either (1), (2) or (3).

(1) Pour the hydraulic oil through the drain port into the casing until the oil flows out. (After connecting all pipes, pour oil just before starting the motor.)

(1) Pour the hydraulic oil through the drain port into the casing until the oil flows out.

(2) Perform the slow hoist-up or hoist-down operation for approx. 1 minute or more with the engine idling.

(2) Perform the right or left swing operation slowly for approx. one minute.

(c) Other motor

(3) Set the swing brake switch to ON. Perform the

Before operating any other motors, pour the hydraulic oil through each drain port into the casing until the oil flows out.

right or left swing operation and keep the swing circuit hydraulic pressure at approx. 4.9MPa {50 kgf/cm2} (710 psi) for approx. 30 seconds.

24

WY05-3550E


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Tadano Faun GR-250N-2 Rough Terrain Crane (Circuit Diagrams & Data) Service Manual SN FB4745 - PDF by www.heydownloads.com - Issuu