Linkbelt 130-160 LX EXCAVATOR OPERATOR'S MANUAL - PDF DOWNLOAD

Page 146

LUBRICATION

COOLING SYSTEM Service specifications Coolant reservoir level check .......................................................... Every 10 hours or every day Coolant solution change ................................................................ Every two years or twice a year (autumn or spring) if antifreeze is used System capacity 130 LX and 160 LX .........................................17.7 litres (4.7 gal)

!

!

Warning: Boiling coolant solution can spray out if the radiator cap is removed while the system is still hot. To remove the cap, allow the system to cool down, turn the cap to the first notch and wait until there is no more pressure. Then remove the cap.

Warning: Check and service the cooling system according to the instructions given in this manual.

TRIM THIS EDGE

Coolant solution Put only ethylene-glycol coolant solution in the cooling system. Use good quality ethylene-glycol that has a high boiling point, with no additives to prevent leakage. Do not use non-approved anti-rust additives. Anti-rust additives and ethylene-glycol can mix and work against each other, thereby reducing anti-corrosion protection, forming deposits in the cooling system and causing damage to the cooling system and radiator. Consult your authorized LBX Link-Belt distributor for suitable coolant solution.

142

TRIM THIS EDGE LEFT PAGE Bur 6-25600


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

CONNECTING BOOSTER BATTERIES

1min
page 199

BATTERIES

2min
pages 197-198

SHIMMING THE BUCKET

1min
page 185

AIR CONDITIONING

2min
pages 187-189

REPLACING A BUCKET

1min
pages 183-184

TRAVEL REDUCTION GEARS

1min
pages 171-172

RADIATOR AND OIL COOLER

1min
page 178

SWING REDUCTION GEAR

1min
pages 168-170

HYDRAULIC SYSTEM

10min
pages 153-163

AIR FILTER

3min
pages 164-167

COOLING SYSTEM

2min
pages 146-148

FUEL SYSTEM

2min
pages 149-150

RELEASING PRESSURE IN THE HYDRAULIC SYSTEM

1min
pages 151-152

TRANSPORTING THE MACHINE

3min
pages 122-126

130 LX LONG ARM TRANSPORT POSITION

1min
pages 127-128

ENGINE

2min
pages 143-145

AUXILIARY HYDRAULIC (optional

2min
pages 117-121

LOWERING ATTACHMENT IN EVENT OF FAILURE

1min
page 116

TOWING THE MACHINE

1min
page 115

PARKING THE MACHINE

1min
page 114

FILLING THE BUCKET

1min
page 113

MACHINE TRAVEL

2min
pages 107-109

STOPPING THE ENGINE

1min
page 104

MACHINE OPERATION

2min
pages 105-106

OPERATING THE MACHINE IN COLD WEATHER

1min
page 103

ENGINE OPERATION

1min
page 102

BREAK-IN PERIOD

1min
page 96

TOWING EYES

1min
page 89

TOOL SUPPLY VALVES (OPTIONAL

1min
pages 91-92

STARTING THE ENGINE

1min
pages 98-100

MACHINE OPERATION

2min
pages 94-95

BRINGING THE MACHINE UP TO OPERATING TEMPERATURE

1min
page 101

LIFTING EYE

1min
page 88

SIDE DOORS

1min
pages 85-87

FUEL TANK

1min
pages 83-84

MAINTENANCE AND ADJUSTMENTS

3min
pages 25-26

ANTI-THEFT DEVICE

3min
pages 60-62

MAINTENANCE

4min
pages 19-21

DECALS

4min
pages 27-38

130 LX BLADE OPTION

2min
pages 67-71

STEPS AND ACCESS HANDLES

2min
pages 44-45

LOWER FRONT WINDOW

1min
page 81

FIRE OR EXPLOSION PREVENTION

1min
page 18

BURN PREVENTION

1min
page 16

SAFETY RULES

1min
page 11

PERSONAL SAFETY

1min
page 13

BEFORE OPERATION

1min
page 14

FIRE EXTINGUISHER

1min
page 17

MACHINE OPERATION

2min
page 15

TO THE OWNER

2min
page 6

UTILITY SAFETY

1min
page 12
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Linkbelt 130-160 LX EXCAVATOR OPERATOR'S MANUAL - PDF DOWNLOAD by www.heydownloads.com - Issuu