Linkbelt 130-160 LX EXCAVATOR OPERATOR'S MANUAL - PDF DOWNLOAD

Page 105

OPERATING INSTRUCTIONS

MACHINE OPERATION Operating instructions

Watch carefully and make sure you are aware of places where other people are working in your work area. Keep all other people away from the machine. Serious injury can result if these instructions are not followed. Take note of the locations of pipes/ cables before starting work. Electrical cables, gas and water pipes and other underground installations can cause serious injury.

Never hit or push material with the sides of the bucket.

Never sweep the ground with the bucket to level rubble.

When operating the control levers, a whistling sound will be heard if the control lever is held in position while the corresponding cylinder is at the end of its stroke. In this case release the control lever.

The following operations are likely to damage the machine. You are therefore advised to avoid them :

Modify your travel to suit working conditions (sloping or rough ground), the nature of the ground and weather conditions.

1. Excavation using the weight of the machine as a force of impact. 2. Excavation using the machine’s travel force.

On steep slopes keep the engine speed at a maximum and travel in Low.

When traveling at right angles to the slope, move on to the slope at low speed. Never reduce engine speed when traveling down slopes.

If earth or mud stays stuck inside the bucket, open and close the bucket several times so as to loosen the earth or the mud.

After work, remove any mud and clean the machine.

When using the upperstructure swing, never change the direction of swing too suddenly.

When traveling up or down a slope, place the bucket about 250 mm (10 inches) above the ground.

Avoid turning the machine on steep slopes.

Holes, obstacles, debris and other danger risks in the working area can cause serious injury. Inspect and note all possible risks before driving the machine in a new working area. Do not work close to a live overhead electric cable without first making sure that the following minimum distances are respected : Keep all parts of the machine at least 4.6 m (15 feet) away from the power source.

101

TRIM THIS EDGE RIGHT PAGE Bur 6-25600

TRIM THIS EDGE

!

Warning: Follow the operating instructions listed in this chapter. Any other practice which has not received the prior approval of the manufacturer is considered to be strictly forbidden.


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

CONNECTING BOOSTER BATTERIES

1min
page 199

BATTERIES

2min
pages 197-198

SHIMMING THE BUCKET

1min
page 185

AIR CONDITIONING

2min
pages 187-189

REPLACING A BUCKET

1min
pages 183-184

TRAVEL REDUCTION GEARS

1min
pages 171-172

RADIATOR AND OIL COOLER

1min
page 178

SWING REDUCTION GEAR

1min
pages 168-170

HYDRAULIC SYSTEM

10min
pages 153-163

AIR FILTER

3min
pages 164-167

COOLING SYSTEM

2min
pages 146-148

FUEL SYSTEM

2min
pages 149-150

RELEASING PRESSURE IN THE HYDRAULIC SYSTEM

1min
pages 151-152

TRANSPORTING THE MACHINE

3min
pages 122-126

130 LX LONG ARM TRANSPORT POSITION

1min
pages 127-128

ENGINE

2min
pages 143-145

AUXILIARY HYDRAULIC (optional

2min
pages 117-121

LOWERING ATTACHMENT IN EVENT OF FAILURE

1min
page 116

TOWING THE MACHINE

1min
page 115

PARKING THE MACHINE

1min
page 114

FILLING THE BUCKET

1min
page 113

MACHINE TRAVEL

2min
pages 107-109

STOPPING THE ENGINE

1min
page 104

MACHINE OPERATION

2min
pages 105-106

OPERATING THE MACHINE IN COLD WEATHER

1min
page 103

ENGINE OPERATION

1min
page 102

BREAK-IN PERIOD

1min
page 96

TOWING EYES

1min
page 89

TOOL SUPPLY VALVES (OPTIONAL

1min
pages 91-92

STARTING THE ENGINE

1min
pages 98-100

MACHINE OPERATION

2min
pages 94-95

BRINGING THE MACHINE UP TO OPERATING TEMPERATURE

1min
page 101

LIFTING EYE

1min
page 88

SIDE DOORS

1min
pages 85-87

FUEL TANK

1min
pages 83-84

MAINTENANCE AND ADJUSTMENTS

3min
pages 25-26

ANTI-THEFT DEVICE

3min
pages 60-62

MAINTENANCE

4min
pages 19-21

DECALS

4min
pages 27-38

130 LX BLADE OPTION

2min
pages 67-71

STEPS AND ACCESS HANDLES

2min
pages 44-45

LOWER FRONT WINDOW

1min
page 81

FIRE OR EXPLOSION PREVENTION

1min
page 18

BURN PREVENTION

1min
page 16

SAFETY RULES

1min
page 11

PERSONAL SAFETY

1min
page 13

BEFORE OPERATION

1min
page 14

FIRE EXTINGUISHER

1min
page 17

MACHINE OPERATION

2min
page 15

TO THE OWNER

2min
page 6

UTILITY SAFETY

1min
page 12
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Linkbelt 130-160 LX EXCAVATOR OPERATOR'S MANUAL - PDF DOWNLOAD by www.heydownloads.com - Issuu