1 minute read

Insulate the battery terminals

25. Install the fitting (21) the port “A” the lower control valve. 26. Install the socket tee (22) the fitting (21) the lower control valve. 27. Install the two fittings (20) the socket tee (22) the lower control valve. 28. Connect the loose end the hose (32) the lower fitting (20) installed the socket tee (22) (lower control valve), shown in figure . 29. Install the socket tee (22) the fitting the port “A” the upper control valve. 30. Install the fitting (20) the socket tee (22) the upper control valve. 31. Install the socket ° elbow (25) the fitting (20) installed the socket tee (22) (upper control valve), shown in figure .

32. Disconnect the hose (AF) from the port “B” the lower control valve the front the cab.

33. Install the socket tee (22) the fitting the port “B” the lower control valve the front the cab.

Install the fitting (20) the socket tee (22) , shown in figure

LEIL16GRD0036BB 19

LEIL16GRD0037AB 20

LEIL16GRD0038AB 21

This article is from: