1 minute read

Remove the bolts (N) with the relevant washers and nuts. Remove the bolt (P) with the relevant washer . Remove the cover assembly (Q) the front frame.

4 - ASSEMBL Y

Moldboard control

Moldboard control - Install

Blade control valve installation W ARNING

Heavy object! WA YS use a hoist get assistance lift the component. Failure comply could result death serious injury .

W0086A

a workbench, install the two fittings (3) and the six fittings (5) the blade control valve (2) . Install the hydraulic connector (4) the blade control valve (2) .

Fix the blade control valve (2) the bracket (1) means the flange bolts (6) .

LEIL16GRD0018BB 1

LEIL16GRD0019AB 2

This article is from: