Gehl 135 Manure Spreader Operator's & Service Parts Manual 904901 - PDF DOWNLOAD

Page 35

CHAPTER 10 PREPARING FOR FIELD OPERATION ASSEMBLED SPREADER GEHL Box Spreaders have a Beater Clutch which con­ trols operation of the Beater. Before loading Spreader and before engaging the PTO to unload the Spreader, BE SURE the Control Indicator (on the front of the Spreader) is in the "Start" position. Then, engage the

PTO at a low RPM. Shear Bolt overload protection is provided for both the Apron Drive and Main Drive Shaft. Refer to the Operation chapter for additional details. If Spreader is going to be operated in freezing temperatures, BE SURE to review and comply with recommendations set forth in the Operation chapter, under the Winter Operation topic.

33


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Gehl 135 Manure Spreader Operator's & Service Parts Manual 904901 - PDF DOWNLOAD by www.heydownloads.com - Issuu