Gehl 1202 Compact Excavator Operator's Manual 908170 03.2007 - PDF DOWNLOAD

Page 31

CHECKLISTS Pre-Delivery

____________________________________________

The following checklist is an important reminder of valuable information and inspections that MUST be made before delivering the machine to the customer. Check off each item after the prescribed action is taken

Dealership’s Name ____________________________________________ Dealer Representative’s Name ____________________________________________

Check That:

Remove dealer’s file copy at this line.

R

Date Checklist Filled Out

Machine has not been damaged in shipment. Check for such things as dents and loose or missing parts. Correct or replace components as required.

____________________________________________ Model & Serial Number

Delivery

R

Battery is securely mounted and not cracked. Be sure cable connections are tight.

R

Cylinders, hoses and fittings are not damaged, leaking or loosely connected.

R

Filters are not damaged, leaking or loosely secured.

The following Checklist is an important reminder of valuable information that MUST be passed on to the customer at the time the unit is delivered. Check off each item as you explain it to the customer.

R

Machine is properly lubricated and no grease fittings are missing or damaged.

Check That:

R

Hydraulic system reservoir, engine crankcase and drive motors are filled to their proper levels.

Review with the customer the contents of this manual; especially:

R

All adjustments are made to comply with settings provided in Chapter 5 Maintenance of this manual.

R

The Safety and Operation chapters of this manual, regarding the safe operation of the machine.

R

All guards, shields and decals are in place and secured.

R

R

Model and serial numbers for the machine are recorded in the space provided on this page and on page 1.

The Maintenance and Troubleshooting chapters for information regarding the proper maintenance of the machine. Explain that regular lubrication and maintenance is required for continued safe operation and long machine life.

R

Give this Operator’s Manual to the customer and instruct the customer to read and completely understand the contents before operating the machine.

R

Completely fill out the Owner’s Registration, including customer’s signature and return it to the Gehl Company.

R

Explain that a copy of the product warranty is included on the inside front cover of this operator’s manual.

IMPORTANT: Start the engine and test run the unit while checking that all controls operate properly.

Check That: R

Drive controls and boom/arm/bucket/dozer blade/ swing/pivot controls operate properly and are not damaged or binding.

R

Drive controls are properly adjusted for correct neutral position.

R

The parking and travelling gear brake, along with the lock-out devices, are activated with the machine stationary (no pilot control pressure).

R

All hydraulic functions are NOT operational with the left control console in the raised lock-out position.

____________________________________________ Customer’s Signature ____________________________________________ Date Delivered

I acknowledge that pre-delivery procedures were performed on this unit as outlined on this page.

Printed in U.S.A

25

908170/BP0307


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Gehl 1202 Compact Excavator Operator's Manual 908170 03.2007 - PDF DOWNLOAD by www.heydownloads.com - Issuu