CAT Roof Support PMC-R Shield Control System Operation Manual

Page 66

PUSH ERROR conveyor push timeout Push failed to complete in time; check Conveyor Push Time.

Parameter Summary Push Protection Full, Partial, None Options for protecting conveyor: Full is best option. Delta Protection On, Off This determines whether the delta action is allowed during the push cycle. Abort Dist 1-6 Distance on each side that will abort if a shield is left back. Max Time Max time for push to complete.

2000-9000

Bankpush Start Group 1-10 How many shields that will come on at start of Bankpush. Locking Push key For Time, For Stroke Lock-Push Key works for time or stroke. Locking Push Tgt Stk 1-100 Sets target stroke for Lock-Push key. Headgate Push Ctl 1-10 Number of HG shields that push evenly at the same time. If set to 5, then #5 controls the HG push. Headgate Push Group 1-20 Number of HG shields that are not allowed to push farther than the ‘HG Push Control’ shield. Tailgate Push Ctl 1-10 Number of TG shields that push evenly at the same time. If set to 5, then 5th shield from TG controls the TG push. Tailgate Push Group 1-20 Number of TG shields that are not allowed to push farther than the shield that is ‘TG Push Control’ from the TG.

© Caterpillar

58


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.