OPERATING INSTRUCTIONS
LIFTING THE MACHINE WITH A CRANE When lifting this machine with a crane, use a four leg sling with a 7,000 pound (3175 kg) maximum rating with a 39 degree sling angle. Each leg of the sling must have a minimum length of 6 ft. (1.8m). 1. Know and use correct crane signals. 2. Inspect the lifting equipment daily for damaged or missing parts. 3. Keep all other persons out of the area when lifting. Do not move the machine over the heads of other persons. NOTE: It may be necessary to use spreader bars when lifting the machine with a crane. The length of the spreader bars should equal the width of the canopy roof. One bar should be installed between the right and left front sling legs, while the second bar should be installed between the right and left rear sling legs.
TRIM THIS EDGE
FOUR LEG SLING
6 FEET (1.8 m)
LIFTING BRACKETS