EVS-TCB User Manual

Page 42

Temperature Controlled Bath – USER MANUAL

Shipping the Instrument Before shipping the Temperature Controlled Bath, follow these steps: Step 1: Turn Off the instrument and remove the power cable Step 2: Empty the tank using a Syphon or pump Step 3: Empty the coolant tank Step 4: Use the original packaging or a wooden shipping crate Step 5: Ensure plenty of foam or packaging material is in the bottom of the case Step 6: Lift the instrument carefully into the packing case – 2 people minimum Step 7: Ensure the packing case is on a pallet

POULTEN SELFE & LEE LTD

EVS_TCB_V1.04

41


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
EVS-TCB User Manual by Sophie Gosling - Issuu