EVS-TCB User Manual

Page 41

Temperature Controlled Bath – USER MANUAL

Moving the Instrument Before moving the Temperature Controlled Bath, follow these steps: Step 1: Turn Off the instrument and remove the power cord Step 2: Empty the tank using a Syphon or pump Step 3: Lift the instrument on to a trolley – 2 people required Step 4: Move to new location Step 5: Follow the installation steps in the manual

POULTEN SELFE & LEE LTD

EVS_TCB_V1.04

40


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.