Grove Crane TMS800E Operator's Manual - PDF DOWNLOAD

Page 91

TMS800E OPERATOR’S MANUAL 6.

SET-UP AND INSTALLATION

Remove retainer clip (1, Figure 4-15) from the pin attaching the 7m (23 ft) section to the base section.

.

10. Use the controller to pivot the boom extension so that lugs (1, Figure 4-18) on boom extension align with the holes in the lugs (2) on the boom nose.

2

1

1

6642-5

FIGURE 4-15 FIGURE 4-18

6642-11

7.

Remove the stowage pin (1,Figure 4-16).

11. Remove pins (1, Figure 4-19) stowed in extension and install in holes (right side of boom nose) and secure with retainer clips (2).

1

1

6642-6

4

FIGURE 4-16 2

8.

6642-13

Stow the pin (1, Figure 4-17) in pin holder (2) provided on the swingaway extension.

FIGURE 4-19 12. Remove the clip pin (1, Figure 4-20) from the stowage pin (2) at the front mount. Unpin the stowage pin (2) and store in holder (3).

2 2 3 1

6642-7

1

9.

FIGURE 4-17

Remove the jib stowage controller from behind the seat in the superstructure cab.

GROVE

6642-46

Published 12-22-2008, Control # 107-09

FIGURE 4-20

4-13


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.