3 - ASSEMBLY
Upper main line installation
SMIL15CEX8800FB
1
Upper Main Line Installation (left side) 1. Install the bracket (16) on the frame with four sems bolts (12).
SMIL15CEX8801AB
2
SMIL15CEX8802AB
3
2. Install the electromagnetic proportional relief valve (2) on the bracket (16) with two sems bolts (12). Install the elbow (9) on the electromagnetic proportional relief valve (2) B port. Set the O-ring (4) on the elbow (9) and connect the hydraulic hose (33). • Tightening torque: 142.349 lb ft)
157 - 193 N·m (115.797 -