12 Operation – Control terminal 12.4 Basic setting (initialisation)
12.4.2 Initialization completed At the end of initialization:
• Switch the control unit off – see Switching the control terminal on and off, page 100.
• Then switch it on again. • The control unit must be adjusted to the specific requirements again – see Adjustments using the control terminal, page 103.
0293 133.6 - BA LINER 3000
119