
1 minute read
7.2 Removing and installing high-pressure pump
Note
The threads of the shear bolts are secured with locking fluid. To unscrew these bolts, the threads must therefore be heated with the hot air blower.
– Set the hot air blower as shown in illustration. In other words, set potentiometer for temperature regulation -2- to maximum heating output and 2-stage switch for air volume -3- to position 3.
NOTICE
Risk of damage to adjacent components caused by hot air blower. Risk of overheating. – If necessary, cover adjacent components.
– Heat head of shear bolt -1- for approx. 20 to 30 seconds.
– Unscrew shear bolt -1- with screwdriver -2-.


Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not permitted unless authorised by SEAT S.A. SEAT S.A does not guarantee or accept any liability with respect to the correctness of information in this document. Copyright by SEAT S.A.
