JGC-Tecnimont Joint Venture

MONTHLY SAFETY MEETING for March 2013

Habshan 5 IGD Project, Abu Dhabi, UAE


PRESENTATION AGENDA                 

Monthly Meeting March 2013

Project Lost Time Injury Frequency Rate & Recordable Frequency Rate; Days and Man-hours without LTI and Days and Man-hours without RI; JV Monthly Medical Consultation for March 2013; Cumulative Up to March 2013, FAC Body Part for March 2013; Manpower & Observation Up to March 2013; Area Violation, Incident Violation for the Month of for March 2013; Noncompliance with safe work Issues for March 2013; Poor Housekeeping Issues for March 2013; Equipment & Tool Issues for March 2013; PPE Issues for March 2013; JV Risk Assessment Graph, High Medium & Low Risk Analysis; NM, UC & UA Observation Report and Trend Analysis for JV; Toolbox Meeting, Safety Moment; Training Man-Hours Up to March 2013; Monthly KPI and Target 2010 – 2013; Safety Achievement for March 2013; Commissioning Activities & Safety Campaign for April 2013.


Lost Time Injury Frequency Rate Lost Time Injury Frequency Rate

Target LTIR = 0.02

LTIR

0.04 0.01

0.02 0.002 0

MONTH

Construction

Period

To Date

Man-Hours

2,672,085

128,225,922

LTI

0

1

LTIR

0.00

0.002

Days w/o LTI

619

Up to 29/3/2013

0.01

Date of Last LTI Case

19-Jul-11

Man-Hours Worked Since Last LTI

93,604,943

Total Recordable Injury Rate

TRIR

Total Recordable Injury Rate 1.20 1.00 0.80 0.60 0.40 0.20 0.00

MONTH

Target TRIR = 0.20

Construction

Period

To Date

Man-Hours

2,672,085

128,225,922

Recorable Case

0

33

0.26

TRIR

0.05

Days w/o Rec. Case

0.02

2010 2011 2012

2013

0.00

0.05

0.26

Up to 29/3/2013

138

Date of Last Rec. Case

11-Nov-12

Man-Hours Worked Since Last RI

16,795,633

LOST TIME INJURY FREQUENCY RATE - PROJECT YEARLY STATISTICS

0.003 0.002 0.002 0.002

0.00

FIRST AID CASE COMPARISON TABLE 3 2 1 0

PTD

RIR, LTI x 1,000,000/man-hours - Company RIR, LTI x 200,000/man-hours - JV

3 2 1

1


JV DAYS & Man-hours Without LTI Up to March 2013

Monthly Meeting March 2013

Date of Last LTI Case : 19th July 2011

93,604,943 100,000,000 80,000,000

up to Mar. 29, 2013

60,000,000 40,000,000

20,000,000 0 January 7, 2010 Starting Project

0


JV DAYS & Man-hours Without Recordable Up to March 2013

Monthly Meeting March 2013

Date of Last RI Case : 11th November 2012

40,000,000 30,000,000 20,000,000 10,000,000 0

January 7, 2010 Starting Project

16,795,633 up to Mar. 29, 2013 0



JV Monthly Medical Consultation

Monthly Meeting March 2013 235

Others, Backache, Muscular Pain, Toothache, Etc. Heat Stress

0 0

Major Accident/Injury

0 0

First Aid Minor Scratches, Bruises, Laceration, Abrassions, Insect Bites, Etc.

0 2 74

Skin Infection / Allergy

1,093

271

75

EENT (Eyes, Ear, Nose and Throat)

348

20 5

Systemic Problem Hypertension Etc.

73

Gastro-Intestinal Disorder (Diarrhea Abdominal Pain) Etc.

276

11

Genito-Urinary Diseases

200 112

Respiratory Problem (Cold,Cough etc.)

0 JGC

200 TCM

602

400

600

800

1000 1200


CUMULATIVE INJURY CASES Up to March 2013

Monthly Meeting March 2013

Recordable- 33

Reportable - 485

LTI, 1

RWC, 8

MTC, 24 FAC 485

FAC-First Aid Case | MTC-Medical Treatment | RWC-Restricted Work Case LTI-Lost Injury Incident


FAC by Body Part For the Month of March 2013

Monthly Meeting March 2013

Shoulder

Finger



Manpower and Observation Monthly Meeting March 2013

Manpower

Observation

10,406

1,907


Monthly Meeting March 2013



March 12, 2013 Man-lift Violation @ Unit 550

Monthly Meeting March 2013

March 19, 2013 PTW Violation @ Unit 557

2nd

1st

Incident Violation Indicator Area Focus for the Month of March 2013


JV Job Safety Observation Monthly Meeting March 2013

Noncompliance with safe work

Poor House Keeping

Equipment & Tool

PPE


Noncompliance With Safe Work (A) Monthly Meeting March 2013


Noncompliance with Safe Work (A) Others

Monthly Meeting March 2013


Poor House Keeping (B) Monthly Meeting March 2013


PPE (D) Monthly Meeting March 2013


Equipment & Tool (C) Monthly Meeting March 2013


JV Risk Assessment Graph Feb 2013 1400

1,275

1200

Monthly Meeting March 2013 February 2013 – 2,235 March 2013 – 1,907

March 2013

1,185

1000 800 600 400

524

436

401

321

200 0 Low

Medium

High


Near Miss, Unsafe Act and Unsafe Condition Observation Report and Trend Analysis 1800 1600 1400 1200 1000 800 600 400 200 0

1,639

Monthly Meeting March 2013

Feb-2013

1,481

Mar-2013

FAC-First Aid Case | MTC-Medical Treatment | RWC-Restricted Work Case | LWC-Lost Work Case | FAT – Fatality LTI-Lost Time Injury

596 426

524

401 1

2

0 0

0 0

0 0

0 0

0 0



Toolbox Meeting & Safety Moment Monthly Meeting March 2013 PTW System

17,803 hrs.

Accept Your Responsibility

Commissioning Activities PPE Phase I - II

18,643 hrs.

Stop Work Policy

H2S Awareness

Fire Gas Alarm System

17,419 hrs.

17,640 hrs.

Everybody Makes Mistakes

Safe Worker


Total Training Man-Hours 2,558,076 Monthly Meeting March 2013



Monthly KPI and Target 2010 – 2013 Monthly Meeting March 2013 1

Fatality Rate

1

0.03

Lost time Injury Frequency Rate

Target 0.02

0.02 0.01

Target 0

0

0 Actual Fatality

Actual LTIR

Target Fatality

Total Recordable Injuries Rate 1.20 1.00 0.80 0.60 0.40 0.20 0.00

0.002

Target 0.20 0.05

Actual RIR

Target RIR

4000 3500 3000 2500 2000 1500 1000 500 0

Target LTIR

Observation + Near Misses Cases

Target >1000 1,907

Actual (Observation + Near Misses) Target (Observation + Near Misses)


Monthly Meeting October 2012


Commissioning Safety Alert

Monthly Meeting March 2013

12 Safety 127 SafetyAlert AlertIssued Issued during as March 2013 2013 Cumulative of March


Safety Achievements for March 2013

Monthly Meeting March 2013


Monthly Meeting October 2012


Safety Campaign

Fire and Gas Alarm System Emergency Awareness

SCBA Training


Safety Campaign

PLAN

Monthly Meeting March 2013

ENSURE

APPROACH


Safety Campaign

PLAN

Monthly Meeting March 2013

ENSURE

APPROACH When No Alarms

STARRT


Safety Achievements for March 2013

Monthly Meeting March 2013

90 Million Safe Man-hours 80 Million Safe Man-hours 60 Million Safe Man-hours 20 Million Safe Man-hours 10 Million Safe Man-hours