JGC-Tecnimont Joint Venture
MONTHLY SAFETY MEETING for January 2013
Habshan 5 IGD Project, Abu Dhabi, UAE
PRESENTATION AGENDA
Monthly Meeting January 2013
Project Lost Time Injury Frequency Rate & Recordable Frequency Rate; Days and Man-hours without LTI and Days and Man-hours without RI; JV Monthly Medical Consultation for January 2013; Cumulative Up to January 2013, FAC Body Part for January 2013; Manpower & Observation Up to January 2013; Area Violation, Incident Violation for the Month of for January 2013; Noncompliance with safe work Issues for January 2013; Poor Housekeeping Issues for January 2013; Equipment & Tool Issues for January 2013; PPE Issues for January 2013; JV Risk Assessment Graph, High Medium & Low Risk Analysis; NM, UC & UA Observation Report and Trend Analysis for JV; Toolbox Meeting, Safety Moment; Training Man-Hours Up to January 2013; Monthly KPI and Target 2010 – 2013; Safety Achievement for January 2013; Commissioning Activities & Safety Campaign for February 2013.
Lost Time Injury Frequency Rate Construction
Period
To Date
Man-Hours
4,224,388
122,414,403
LTI
0
1
LTIR
0.00
Days w/o LTI
563
0.002
0.01
Up to 1/2/2013
Date of Last LTI Case
19-Jul-11
Man-Hours Worked Since Last LTI
87,793,424
Total Recordable Injury Rate Construction
Period
To Date
Man-Hours
4,224,388
122,414,403
Recorable Case
1
33
TRIR Days w/o Rec. Case
0.00
0.00 82
0.05
0.27
Up to Up to 1/2/2013
Date of Last Rec. Case
11-Nov-12
Man-Hours Worked Since Last RI
10,984,114
RIR, LTI x 1,000,000/man-hours - Company RIR, LTI x 200,000/man-hours - JV
JV DAYS & Man-hours Without LTI Up to January 2013
Monthly Meeting January 2013
Date of Last LTI Case : 19th July 2011
87,793,424 80,000,000
up to Feb. 1, 2013
60,000,000 40,000,000 20,000,000 0 January 7, 2010 Starting Project
0
JV DAYS & Man-hours Without Recordable Up to January 2013
Monthly Meeting January 2013
Date of Last RI Case : 11th November 2012
40,000,000 30,000,000 20,000,000 10,000,000 0 January 7, 2010 Starting Project
2,848,819 up to Feb. 1, 20130
JV Monthly Medical Consultation
Monthly Meeting January 2013
469
Others, Backache, Muscular Pain, Toothache, Etc. Heat Stress
0 0
Major Accident/Injury
0 0
First Aid Minor Scratches, Bruises, Laceration, Abrassions, Insect Bites, Etc.
2 1
Skin Infection / Allergy
107
EENT (Eyes, Ear, Nose and Throat)
112
1,388
322
344
53 21
Systemic Problem Hypertension Etc. Gastro-Intestinal Disorder (Diarrhea Abdominal Pain) Etc.
105 7
Genito-Urinary Diseases
339
155 291
Respiratory Problem (Cold,Cough etc.)
0 JGC
903
200 400 600 800 1000120014001600 TCM
CUMULATIVE Up to January 2013
Monthly Meeting January 2013
Recordable
Reportable
LTI, 1
RWC, 8
FAC 482
MTC, 24 FAC-First Aid Case | MTC-Medical Treatment | RWC-Restricted Work Case LTI-Lost Injury Incident
FAC by Body Part For the Month of January 2013
Monthly Meeting January 2013
Wrist, 1, 33%
Forehead, 2, 67%
Manpower and Observation Manpower
Monthly Meeting January 2013 Observation
14,883 13,301
2,639
2,244
Area Violation by Issues for the Month of January 2013
Monthly Meeting January 2013
January-16-2013 Restricted Area @ C200
Monthly Meeting November 2012
1ST
1st
January-06-2013 Falling Object @ C200
Incident Violation Indicator Area Focus for the Month of January 2013
JV Observation Table
Monthly Meeting January 2013
Noncompliance with safe work
Poor House Keeping
Equipment & Tool
PPE
Noncompliance With Safe Work (A)
Monthly Meeting January 2013
JGC Area-128 PTW, 4 No JSA, 1
Traffic Rule, 2
Excavation safety, 0
TCM Area-1,044 Lifting & Rigging, 16
PTW, 7 No JSA, 3
Electrical Safety rule, 2
Others, 824
Work at Height, 26
Lifting & Rigging, 28 Electrical Safety rule, 50 Fire Prevention, 48
Fire Prevention, 7 Others, 70
Traffic Rule, Excavation safety, 2 5
Work at Height, 77
Noncompliance with Safe Work (A) Others
Monthly Meeting January 2013
JGC Area-70 No No Scaffolding, Grating, 1 Banksman, Flagman, 1 2 1 Worker Barricade, 2 Behavior, 1
Confined Space, 3
Fall Prevention, 3
Electrical Fire Safety rule, 50 Prevention, 48
3
Health, 7 Restricted Area, 8
STARRT CARD Violation, 1
Hygiene, 12
Security, 2
Signage, 13
Falling Object, 1
Commissioning Violation,
TCM Area-824
Grating, 16
Good Result
illumination, 17
STOP Work Policy, 182
Open Hole, 26 Commissioning Violation, 26
Trip/Slip/Fall, 35
STOP Work Policy, 59
No Flagman, 41
Barricade, 164 Cable Management, 88
Scaffolding, 64
Access and egress, 59
Environmental, 48
STOP WORK POLICY Good Results
Monthly Meeting January 2013
Poor House Keeping (B)
Monthly Meeting January 2013
JGC Area-22 Segregation of waste, 1 Protruding Nails, 0
TCM Area-616
Hazardous Material Storage, 1
Protruding Nails, 9
Material Arrangement , 10
Hazardous Material Storage, 15 Waste Disposal, 48
Waste Disposal, 2
Segregation of waste, 55
Material on Access, 8 Cleaning of Rubbish on site, 5 Material Arrangement, 5
Cleaning of Rubbish on site, 352
Material on Access, 127
Equipment & Tool (C)
Monthly Meeting January 2013
JGC Area-14 Wrong equipment/
Unauthorized equipment/ Tool,
TCM Area-214 Unauthorized equipment/
Unauthorized Operation, 1
Wrong equipment/
Tool,
Tool,
Tool,
No/wrong colour code, 2 No Inspection with tag/sticker, 4
Poor Maintenance , 23
Unauthorized Operation, 25
No Inspection with tag/sticker, 61 Poor Maintenance, 2
Incorrect Usage, 3
Incorrect Usage, 36
Inappropriate Safety Device, 2
No/wrong colour code, 30
Inappropriate Safety Device, 29
PPE (D)
Monthly Meeting January 2013 JGC Area-32
Inappropriate Clothes, 0
TCM Area-174
No Safety Shoes, 1 No Hard Hat, 2 No Body Harness/
No Safety Shoes, 0
No Hard Hat, 5
No Respiratory Protection, 7 No Ear Protection, 9
Lanyard,
No Hand Protections, 18 No Eyes/Face Protections, 11
No Eyes/Face Protections, 89
No Ear Protection, 4
No Hand Protections, 7 No Respiratory Protection, 4
No Body Harness/Lany ard, 19 Inappropriate Clothes, 27
JV Risk Assessment Graph
Monthly Meeting January 2013
Joint Venture Observation – 2,244
JGC
TCM
1400
1,286
1200 1000 800 600
200
393
369
400 62
14
0 Low
Medium
120
High
Near Miss, Unsafe Act and Unsafe Condition Observation Report and Trend Analysis 1800 1600 1400 1200 1000 800 600 400 200 0
Monthly Meeting January 2013
1,585
JGC
TCM
FAC-First Aid Case | MTC-Medical Treatment | RWC-Restricted Work Case LWC-Lost Work Case | FAT – Fatality LTI-Lost Time Injury 463 89
107
393 120
2
1
0 0
0 0
0 0
0 0
0 0
Toolbox Meeting & Safety Moment Monthly Meeting January 2013
Total Training Man-Hours 2,384,561
Monthly Meeting January 2013
127,099
Training Man-hours – 127,099
Supervisor Training TCM
1,112
JGC
1,320
Monthly Meeting January 2013 Specific Training TCM JGC
Site Training TCM
JGC
86,383
8,118
28,450
1,180
432
104 PERMIT TO WORK, LOCKOUT TAG OUT & SUPERVISOR SKILL LEADERSHIP WORKSHOP
WORK AT HEIGHT STARRT & JSA CONFINED SPACE ENTRY SAFE DRIVING FIRE FIGHTING IIF Orientation Heat Stress SAFE USE OF HAND GRINDER Inert GAS ELECTRICAL SAFETY HAZARD IDENTIFICATION…
STARRT/TOOLBOX MEETING/COACHING
Monthly KPI and Target 2010 – 2013 Monthly Meeting January 2013 Fatality Rate
1
1
0.03
Lost time Injury Frequency Rate Target 0.02
0.02 0.01
Target 0
0
0 Actual Fatality
Actual LTIR
Target Fatality
Total Recordable Injuries Rate 1.20 1.00 0.80 0.60 0.40 0.20 0.00
0.002
4000 3500 3000 2500 2000 1500 1000 500 0.05 0
Target 0.20
Actual RIR
Target RIR
Target LTIR
Observation + Near Misses Cases Target >1000 2,244
Actual (Observation + Near Misses) Target (Observation + Near Misses)
Monthly Meeting October 2012
Safety Achievements for January 2013
Monthly Meeting January 2013
Monthly Meeting October 2012
Commissioning Safety Alert
Monthly Meeting January 2013
Safety Campaign
Monthly Meeting January 2013
Safety Campaign
Monthly Meeting January 2013
Safety Campaign
Monthly Meeting January 2013