RPV-3 software – USER MANUAL
Home Page
After pressing “START MEASUREMENT” the software will automatically open the Home page. The first stage of the test cycle is to check the bath stability – this will be followed by the equilibrium period (as set in the method) followed by the sample push up. Flow times will be measured and final results will be reported.
The measurement process will start automatically and will continue unless the Abort button is selected at any time. The black Position banner will display the status of the test. Other fields will be populated with measured data and calculated results
PSL RHEOTEK VERSION 2.03
20