BIM-GIS implementation - BIM Business case study

Page 7

Advantage Easy to do

Has

Has

georeferencing

georeferencing, free,

easy

to

model, and easy to

import

into

UE4

Limitation Not

accurate, Not

doesn’t

free,

not

have completely

georeferencing

accessible.

Table 1: comparing three approaches The three outcomes were displayed to COWI participants during the process, and the outcome was discussed. It is proposed to contour Approach 3 and adjust the topography for better visualisation around Harbour Lake and to make it appear more accurate. By using this as the main file, the final result has been made to produce additional alterations such as adding vegetation and a bridge.

2.2 AND OTHER When it says other it includes adding materials trees and other elements to make it look aesthetics. Aesthetics is defined as the study of nature and the presentation of beauty or taste (Group, 2020). It may not be one of the most crucial factors to consider, but in the end, it is more gratifying to see the project as beautiful as achievable. CCO materials have been used for the grass, and rock. A foliage has been created for creating trees, bushes, rocks and random elements along the site.

3 BIM-GIS STRATEGY – IMPLEMENTATION PLAN 3.1 WHAT IS THE IMPLEMENTATION PLAN? In the COWI project As, the model is georeferenced as well as worked in a game engine, allowing the model to be uploaded into a sandbox platform. Now consider how georeferencing may be used to strengthen the model further, such as in maintenance, construction, and inspection. The proposed implementation strategy involves the use of GIS services for asset management via AR/VR. A building has many useful things which are also indicated as assets (collins, 2022). As stated in ISO 55000 concerning assent management, An organisation organises its actions to produce value from assets (bsi., 2014). BIM manages the life cycle of assets in buildings pg. 6


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
BIM-GIS implementation - BIM Business case study by aneesh wa - Issuu