BIM in Design Coordintion

Page 1

ACADEMIC HUB ANNEX BIM in Design coordination – Group 6


CONTEXT BIM Design Project Management Introduction ▪ Project Scope ▪ Introduce team ▪ Client portfolio

▪ Responsibilities ▪ Timelines ▪ Meeting log

▪ Architecture Design ▪ Design Process ▪ Structural Design ▪ MEP Design ▪ Collaboration ▪ BIM Benefits in Design

▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪

Responsibilities Clash Detection Its Challenges Green BIM BIM workflow BREEAM Strategy Solar Analysis Energy Analysis BIM Deliverables Collaboration Lifecycle approach

Cost Conclusion ▪ ▪ ▪ ▪

Responsibilities Exporting Data Costing Life Cycle Costing

▪ Risk assessment ▪ Health and safety ▪ Conclusion

Real Estate


PROJECT S

C

O

P

E

“ Applying BIM Process and Technology Through Out the Design Stages ” We manage, design, analyze and value the project by considering sustainability and lifecycle of the building.


Client Requirements

University Of The West of England, Bristol. 26,200m² of site area and counting…

ACADEMIC HUB ANNEX

LINK E&D Block Extend Library Entrance Catering Space in E Block

BREEAM Landscape Plaza PC Based Learning Space Student Services

New Reception Exhibition

Real Estate


Our Team

Lead Designer

BIM Manager

Peter Oladapo Aremu

Aneeshwa Sri Sriramoju

Structural Engineer Tochukwu Ozomagbo

MEP Engineer Ansa Joy

BIM Coordinator Bincy Francis

Project Manager Sherifat Adeleye

Cost Manager Jodie Wood

Project Manager

Health & Safety Manager

Cost Engineer

Elijah Kalejaiye

Vijeyabalan Vaamanan

Contents Title


ROLES

Team Roles and Responsibilities

BIM TEAM

NAMES

Aneeshwa Sriramoju Bincy Francis

The CADROOM mentioned that to improve the operational efficiencies of the project team, project managers should use BIM as a tool for better communication and collaboration on projects. Project managers might take advantage of this occasion to offer strategic guidance on the organization's overall change. As a result, project managers must play a prominent role in the BIM debate, ensuring that their roles and methods evolve in tandem with industry-wide changes. As a result, they must stay abreast of new developments in BIM and construction to ensure that their knowledge and skills remain current.

PROJECT MANAGEMENT

Sherifat Adeleye Elijah Kalejaiye

RESPONSIBILITIES

DELIVERAB LES

Ensures the coordination of all BIM related scopes are done based on the expected. project outputs To achieve collaboration among all project teams.

BIM deliverables

Coordinate and ensure effective communication among team members.

Programme of work Risk register Health & Safety/CDM strategy

Vijeyabalan Vaamanan

Identifying issues and creating a risk register

DESIGN

Ansa Joy Tochukwu Ozomagbo Peter Aremu Akinsola Ayedebinu

•Based on the existing model, we explore the best location and orientation, and we produce a design proposal. The design, location and its orientation was discussed and agreed upon by the other team members.

Updated Design proposal

COST

Jodie Wood

Cost analysis of new design proposal.

Cost of proposal

Kirushoban Girlharan


Request For Information

BIM Manager Issue & Markups

Design Team Shares in CDE

BIM Coordinator Sends to Review

RFI

Project Manager Finalizes it

Closes RFI


Health and safety responsibilities Health and safety responsi bilities

Carry out risk assessments.

Identify who needs protecting from potential hazards. Implement health and safety procedures. Create a health and safety policy. Display the proper use of Personal protective equipment(PPE) Communicate with employees. Provide training and first aid kits.


Design Team 1

Lead Designer • LANDSCAPING • LINKING BRIDGE

2

Structural Designer • COLUMN • BEAMS • PAD FOOTINGS • SERVICEABILITY TEST

3

MEP Design • MEP DESIGN • ROOF DESIGN

Real Estate


Work Program For Design Team


Architectural Developed Design

Ground floor

First floor

Second floor

Third floor


Plumbing-PEX pipes(polyethylene cross linked tubing)

Lower environmental impacts during manufacturing

Reduce the total cost of the building

Reduce carbon dioxide emission

Flexible material, easy to bend.

Preserves the energy in the pipes.

Water flows faster with little sound

Bear a hightemperature supply

Prevent corrosion and holes.

Plumbing pipes and Joints added for water closets and wash basin​ Solar Pannels added 2021 MT COPELAND TECHNOLOGIES, INC.ASSESED 2021 dec 1


BIM Team BIM Manager Responsibilities :

• Setup CDE platform and connect team members • Comment on design Proposals and Project strategies from Design Team • Prepare sustainability Strategy and Maintain and operational Strategy with input from project team as required • Prepare stage design Programmed with input other design team members • Comment on Cost Information • Monitor and review progress and Performance of design team

BIM Coordinator Responsibilities : • Update and track the model and data produced by design team. • Prepare clash detection for the models. Assign the clashes to designer • Create the final issue approval workflow • Manage model revisions and track changes. models. • Worked with design team

Real Estate


CLASH DETECTION Advantages of BIM Clash Detection & Resolution

Accurate Engineering Design Documentation

Fewer Iterations during the Construction Phase

Better Coordination & Collaboration

Automatic Clash & Conflict Resolution

Architectural + M.E.P model

Federated Model


Steps to create Clash Report Using Navisworks

Hard Clash

Uploading the existing design models into the Navisworks software. separate models are merged in a single model for the further clash detection process

Choose any two category and run the clash detection The system gives us all the potential clash between those models with status details, description and condition Once we generate the clash report by clicking on the “Write Report”, it generates a detailed report

Soft Clash

Clash Report


Challenges of clash detection Creating issue in BIM 360

Assigning to the designer Lack of coordination

Lack of details in the model

Software error

Linking the model

Workplace/4D Clash Workflow or 4D Clashes involve clashes of contractor scheduling, equipment and material delivery and general workflow timeline conflicts

Real Estate


Green BIM Sustainable Design

BIM based Building performance analysis for Sustainability Assessment Building information modelling (BIM) is a collaborative working process using digital models to support virtual design and construction (VDC) which can streamline project delivery workflow and improve building performance. The use of BIM to provide data for energy performance evaluation and sustainability assessment is known as Green BIM.

Building Information Modelling

Building Performance Analysis

Main Objectives of this Project

Process Sustainability Technology

Collaboration

Dr. Sam C. M. Hui P, (2019) Basic Concept of Green Bim. New Opportunities of Using Building Information Modelling (Bim) For Green Buildings [online]., pp. 1-5. [Accessed 28 November 2021].


BIM Workflow

Create CDE

CDE

BIM Manager Creates Architect

Design Proposal A Set-up Model with existing Site

RFI

Arch Model

MEP Model

Architect

Finalised Design

Architect

Design Proposal B

Clash Detection

MEP Engineer

Federation Model

Structural Engineer

Structural Model

BIM Coordinator Sets-Up

BIM Coordinator

RFI RFI

Cost Manager Finalizes

Updated

Cost Estimation

BIM Manager

Solar Analysis BIM Manager

RFI BIM Manager

Insights Analysis

Update Design

Insights Analysis Cost Estimation

Consumes More Energy

Project Information Model Process

Handover to Operation and Maintenance Team

Cost Manager

PIM

Consumes Less Energy


Our Plan to achieve BREEAM According to BREEAM International New Construction 2016 scheme

Achieving Green attributes using Analysis & Simulation By… • Changing location, position of the building for less energy consumption. • Try to use green materials for sustainable results ( materials which helps to reduce maintenance an operation costs). • Analysing it to know environmental impact. • Using materials that helps to reduce maintenance an operation costs.

Energy Used Energy Graph Amount of energy Consumed in different stages of design. (Springer nature, 2021)

Sustainability


Solar Analysis Understanding The sun’s path And analysing day light.

Helps in…. ❖ Deciding orientation of the Building

Solar Study.

❖ To Know Solar Panel Position ❖ Knowing Position of Building ❖ Analyzing Daylight inside the Building

Solar Analysis

Lighting Analysis

Technology


ENERGY A N A LY S I S

Building Energy Performance Evolution of Design with respective to Building Energy Performance.

Finalised design in 4 Revisions

Revision 3

4

• Changed location of building • Added Solar Panels. • Changed Material.

Designers Proposals

Revision 2

3

• Changed orientation and position of Building

Design Proposal B

Technology Revision

1

2

• Altered Roof Heights and Lopes and window shadows

Design Proposal A

1

Building Insights Real Estate


Energy Use Charts Energy Summary

Exporting Files

Photovoltaic Surface Analysis

Water Usage Analysis

LEED Daylighting analysis

Building Energy Performance


Brief Study on Green Building Studios and How it is used

Pros • Automated Online process with step-by-step Procedure • Very little preparation work requited • Quick transition from Revit model to gbXML analysis(Revit Plug-in) • Automated gbXML error check • Large output to time spent ration • Simple user interface • Provides LEED daylighting analysis Cons • • • • • • •

Trouble with Large Files Unable to Specify analysis type(s) One predetermined broad analysis Limited analysis types Difficulty linking gbXML data to online database Requires internet connection Requires login/password to link files and access analysis results.


BIM Deliverables

CDE EIR

Federated Model

Structural

MEP

3D Model Validation Arch


COLLABORATION BIM 360 Document Management - Data sharing –Discuss Issue – Raise RFI – Callouts – Meetings Scheduling Microsoft Teams Weekly Meetings – Files Sharing – Information Display WhatsApp's Communication – Assigning Responsibilities – Basic Discussions - Availability Outlook Sharing files – Requesting Information -

Collaboration


Review Workflow Design Issue Initiator

BIM Coordinator Project manager Issue

Final Issue

Initial Review 1

Approve

BIM Manager

Initiator

Initiator

BIM Coordinator

Final Review

Reject Initial Review 2

Project Manager

Reject

Final Review

Project Manager

BIM Coordinator

Cost Manager Final Review

Approve

BIM Manager


Recap Paper Pen

Revit Rendering

Design

Visualisation

Revit

Solar Analysis Energy Analysis GBS

Insights Analysis

Navis Work Clash Detection

One Drive

BIM 360

Given Captured Data

C O L L A B O R A T I O N

Managing Data

What's App Outlook Black Board

Teams


Cost Team – Responsibilities 01

Enabling Works • Enabling works • Demolition

Exporting Data

02 03 04

• REVIT • Split quantities into areas • Put costs against quantities

Construction Costs • Calculate a final construction cost • Monitor costs throughout the project with design changes

Life Cycle Cost • Costs throughout the construction phase • Also includes any Operations & Maintenance following the construction phase


Exporting Data BIM Modelling Design created in Revit

Quantity Take - Off

Following Data Export

Quantities of each element were taken off using the schedule function in Revit

Once the areas were known, a rate can be applied to the quantities to show total cost

Content Here

Example of exporting the floor area quantities from Revit

Real Estate


Costing Exporting Data

Spons gives examples of rates used in previous projects that can be applied to the cost plan

Formal Cost Plan 1 • Cost plan produced based on metreage rates from similar projects and the GIFA of the support hub

Formal Cost Plan 2 • A second cost plan is produced using the detail of the design and measuring each element of the building to produce a more accurate cost plan


Material Costs • ASHCRETE

Ashcrete is being used in our project to replace cement. As discussed earlier, it is more environmentally friendly but this is not the only advantage. It is also more cost efficient to make as it is a byproduct of coal combustion, therefore cheaper than traditional cement or concrete.

• CONCRETE WALL LINING

The concrete wall lining system provides a cost saving to the project, as these panels can be pre-fabricated off site. As well as being cheaper to manufacture off-site, this also reduces the programme time, reducing costs further.


Traditional v BIM Traditional

BIM

• QS is able to gain a better understanding due to a more hands on approach • Familiar process

• • • •

• Items may be missed from pricing • Re-pricing amendments is time consuming • More labour intensive

• Training to use BIM, especially for smaller companies that may not have used it before • Initial difficulty with setting up the new technology

Consistency of information Life cycle costing is a possibility Time efficient Take off's can easily be altered as the design changes meaning less time consuming for the QS


Cost Team Challenges • 8 weeks gave us little time to learn the new processes. For example, before any costing could be done, the take-off process through REVIT had to be learnt. • If the design was changed multiple times it was difficult to keep up with costing the amount of design changes. • In conclusion, I don't believe BIM's advantages currently outweigh the disadvantages, but they may in the future.

• Only the minority of companies would be familiar with BIM at this moment in time and we are still at the very beginning of the transitional phase from traditional working into BIM.


Risk Assessment BIM (building information modelling) technology has a lot of promise to become a standard in the construction sector. However, the process of introducing new technology is fraught with difficulties, and the performance of new technology might be harmed when unknown risk factors are present. BIM users can execute early reactions to potential hazards if they have a thorough awareness of the risk elements, increasing the likelihood that BIM will be deployed successfully as discussed by Kuo-Feng Chien et al, (2014).


Challenges The following are the challenges the Project Management Team encounter doing the BIM project ▪ ▪ ▪ ▪ ▪ ▪

Clash of Responsibilities Lack of communication Inadequate skills of Team members Unrealistic deadline Lack of clear scope of work among the BIM team members Lack of Proper Budgeting

Solutions Ways the Project Management Team was able to solve the problems are. ▪ Frequently monitoring of deadline by the Project Managers ▪ Regular Project Coordination meetings ▪ Proper budgeting procedure and making realistic assumption to avoid cost over run

- R I S K MANAGEMENT


Thank you Question And Answer Session