CAPABILITY STATEMENT
1
Abergeldie is a locally owned civil engineering contractor with over 28 years’ experience, delivering projects in the infrastructure, rail, and transport, utilities and energy sectors across Australia and New Zealand.
Abergeldie designs and constructs complex projects including dams, roads and bridges, water and wastewater, rail, shafts and tunnel infrastructure, electrical substations, marine works, and pipeline rehabilitation.
Since beginning in 1994, Abergeldie has achieved steady growth and with more recent strategic acquisitions, Abergeldie has progressively increased the scale and range of its project expertise and capacity. Award-winning quality in project delivery has earned Abergeldie recognition as a leading infrastructure provider.
Complex infrastructure projects that build better communities
Design and construction of potable and wastewater treatment, storage and distribution infrastructure; caisson, seawall, wharf and marine works. End-to-end rehabilitation and replacement services across water, wastewater, and stormwater utility assets.
Design and construction of bridges and roads ranging in size from cycleways and pedestrian overpasses through to multilane highways and rail corridor bridge crossings.
Construction, reconditioning and maintenance of rail track, bridges, stations, buildings and civil structures, provision of geotechnical works and traction power supply, with major shutdown capability.
Large scale energy and green hydrogen storage solutions as well as design and construction of traction power substations, zone substations, buried and overhead cables, cable tunnels and conduits.
Owners and operators of the world’s largest blind bore drilling rigs, a large road header and both AVN and EPBM tunnel boring and jacking rigs.
Condition assessment and remediation of hydrostatic concrete, pipelines, tanks and reservoirs; concrete and brick work; and metal structures and cladding.
Construction and remediation of dams, weirs, jetties, and boardwalks.
3
TR ANSPORT ENERGY WATER UNDERGROUND BRIDGES REMEDIATION TR ANSPORT ENERGY WATER UNDERGROUND BRIDGES REMEDIATION TR ANSPORT ENERGY WATER UNDERGROUN BRIDGES TR ANSPORT ENERGY WATER UNDERGROUND BRIDGES REMEDIATION TR ANSPORT ENERGY WATER UNDERGROUND BRIDGES REMEDIAT TR ANSPORT ENERGY TER UNDERGROUND BRIDGES REMEDIATION TR ANSPORT ENERGY UNDERGROUND BRIDGES REMEDIATION TR ANSPORT ENERGY UNDERGROUND BRIDGES REMEDIATION TR ANSPORT ENERGY UNDERGROUND BRIDGES REMEDIATION ANSPORT ENERGY UNDERGROUND REMEDIATION ANSPORT ENERGY UNDERGROUND REMEDIATION ANSPORT ENERGY UNDERGROUND REMEDIATION ENERGY UNDERGROUND REMEDIATION ENERGY UNDERGROUND REMEDIATION ENERGY UNDERGROUND REMEDIATION RGROUND REMEDIATION ROUND REMEDIATION ROUND REMEDIATION BRIDGES AND ROADS WATER TRANSPORT ENERGY UNDERGROUND REMEDIATION MARINE
OUR APROACH
Collaboration
At Abergeldie we believe a collaborative approach ensures the best possible outcomes for our clients and the communities they serve. Our team is open and honest and strives to excel with innovative ideas to help solve complex challenges.
Safety
We have an unwavering dedication to safety. Our sophisticated, integrated safety, environmental and quality management systems are third party certified to international standards, with accreditation by the Office of the Federal Safety Commissioner.
Delivery reliability
Our teams are committed to ensuring we deliver projects on time and within budget for our clients.
Accessible leadership
The Executive Team at Abergeldie are accessible and intimately involved in project delivery and client relationships.
Innovation
Abergeldie applies the professional engineering and management standards of a major contractor but with a collaborative, approachable and flexible culture that adapts to unique project requirements.
Self-perform capabilities
Abergeldie is a diverse engineering contractor with self-perform capability that allows us to control the schedule and manage costs effectively, ensuring we deliver on-time and within budget.
Building better communities
Our mission to build better communities extends beyond delivering complex infrastructure, it’s deeply embedded in our culture and values. Through our community partnerships, we give back to the communities where we live and work.
Sustainability
Abergeldie is committed to environmental sustainability and strives to be carbon neutral by 2035. Abergeldie has been a member of the Business Council for Sustainable Development Australia since 2012.
4
$
OUR MISSION TO BUILD BETTER COMMUNITIES
Diversity and Inclusion
Abergeldie embraces diversity and is committed to providing an inclusive workplace and culture that provides support for indigenous education and employment, broad based equal opportunity programs, multicultural awareness and representation, and a focus on women in management. Abergeldie believes everyone is entitled to work in an environment where they are treated with dignity, courtesy and respect.
Modern Slavery
Abergeldie is committed to continual improvement and working with our supply chain to ensure that our processes remain effective in identifying, preventing and/or mitigating modern slavery. Our strategy is underpinned by our CSR framework and the values of ensuring ethical standards, legal compliance and meeting international standards to produce an overall positive impact on society.
Reconciliation
Abergeldie’s commitment to reconciliation is deeply embedded in our mission to build better communities. Abergeldie has developed our REFLECT Reconciliation Action Plan (RAP) which was formally endorsed by Reconciliation Australia in February 2021.
RAP Artwork by Wiradjuri Artist Scott ‘Sauce’ Towney
INFRASTRUCTURE
Abergeldie designs and constructs complex infrastructure projects for a range of clients including local governments and transport infrastructure owners.
Fowlers Road to Fairwater Drive Link
Abergeldie was engaged by Wollongong City Council to deliver the Fowlers Road to Fairwater Drive link which included the relocation of overhead 33kV and 11kV aerial feeder cabling and poles within the rail corridor. This allowed for an extension of Fowlers Road to Fairwater Drive and a new intersection with the Princes Highway. Contracts were awarded to Abergeldie in a series of stages, with works delivered as a coordinated program.
To deliver this highly complex project, the team worked with various time restrictions to ensure minimal disturbance to the local community. Works within the live rail corridor were carried out while normal rail traffic continued. Working near schools meant a restriction on material haulage via the school during school zone hours.
Camp Street Bridge Replacement
Abergeldie was selected by Roads and Maritime Services (now Transport for NSW) to replace the Camp Street bridge over Lake Forbes. The Camp Street Bridge Replacement project delivered a newer, safer main access road to Forbes town centre for residents and visitors to the region. This project, included demolition of the existing 60m long, 2-lane concrete bridge over Lake Forbess and construction of the replacement 70m bridge with two 5m travel lanes, a 4m wide shared path on one side and 2m wide footway on the other.
6
Delivering complex infrastructure to improve and connect communities
Parramatta Escarpment Boardwalk
Abergeldie recently completed the award-winning Parramatta Escarpment Boardwalk, a river-level shared path for City of Parramatta council. Located opposite of the Parramatta River Wharf, the 3m-wide boardwalk provides a much-needed link to Parramatta Valley Cycleway, connecting Parramatta Park to Melrose Park through completely offroad facilities.
The boardwalk is stage one of the transformation of Parramatta Quay and caters to the nearly 2 million pedestrians and cyclists that enjoy the foreshore every day.
Hope Island Bridges Rehabilitation
Abergeldie has been engaged by the Department of Main Roads in Queensland to undertake works to provide pile structural easements to prevent further deterioration of piles and functionality of the Coombabah Creek Bridge and Flood Relief Channel Bridge on Oxley Drive.
7
RAIL
Abergeldie is highly-experienced in delivering multidisciplinary rail projects. This includes works within the rail corridor and associated rail infrastructure works including rail bridges, substations and new station infrastructure including car parks, amenities, lift wells, passenger lifts and more.
Watermark – ARTC Hunter Valley Track Reconditioning Package
The Watermark Track Reconditioning Project is part of a multi-year package of works that Abergeldie is delivering for the Australian Rail Track Corporation across multiple sites throughout the Hunter Valley. The Watermark Track Reconditioning scope comprises of 1255 metres of formation renewal to be completed in multiple closedowns.
Abergeldie recently completed the Stage 3 of the works during the Hunter Valley May major closedown. Stage 3 included a 390m of track reconditioning, civil and works and wingwall replacement.
The works have been delivered ahead of program and to the high standards of the ARTC track formation Hunter Valley design requirements.
Broadmeadow Station Upgrade
As part of the Transport for NSW’s Transport Access Program, this design and construct project was completed to improve disabled access and upgrade amenities on railway station platforms. The scope included, construction of three lift wells; installation of three passenger lifts; new electrical substation; electrical conduit connections beneath rail corridor; upgrades to stairs, ramps and subways; signage; lighting; and new rain shelters and amenities on all four platforms.
8
TRACK WORKS
Successful planning and delivery for rail
Digital Systems ProgramHomebush and Sydenham Control Centre Works
Transport for NSW has selected Abergeldie to replace the existing signalling and train control systems at Homebush and Sydenham with modern, internationally recognised technology that will allow more frequent and reliable services for Sydney train commuters as part of its Digital Systems Program.
The works include the construction of server rooms to house the Traffic Management Systems (TMS), Digital Train Radio System (DTRS) and Trackside Deployment Areas 1A and 1B servers including upgrades to air conditioning, HVAC, fire rating and potential power supply upgrade. The construction works will provide new and modified internal walls, workstation area and racks and equipment which will be completed by TMS and Trackside suppliers once handover is provided to Transport for NSW.
NIF AC Feeder Stage 2 Upgrade Project
Transport for NSW has selected Abergeldie to deliver the AC Feeder Stage 2 Project to meet expected power requirements for Sydney’s future rail network and new fleet of airconditioned trains.
The works involve upgrades to the existing 33kV Feeder between Yagoona Substation and Revesby Substation, upgrades to the existing 33kV Feeder between Yagoona Substation and Sefton Substation and upgrading the existing 33kV cable between Revesby Substation and Ausgrids pole Pe24544 to 531A.
9
ABERGELDIE COMPLEX INFRASTRUCTURE
WATER AND WASTEWATER
Abergeldie delivers water and wastewater asset reliability and renewal projects, dam safety upgrades and capital infrastructure projects in regional and metropolitan areas. Abergeldie offers extensive experience and approaches project delivery collaboratively to achieve the best outcomes.
Sydney Water WRDT
The West Region Delivery Team (WRDT) was established with Sydney Water under a collaborative contracting framework - Partnering for Success (P4S). The West Region Delivery Team consortium comprises of Abergeldie Complex Infrastructure and Fulton Hogan for construction, Programmed for maintenance and facility management, Stantec and Atlas for design and engineering.
The West Region Delivery Team have been engaged to deliver design, construction, maintenance and facility management services for the next 10 years across Sydney Water’s wastewater, water and recycled water systems.
WRDT’s program of work looks after Sydney Water’s assets across the Greater Western Sydney region which extends from Sydney’s Inner West suburbs out to the Blue Mountains, down to Bargo in the South-West and includes the Western Sydney Growth Area and part of the North West Growth Centre.
Safety Focused Performance in Melbourne
The Melbourne Water Major Capital Delivery Program for design, construction and rehabilitation services commenced in June 2018. The program comprises capital works and renewal projects across water and sewerage assets, with a forecast annual capitalspend of approx. $200M over 10 years. The Safety Focused Performance Joint Venture (SFP), a partnership between Abergeldie, Downer, and Stantec, is one of two service providers competing and delivering work packages under the program.
10
TRACK WORKS
Trusted by utility providers for water and wastewater projects
Cessnock Waste Water Treatment Works Upgrade
Abergeldie has been engaged to design and construct Cessnock Wastewater Treatment Works Upgrade for Hunter Water Corporation. These upgrade works will update treatment processes and improve the quality of treated wastewater, ensuring the plant can meet the new limits set by the Envvironmental Protection Authority (EPA and ensures the plant caters for population growth.
Grahamstown Water Treatment Plant
The Grahamstown Water Treatment Plant treats raw water to produce quality suitable to safely drink. Part of the Hunter Water Growth Plan, Abergeldie was engaged by Hunter Water to upgrade the sediment tank. Delivered under brownfield conditions, Abergeldie ensured that the tank was available for the duration of the works for the benefit of the many people it services.
11
Trusted by utility providers for water and wastewater projects
Networks Facility Renewal Program
Abergeldie was engaged under a collaborative framework agreement with Sydney Water to provide renewal, refurbishment, enhancement, replacement, and upgrade works on water assets across multiple project sites. Projects included upgrading sewerage reticulation, wastewater processing facilities, stormwater drainage, and potable water treatment, storage, and distribution systems across the Sydney Water network. Abergeldie delivered over 70 projects, ranging in value from less than $1M to more than $5M.
Asset Renewals and Replacement Program
Abergeldie is a Contruction Partner under a Construction Partner Contract with WaterNSW for multiple work packages (civil, mechanical and electrical) in greater Sydney and regional NSW for a 5 + 3 year term across all bulk water storage and distribution assets.
12
TRACK WORKS
Gold Coast Stormwater Relining Program
Abergeldie has a long-term collaborative relationship with Gold Coast City Council extending over 6 years to deliver the annual Stormwater Relining Program. The scope includes repairing and renewing the city’s stormwater pipe infrastructure using cost-effective methods to extend the service life of the city’s infrastructure assets whilst also improving the city’s flood resilience.
Yarra Valley Water Sewer Mains Renewals Program
Abergeldie have been engaged to complete works within Yarra Valley Waters Sewer Mains and Reticulation Renewals Program. The program will progressively rehabilitate its ageing sewer reticulation mains and branch sewers, improving customer service and reliability of supply. Using various rehabilitation methods, these works involve the investigation, design and construction of the rehabilitation of sewers ranging in diameter from 100mm to 900mm. Within this program, works also involve the rehabilitation of property connection sewers and civil spot repairs.
13
Capability and extensive experience for network rehabilitation
ABERGELDIE COMPLEX INFRASTRUCTURE
Abergeldie provides clients with end-to-end rehabilitation and replacement services across water, wastewater, and stormwater utility assets. The broad range of solutions we offer, covering pipes, pits, pumps and customer service lines, enables us to confidently investigate and recommend the optimal solution for each situation.
NEW ZEALAND
Abergeldie is a highly experienced civil contractor in New Zealand. Tracing our beginning back to Harker Underground, then Abergeldie Harker and now Abergeldie, we deliver complex infrastructure projects ranging from bridges, roads, rail, water and wastewater, pipeline rehabilitation and tunnelling.
Central Interceptor Project
Abergeldie is collaborating with joint venture partner Ghella to deliver Watercare’s Central Interceptor Project. This project will provide additional wastewater capacity to serve Auckland’s growing population while reducing the frequency and volume of wastewater overflows, preserving the area’s beaches, estuaries, and waterways. The Central Interceptor Project involves construction of a 14.7km long, 4.5m diameter underground tunnel from Grey Lynn to Māngere Wastewater Treatment Plant, for collecting and transferring wastewater. Once completed, the tunnel will be one of the longest in New Zealand.
14
Over 30 years of local experience
Northern Corridor Improvements
The Northern Corridor Improvements (NCI) project was a major road and infrastructure project connecting the North Shore to the Western Ring Route that directly impacted the Rosedale Wastewater Treatment Plant.
As part of this highly complex project Abergeldie were engaged by the NCI Alliance to connect two existing wastewater treatment ponds and diverted the existing trunk main through a new route to enable the existing pipe bridge to be demolished prior to constructing the onramp for the new motorway. The team completed multiple motorway crossings using specialist tunnelling machines and installed a new trunk main via open trench excavation. A specialist methodology was developed to allow for live flows throughout the process.
Clinker Place Stormwater Pipeline
Abergeldie is delivering the Clinker Place Stormwater Pipleline to significantly improve the stormwater network in the area, future-proofing it for new development projects. The project involves installation of a new stormwater pipe running underground for approximately 550m from the Clinker Place development site to a new outfall in Manawa Wetland Reserve.
15
TUNNELS AND SHAFTS
Abergeldie is a leading tunnelling and shafts contractor with specialist experience in trenchless technology and world-leading blind boring capabilities with a fleet of Tunnel Boring Machines (TBMs) that cater for any ground condition.
Bulimba Sewer Trunk Main, Brisbane
Abergeldie, in joint venture with Obayashi delivered the Bulimba Sewer Trunk Main project for Urban Utilities. This significant upgrade to the network improved sewerage infrastructure for a growing number of residents and businesses across Brisbane. The project, which included gravity trunk sewer installation using trenchless technology, was a finalist in the CCF QLD Earth Awards.
The contract was varied at the client’s request to include the pipe-jacked construction of a new Fortrose Street rising main and Jindalee water main replacement, which went on to win the IPEAQ Innovation in Water Award in 2019.
Mandalong Vent Shaft
Abergeldie was engaged to design and construct one vertical, hydrostatically lined, blind bored ventilation shaft to serve underground mine works at Centennial Coal’s Mandalong operations near Lake Macquarie on the Central Cost of NSW. Works for the 5.5m diameter, 360, deep shaft were carried out on an active mine site, requiring strict obervance of mine safety and environmental protection procedures, and close cooperation with the mines operations management team.
Shaft sinking was carried out using Abergeldie’s owned, operated and maintained blind boring rigs, which are the world’s largest of their type.
16
ENERGY STORAGE
Hydraulic Storage (>100MW - 200MWhrs)
Utilising our expertise in blind bored shafts, a large piston and cylinder is constructed underground. From its charged position, potential energy of the piston at the top of the shaft forces water through a turbine which is connected to a generator supporting the electrical network. The system can be tailored for specific needs and adapted for fast discharge over varying durations.
Pumped Hydro (>100MW/>1GWhrs)
Our largest energy storage system, providing hundreds of megawatts over many hours to days. This system uses the potential energy stored in a large reservoir at an elevated position. When energy is required water is released from the elevated storage via a turbine that produces electrical energy. When energy is plentiful, the process is reversed and water is returned to the upper storage ready for the next cycle.
Gravity Storage (>100MW - 100MWhrs)
Designed to provide short term support and can deliver maximum power in a short time. A heavy mass is suspended in an enclosed shaft storing potential energy. When energy is needed to firm and stabilise electrical networks, the mass is allowed to drop converting the potential energy of the suspended mass via a generator and delivering synchronised electrical energy to a network.
17
Abergeldie applies its extensive experience and unique capabilities to deliver large scale energy storage systems that enable the transition to 100% dependable renewable energy. There are three types of energy storage solutions we offer.
Abergeldie and ITP Thermal established Ardent Underground to provide high purity, economical and safe underground hydrogen storage, the missing link to a green hydrogen future. Our blind bore drilling method offers a replicable, small footprint solution which can store up to 500 tonnes per shaft.
18
Drill Rig
Safe Storage
Hydrogen is stored in an environment absent of oxygen and any potential ignition source and risk of impact to the tank
Affordable
The surrounding rock takes on the duty of containing the hydrogen pressure – no need for costly pressure containment materials
Replicable
The shaft storage construction process can be reproduced in different locations with minimal design adjustment
Pure Hydrogen Storage
Storing compressed hydrogen deep underground, without affecting hydrogen purity
Large Scale
Hydrogen storage sizes of up to 500 tonnes per shaft. For larger storage, multiple shafts can be built in the same location
Small Footprint
The above ground footprint is very small compared to equivalent pressure vessel storage
19
Shaft drilling
Liner assembly
Cap installation Service connection