RAIL
Abergeldie is highly-experienced in delivering multidisciplinary rail projects. This includes works within the rail corridor and associated rail infrastructure works including rail bridges, substations and new station infrastructure including car parks, amenities, lift wells, passenger lifts and more.
Watermark – ARTC Hunter Valley Track Reconditioning Package
Advertisement
The Watermark Track Reconditioning Project is part of a multi-year package of works that Abergeldie is delivering for the Australian Rail Track Corporation across multiple sites throughout the Hunter Valley. The Watermark Track Reconditioning scope comprises of 1255 metres of formation renewal to be completed in multiple closedowns.
Abergeldie recently completed the Stage 3 of the works during the Hunter Valley May major closedown. Stage 3 included a 390m of track reconditioning, civil and works and wingwall replacement.
The works have been delivered ahead of program and to the high standards of the ARTC track formation Hunter Valley design requirements.
Broadmeadow Station Upgrade
As part of the Transport for NSW’s Transport Access Program, this design and construct project was completed to improve disabled access and upgrade amenities on railway station platforms. The scope included, construction of three lift wells; installation of three passenger lifts; new electrical substation; electrical conduit connections beneath rail corridor; upgrades to stairs, ramps and subways; signage; lighting; and new rain shelters and amenities on all four platforms.