NORTHERN CALIFORNIA
SCIENCE & TECHNOLOGY
ABOUT
TURNER FIRM OVERVIEW
Turner is a North America-based, international construction services company and is a leading builder in diverse market segments. The company has earned recognition for undertaking large and complex projects, fostering innovation, embracing emerging technologies, and making a difference for their clients, employees and community. With a staff of over 10,000 employees, the company completes $15 billion of construction on 1,500 projects each year. Turner offers clients the accessibility and support of a local firm with the stability and resources of a multi-national organization. A LEGACY BUILT ON TRUST
Henry Turner founded Turner Construction Company in 1902 based on the core values of teamwork, integrity and commitment. Our work has resulted in the transformation of skylines, communities, and the construction industry. Turner first made its mark on the industry by pioneering the use of steel-reinforced concrete for general building, which allowed our company to deliver safer, stronger, and more efficient buildings to our clients. Today, our reach is global, and our people uphold Henry Turner’s vision to provide valuable services to clients and build partnerships in the community. “A promise made is a promise delivered,” rings as true today as it did in 1902. OUR CULTURE
Throughout Turner’s history, we set ambitious goals and made formal commitments to enhance safety, care for others, increase diversity and impact in the community, uphold high standards for business integrity, and build ever more sustainable and resilient buildings. We are now connecting these and other efforts in an Environmental, Social and Governance (ESG) strategy to enhance and strengthen our company and the industry. This is an authentic extension of our culture and includes how we actively care for people, how we build sustainability, and how we conduct business with transparency and accountability.
Making a difference in the lives of our people, customers, and community.
SCIENCE & TECHNOLOGY
EXPERIENCE
Top 4
BAKAR CLIMATENGINUITY HUB
HISTOPATHOLOGY EXPANSION
CONFIDENTIAL DATA & OPERATIONS CENTER
KITE PHARMA RENOVATION
PG&E CRITICAL OPERATIONS CAMPUS
ILLUMINA PROJECT FREEDOM
OXFORD PROPERTIES FOUNDRY 31
JOHNSON & JOHNSON PROJECT LAGUNA
CONFIDENTIAL BATTERY RECYCLING PLANT
JOHNSON & JOHNSON PROJECT TESLA
Berkeley ClimatEnginuity Hub | 05.13.24 Rev. 1
Data Center Builder in US by Engineering News-Record, 2025
2.6+ GW Megawatts Completed Past 5 Years Since 2021, we have put over 2.6 gigawatts in place on data center work globally.
115+ Active Data Center Projects In 2026, we have over 115 active data center projects globally.
$8.4B Work in Place in 2025 We managed $8.4B in data center projects last year.
2,500 Data Center Builders We have over 2,500 dedicated data center builders on active data center projects globally.
EPT DESIGN: POWERHAUS
val onADDISON AddisonLABS Street
BAKAR LAB FOR ENERGY AND MATERIALS Berkeley, California
THE PREMIER LOCATION TO SUPPORT
Bakar ClimatEnginuity Hub (BCH) will create a state-of-the-art climate tech focused incubator to support innovative, entrepreneurial, new companies that are pursuing discoveries to fight climate change. project of a new, five-story ground-up facility of approximately 132,000 sf ey ClimatEnginuity HubThe | 05.13.24 Rev.consists 1 that features lab space, 3D printing studios, conference rooms and office space. It is designed with a flexible, adaptable, and technologically future-proofed approach to accommodate unknown future focuses of climate tech. BCH features thoughtful, sustainable, design solutions which are integrated across façade, MEP systems, lighting and daylight, and materials. Occupant well-being is critically important to foster a sense of place which inspires success.
Entering on Addison Street, tenants and visitors walk into a sun-filled lobby open to the lower level with a sculptural stair connecting to the PowerHaus above.
FIND OUT MORE ABOUT THE PROJECT
PROJECT WIN PRESS RELEASE
PROJECT FEATURES
PROJECT SPECS
Clean Rooms Incubator Facility Lab Space Urban Site Sustainable Features
132,000 SF $Confidential Volume CM at Risk Gensler Architects
CONFIDENTIAL CLIENT
NEW CHESS FACILITY Foster City, California
THE PREMIER LOCATION TO SUPPORT
The New Chess Facility is a 220,000 sf, two-story cGMP manufacturing facility located in Foster City, designed for a confidential life science client. Purpose-built to support the clinical production of monoclonal antibody (mAb) drug substance for Phase 1, 2, and 3 clinical trials, the facility features a 1x2K Single-Use Bioreactor train, along with supporting infrastructure including Quality Control (QC) laboratories, cell banking suites, warehouse space, administrative offices, and utilities support areas. The site includes an outdoor utilities yard equipped with a dedicated PG&E electrical service, medium voltage switchgear, and five gensets for critical systems redundancy. The facility is designed with modularity and future scalability in mind, including provisions for the addition of a
PROJECT FEATURES
PROJECT SPECS
Drug Substance Facility Raw Materials Consumables Storage Lab Space
220,000 SF $320M Design-Assist Jacobs, DGA & Salas O’Brien
BAKAR LABS
INNOVATIVE GENOMICS INSTITUTE BAKAR Berkeley, California
THE PREMIER LOCATION TO SUPPORT
The Innovative Genomics Institute building is a cutting-edge life sciences research and innovation hub located adjacent to the UC Berkeley campus. Spanning approximately 165,000 sf over sevenstories and a partial basement, the facility is designed to support the intersection of academic research and biotechnology commercialization. The project features advanced lab and office spaces for both the world renowned Innovative Genomics Institute (IGI) and an expansion of the biotech incubator, Bakar Labs, with a focus on sustainability, seismic resilience, and future-ready infrastructure to foster next-generation scientific breakthroughs.
R LABS
PROJECT FEATURES
PROJECT SPECS
High-Rise Multi-Tenant Facility High-Performance Structural Design Rooftop Terrance Amenity Space
165,000 SF $280M CM at Risk Weiss Manfredi & DGA
EXACT SCIENCES
HISTOPATHOLOGY EXPANSION Redwood City, California
This demolition and expansion of 11,500 sf laboratory and office space helps support Exact Science’s mission of creating tests that support the early detection of cancer. Features include walk-in cold rooms, safe-off, and lab equipment storage. The expansion included four new histopathology labs that expanded testing capacity, 13 offices, a conference room, reinstallation of lab equipment, and a new water purification (RO/DI) system to service equipment and lab sinks. This high-purity water system was customized to meet specific user requirements and included the following: pretreatment assembly, reverse osmosis unit, make-up deionization, storage tank assembly, and distribution assembly. Turner oversaw the testing and validation of this equipment.
PROJECT FEATURES
PROJECT SPECS
Clean Rooms Lab Space Office Space Conference Space
9,000 SF $4.7 Million Design-Build Folio Architects
ILLUMINA
PROJECT FREEDOM Foster City, California
Illumina’s cutting-edge campus in Foster City, California unites employees from various isolated locations across the Bay Area into one collaborative environment. The 360,000 sf interior build-out at the Lincoln Center consisted of two four-story laboratory and office facilities and a two-story amenity building with a gym and recreational area. The project features specialized lab areas, including darkrooms, tissue culture, and other clean rooms, as well as “accelerator” Space for young startups, including desking and access to the adjacent laboratories. The LEED Gold project included the installation of a detached Central Utility plant to house chillers, boilers, pumps, and lab neutralization for the three-building campus, new elevators for lab material conveyance, a centralized DI water system and a Hazardous Material Monitoring System, leak detection, and PH Monitoring System.
PROJECT FEATURES
PROJECT SPECS
Campus Lab Space Fast-Paced Schedule Tenant Amenity Space LEED Gold Certified Central Utility Plant (CUP)
360,000 SF $126 Million CM at Risk Perkins + Will Architects
JOHNSON & JOHNSON
PROJECT TESLA Fremont, California
The renovation of this 36,000 sf Johnson & Johnson building encompasses a modernized lobby, versatile office spaces surrounding a state-of-the-art 9,000 sf clean manufacturing device lab, well-appointed conference rooms, a stylish café, and a fully-equipped fitness center. SourceBlue facilitated the acquisition of new MEP equipment, including Air Handling Units, Boilers, Chillers, Compressed Dry Air Skid, and Service utility panels, essential for the seamless operation of the new manufacturing lab. Structural enhancements to the facility involved the installation of new foundations and grade beams to provide robust support for the innovative steel rooftop AHU platform. Throughout the project, careful attention was paid to ensure minimal disruption to the adjoining operational office suite.
PROJECT FEATURES
PROJECT SPECS
Lab Space Clean Room Space Occupied Space
36,000 SF $14.7 Million Design-Bid-Build CRB Architects
CONFIDENTIAL PHARMACEUTICAL CLIENT
PROJECT YOSEMITE Hayward, California
This interior space renovation of two existing tilt-up concrete structures expanded existing GMP facilities to enhance manufacturing capabilities for pharmaceutical clientele. Building One included the conversion of a warehouse into a new quality control laboratory space and expansion of existing private offices. Building Two building included buildout of a new clean room manufacturing laboratory. These new manufacturing spaces added air handling units supporting an airborne particle filtration system to achieve a Class C or ISO 7 clean room classification. The lab space buildout included process piping and instrumentation scope such as new compressed air lines, steam generator/condensate return system, and a new WFI pump, storage tank, and distribution system for sterilized water used in pharmaceutical manufacturing.
PROJECT FEATURES
PROJECT SPECS
Lab Space Clean Room Space Occupied Space IOS 7
8,600 SF $12.5 Million Design-Bid-Build Bruns & McDonnell Architects
OXFORD PROPERTIES
FOUNDRY31 Berkeley, California
The Foundry31 project transformed a pre-existing commercial establishment into a life science facility, responding to the escalating demand for laboratory spaces in the East Bay Area. The project included new dedicated lab mechanical systems, lab elevators, and common spaces, including selective demolition of the 3-story building, which was initially constructed in 1950. The project provided the necessary infrastructure to allow occupancy of up to four early-stage life science startups, two of which were fully build-out as part of the project. The building is currently the home of Arcadia Science and Glyphic Biosciences.
PROJECT FEATURES
PROJECT SPECS
Lab Space Occupied Space SourceBlue Integration Office Space Incubator Facility
39,955 SF $13 Million Design-Bid-Build DES Architects + Engineers
CONFIDENTIAL CLIENT
PROJECT TIGER Sunnyvale, California
This groundbreaking project for a light manufacturing operation based on imprint technology includes the reconfigurations of 35,000 sf of existing solar R&D facility and the extension of the existing utility pad and structural platform. The project scope includes construction of the following: work centers for lithography, etch, and deposition, and wet processing including 17,000 sf of Class 10 cleanrooms; a cleanroom gowning, PCMIC clean area, electrical room, shell space, and other areas (e.g., corridors, ancillary non process areas); a utility plant serving the manufacturing facility. Turner is piloting the 23-ton EC230 Electric excavator from Volvo Construction Equipment at this project, which is one of only three all electric excavators in the country.
TURNER IS A GREAT PARTNER TO TEST THE CAPABILITIES AND BENEFITS OF A ZERO-EMISSION MACHINE.... BOTH OF OUR COMPANIES ARE INDUSTRY LEADERS PUSHING INNOVATION TO BUILD A CLEANER WORLD. Scott Young, Acting President of Region North America, - Volvo CE
PROJECT FEATURES
PROJECT SPECS
Lab Space Clean Rooms Office Space
95,000 SF $212 Million CM at Risk RMW Architects
CARL ZEISS MEDITEC INC.
ZEISS INNOVATION CENTER Dublin, California
The Zeiss Innovation Center is a 3-story, 208,650 sf building that caters to a variety of specialty services. The site development includes approximately 700 surface parking spaces, a plaza, internal walkways and roadways and other landscape features. The project program includes office space, amenities, a canteen, kitchen and cafeteria, as well as a variety of specialty spaces, including an engineering lab, clean spaces, production space, R&D facilities, light manufacturing, a warehouse, showroom, and other supporting facilities. Additionally, Turner installed an elaborate smoke control system.
THE CENTER LOOKS AWESOME; EVERYONE LOVES IT! THIS INCREDIBLE ACCOMPLISHMENT IS A TESTAMENT TO YOUR HARD WORK AND DEDICATION. I HOPE YOU KNOW HOW MUCH IT MEANS TO US THAT YOU’VE BUILT THIS GREAT NEW HOME FOR ZEISS.
Dr. Matthias Ismael, Real Estate Management Americas - Carl Zeiss Meditec Inc.
PROJECT FEATURES
PROJECT SPECS
Lab Space Office Space Parking Tenant Amenity Space Community Impact
208,650 SF $135 Million CM at Risk Gensler Architects
IQHQ
RESEARCH & DEVELOPMENT DISTRICT (RADD) San Diego, California
Situated on more than 10 acres and occupying six blocks, RaDD represents the largest urban commercial waterfront site along California’s Pacific coast. The project will transform downtown San Diego with an iconic life science district featuring high-rise laboratories, complex mechanical equipment, best in-class retail, outdoor dining, open green space, public art, event space, and access to transit. Sustainability features include +1 MW maximum solar generation, 200+ DV enabled parking spaces, 100% carbon neutral base building design, electro-chromic glass, and 60,000+ SF of expansive outdoor decks. As a minimum, the project is targeting LEED Gold certification.
PROJECT FEATURES
PROJECT SPECS
Central Utility Plants Generators SourceBlue High Rise
1.7 Billion SF $2 Billion CM at Risk Gensler Architects
CONFIDENTIAL CLIENT
BATTERY CELL TENANT IMPROVEMENT Northern Nevada
Located in Northern Nevada, this 150,000 sf tenant improvement takes place within an operating confidential gigafactory, and includes the addition of dry room air and water systems in the various utility spaces on the 2nd floor and the exterior utility yard. Turner’s scope includes procurement of long lead equipment to support the increased utility demand, stainless steel process piping & ductwork, extensive MEP system upgrades, architectural enclosure upgrades, epoxy flooring, and tool installation coordination in a cleanroom environment.
PROJECT PHOTOS ARE CONFIDENTIAL. THE PHOTO BELOW IS A SAMPLE PHOTO FROM A SIMILAR PROJECT.
PROJECT FEATURES
PROJECT SPECS
Dry Room Air Operating Gigafactory Battery Cell Production Tool Installation
150,000 SF $Confidential Volume CM at Risk KPFF Architects
CONFIDENTIAL CLIENT
DATA AND OPERATIONS CENTER Lincoln, California
This 35,800 sf, 2-story data and operations facility on a 3.3 acre site in Lincoln, California includes a back-up data and operations center for a confidential client, serving California’s bulk electric power system, transmission lines, and electricity market generated and transmitted by its member utilities. The building consists of a data center, control room and support offices and a complete Emergency Generator backup as well as a backup UPS for critical loads. This is a highly secure facility that operates 24/7 and is held to the NERC (North American Electric Reliability Corporation) standards.
PROJECT FEATURES
PROJECT SPECS
Data Center Control Room Secure Facility 24/7 Operations NERC Standards
35,000 SF $17 Million Design-Build Gensler Architects
CONFIDENTIAL BATTERY RECYCLING PLANT
PROJECT SUTRO Northern Nevada
This multi-phased expansion to a battery recycling plant entails a phased permit with early earthwork and utilities, followed by a core-and-shell structural steel building with concrete slab on grade, insulated metal panel walls, and a single-ply roof. The project was completed with an industrial tool install package for the move-in and installation of the owners’ material-process equipment and chemical containment, including all Process piping and controls for the various systems.
PROJECT FEATURES
PROJECT SPECS
Remote Location Battery Recycling Industrial Tool Install Process Piping
30,000 SF $27 Million CM at Risk SSOE Architects
PACIFIC GAS & ELECTRIC
CRITICAL OPERATIONS CAMPUS Vacaville, California
On an active and occupied campus, this 65,000 sf project consisted of multiple mission critical 24/7 facilities designed to withstand 100 year catastrophic events. The Turner team carried all projects on this campus through programming, entitlements, design and construction targeting LEED Silver Certification. Projects included a Grid Support Center Expansion, Security Operations Center, Grid Control Center, Critical Operations Facility, and a prefabricated warehouse.
PROJECT FEATURES
PROJECT SPECS
Mission Critical 24/7 Facilities Met NERC Requirements Active Campus
15 Acres $65.6 Million Design-Build DGA Architects
SACRAMENTO
2500 Venture Oaks Way, Suite 200 Sacramento, CA 95833 WALNUT CREEK
100 Pringle Ave, Suite 340 Walnut Creek, CA 94596 SAN FRANCISCO
100 Bush Street, Suite 510 San Francisco, CA 94104 SILICON VALLEY
691 S Milpitas Boulevard, Suite 202 Milpitas, CA 95035 RENO 300 E 2nd Street, 15th Floor Reno, NV 89501
LOS ANGELES
515 S. Flower Street, Suite 1050 Los Angeles, CA 90071 ANAHEIM
1900 South State College Boulevard, Suite 150 Anaheim, CA 92806 SAN DIEGO
350 Camino De La Reina, Suite 105 San Diego, CA 92108
@turnerconstructioncompany
turnerconstruction.com