Collaborative BIM Project_IT Application For Sustainable Design

Page 27

02

CASE STUDY

2.3.6 Master Planning - Room Layout & Building Energy Proposal (week 3)

Building Energy Proposal

Room Layout BIHM COLLABORATION

COORDINATION

Landscape Architect : Research and Integration of Sustainable Features into the Design

Design Manager

Landscape Architect

1 Atrium

BIM MANAGER

Design Manager : Discussion among the BAT DESIGN TEAM with the guidance on room dimension and suggestion from BIHM

2 Courtyard COORDINATION Unit type in each floor

l

Deluxe Single room (37-45 m2)

Deluxe Queen / King room (32-50 m2)

Deluxe Twin room (32-40 m2)

Suite (70-100 m2)

(9 x 4.5 m = 40.5 m2) - (2 / 3 rooms)

(9 x 5.5 m = 49.5 m2) - (4 rooms)

COLLABORATION

(9 x 10 m = 90 m2) - (1 / 2 rooms)

ISSUES :

SOLUTIONS :

-Difficulties on visualising the room layout -Difficulties on work distribution as only one man be able to work on the digital model -Waste space created due room dimension give and the room layout arrangement -Difficulties from BQS on conceptualising the building

-Retracting information from BIHM on the survey study carried by them -Allocating the workload to information compiling , modeling , and drawings /sketches -Getting advice from BQS on layout arrangement -Support the draft sketch with to scale digital drawings and concept modelfor better visualisation

Refer to Appendix 4.1 (session 2-3)

(9 x 4.5 m = 40.5 m2) - (4 / 5 rooms)

Maximise Usage of Natural Light

Lower Down Indoor Temperature

Design Manager : Integration with landscape to provide section for better visualisation

BIM Manager

Project Leader : Meeting with Stakeholders to Verify the Design and Progress Catching Up

27


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.