Linkbelt 290LX EXCAVATOR OPERATOR'S MANUAL - PDF DOWNLOAD

Page 106

OPERATING INSTRUCTIONS

MACHINE OPERATION Operating instructions

! ●

TRIM THIS EDGE

WARNING: Follow the operating instructions listed in this chapter. Any other practice which has not received the prior approval of the manufacturer is considered to be strictly forbidden.

Watch carefully and make sure you are aware of places where other people are working in your work area. Keep all other people away from the machine. Serious injury can result if these instructions are not followed. Take note of the locations of pipes/ cables before starting work. Electrical cables, gas and water pipes and other underground installations can cause serious injury.

Never hit or push material with the sides of the bucket.

Never sweep the ground with the bucket to level rubble.

When operating the control levers, a whistling sound will be heard if the control lever is held in position while the corresponding cylinder is at the end of its stroke. In this case release the control lever.

The following operations are likely to damage the machine. You are therefore advised to avoid them.

Modify your travel to suit working conditions (sloping or rough ground), the nature of the ground and weather conditions. On steep slopes keep the engine speed at a maximum and travel in Low. When traveling at right angles to the slope, move on to the slope at low speed. Never reduce engine speed when traveling down slopes. Holes, obstacles, debris and other danger risks in the working area can cause serious injury. Inspect and note all possible risks before driving the machine in a new working area. Do not work close to a live overhead electric cable without first making sure that the following minimum distances are respected :

1. Excavation using the weight of the machine as a force of impact. 2. Excavation using the machine’s travel force. ●

If earth or mud stays stuck inside the bucket, open and close the bucket several times so as to loosen the earth or the mud.

After work, remove any mud and clean the machine.

When using the upper structure swing, never change the direction of swing too suddenly.

When traveling up or down a slope, place the bucket about 250 mm (10 inches) above the ground.

Avoid turning the machine on steep slopes.

Keep all parts of the machine at least 4.6 m (15 feet) away from the power source. 102

TRIM THIS EDGE LEFT PAGE Bur 6-30470


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

AIR CONDITIONING

2min
pages 187-189

BATTERIES

2min
pages 197-198

ENGINE TROUBLESHOOTING

1min
pages 190-191

CONNECTING BOOSTER BATTERIES

1min
page 199

REPLACING A BUCKET

1min
pages 183-184

SHIMMING THE BUCKET

1min
page 185

RADIATOR AND OIL COOLER

1min
page 178

TRAVEL REDUCTION GEARS

1min
pages 170-172

SWING REDUCTION GEAR

1min
pages 168-169

AIR FILTER

2min
pages 164-167

RELEASING PRESSURE IN THE HYDRAULIC SYSTEM

1min
pages 151-152

HYDRAULIC SYSTEM

9min
pages 153-163

COOLING SYSTEM

2min
pages 146-148

FUEL SYSTEM

1min
pages 149-150

ENGINE

2min
pages 143-145

ENGINE OIL

1min
page 135

TRANSPORTING THE MACHINE

2min
pages 123-128

AUXILIARY HYDRAULIC (optional

2min
pages 118-122

PARKING THE MACHINE

1min
page 115

TOWING THE MACHINE

1min
pages 116-117

FILLING THE BUCKET

1min
page 114

MACHINE TRAVEL

2min
pages 108-110

MACHINE OPERATION

2min
pages 106-107

STOPPING THE ENGINE

1min
page 105

OPERATING THE MACHINE IN COLD WEATHER

1min
page 104

STARTING THE ENGINE

1min
pages 100-101

ENGINE OPERATION

1min
page 103

BRINGING THE MACHINE UP TO OPERATING TEMPERATURE

1min
page 102

BREAK-IN PERIOD

1min
page 98

MACHINE OPERATION

2min
pages 96-97

HOSE BURST CHECK VALVES (OPTIONAL

1min
page 91

LIFTING EYE

1min
page 89

TOWING EYES

1min
page 90

WINDSHIELD WASHER RESERVOIR

1min
page 88

TOOL SUPPLY VALVES (OPTIONAL

1min
pages 92-94

ENGINE HOOD

1min
pages 86-87

SIDE DOORS

1min
page 85

FUEL TANK

1min
page 83

ANTI-THEFT SYSTEM

3min
pages 60-62

SYSTEMS DISPLAY AND CONTROL PANEL

9min
pages 52-59

LOWER FRONT WINDOW

1min
page 80

DECALS

3min
pages 27-38

STEPS AND ACCESS HANDLES

2min
pages 44-45

MAINTENANCE AND ADJUSTMENTS

3min
pages 25-26

BEFORE USING THE HYDRAULIC BREAKER (optional

2min
pages 23-24

MAINTENANCE

5min
pages 19-22

MACHINE OPERATION

2min
page 15

PERSONAL SAFETY

1min
page 13

FIRE EXTINGUISHER

1min
page 17

SAFETY RULES

1min
page 11

BEFORE OPERATION

1min
page 14

UTILITY SAFETY

1min
page 12

BURN PREVENTION

2min
page 16

FIRE OR EXPLOSION PREVENTION

1min
page 18
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Linkbelt 290LX EXCAVATOR OPERATOR'S MANUAL - PDF DOWNLOAD by www.heydownloads.com - Issuu