CNH Ride Control Kit (XT-TC) 121F XT 21F XT W50C TC W60C TC Wheel Loader Instructions Manual

Page 7

4 - PRE-ASSEMBLY

4 - PRE-ASSEMBLY PREPARING FOR ASSEMBLY

Preparation 1. Park the machine on a level surface and lower the bucket to the ground. 2. Stop the engine and apply the parking brake. 3. Wait 5 s. Then, turn the ignition key to the ON position. 4. On the joystick, slide the roller switch (forward and backward, at least three times) to discharge the auxiliary line pressure. 5. Press the Quick Coupler switch to the OFF position. The ON light switch should be not illuminated. 6. Move the joystick in both directions (at least 20 times) to discharge the pilot control accumulator pressure. 7. Turn the ignition key to the OFF position. 8. Turn the master disconnect switch to the OFF position. 9. Loosen the hydraulic tank fill cap to relieve any pressure in the hydraulic system. 10. Place a suitable container under the hydraulic tank drain plug. Remove the plug and drain the oil from the hydraulic tank.

7 EN


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.