CNH Joystick Steering Kit with Secondary Electrical 821G W190D Wheel Loader Instructions Manual

Page 24

5 - ASSEMBLY

38. Install the straight connector (5) to the JSS cut-off valve (37). 39. Install the joystick steering tube (46) to the straight connector (5). 40. Install the 90° elbow (48) on the DR port of the JSS cut-off valve (37). 41. Install the tee (11) to the cooling frame (R). 42. Install the return brake to tank hydraulic hose (V) to the tee (11). 43. Install the cut-off valve to tank hydraulic hose (49) to the 90° elbow (48) and to the tee (11). 44. Install the plugs (47) to the JSS cut-off valve (37).

LEIL19WHL0751GB

13

24 EN


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.