
1 minute read
Install the tank hydraulic hose (18) the ° elbow
from CNH Joystick Steering Kit with Secondary Electrical 821G W190D Wheel Loader Instructions Manual
Install the steering EHPS valve (2) the JSS valve bracket (3) . Secure with the three bolts M8x20 (10) and the three washers 9x21x2.5 (9) . Install the valve JSS valve bracket (3) the left - hand sidewall the rear chassis frame. Secure with the three bolts M12x50 (16) , the six washers 13.5x28x4 (14) and the three nuts M12 (15) .
LEIL19WHL0740FB 2