
1 minute read
Install the straight connector (5) the port the steering priority valve (V) .
from CNH Joystick Steering Kit with Secondary Electrical 821G W190D Wheel Loader Instructions Manual
38. Install the straight connector (5) the JSS cut - f valve (37) . 39. Install the joystick steering tube (46) the straight connector (5) . 40. Install the ° elbow (48) the port the JSS cut - f valve (37) . 41. Install the tee the cooling frame (R) . 42. Install the return brake tank hydraulic hose (V) the tee . 43. Install the cut - f valve tank hydraulic hose (49) the ° elbow (48) and the tee . 44. Install the plugs (47) the JSS cut - f valve (37) .
LEIL19WHL0751GB 13