CNH Joystick Steering Kit with Secondary Electrical 821G W190D Wheel Loader Instructions Manual

Page 13

5 - ASSEMBLY

7. Install the O-rings (37A) supplied with the JSS cut-off valve (37) on the CL and the CR ports of the steering EHPS valve (2). 8. Install the JSS cut-off valve (37) on the steering EHPS valve (2). Secure with the six bolts M10x105 (40) and the six washers 11x21x2.5 (39). 9. Install the 45° elbows (38) on the C1 and the C2 ports of the JSS cut-off valve (37).

LEIL19WHL0741FB

3

13 EN


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
CNH Joystick Steering Kit with Secondary Electrical 821G W190D Wheel Loader Instructions Manual by www.heydownloads.com - Issuu