
1 minute read
Drive shaft(G) dismantled ............................................. 8.8
24 B
23
A

A
2.Push the suction line(23) and pressure line(24) with new round seal rings(9 and 11) into the expansion valve(10) and screw on the holding plate(B). 3.Seal the line guide with sealant (Fig.9,19,20)
20
4. Air conditioning unit– filling up the refrigerant, see page2.3.1. 5.Check the function and check for leaks.
6.Screw the cover(A) to the top of the cab. (Fig.21)
21
Removing the temperature switch
Hinge up the cab roof. Unscrew the cover(A) from the top of the cab. (Fig.22)