OMA

Page 35

Eunmin S&D, Seoul Seungsung Lee, Byungho Cho, Munjong Park, Hyunduck Lee, Junghun Ahn, Hongsuk Lee Haustechnik, Elektroplanung / Building services, Electrical planning: Pda (planning), Seoul Fertigstellung / Completion: 2008

China Central Television Headquarters Beijing, CN Bauherr / Client: China Central Television (CCTV), Peking / Bejing Architekten / Architects: Entwurf /Design: Rem Koolhaas and Ole Scheeren (until 2010), David Gianotten in Zusammenarbeit mit nachfolgenden Partnern /in collaboration with the following partners: Shohei Shigematsu, Ellen van Loon and Victor van der Chijs Projektmanagement / Project management: Yao Dongmei

Tragwerk, Bauphysik, Brandschutz, Sicherheit / Structure, Services, Fire, Security Engineering: Arup, London /Hong Kong /Beijing Lichtplanung / Lighting engineers: Lighting Planners Associates, Tokio / Tokyo Signaletik / Signage: 2 x 4 Landschaftsarchitekten / Landscape architects: Inside /Outside, Amsterdam Fertigstellung / Completion: 2012

Haustechnik / MEP engineers: Zuo Xin, Mao Yihua, Zhang Hongxia, Miao Xing, Jiang Xinhua, Wang Xiaoan, Lin Haixiong, Liu Yi, Han Guohai (Chefingenieure /MEP chief engineers) Akustik / Acoustics: Zhang Kuisheng, Wang Jinbo Akustikberatung / Acoustics Consultancy; DHV Building and Industry, Eindhoven Nachrichtentechnik / Broadcasting engineers: Shi Liangguang, Sun Wenjingn Innenarchitekten / Interior designers: Hu Ping (Interior director), Guo Guang (Interior vice director), Zhou Quan (Interior chief designer)

Projektleitung / Project architect: Clement Blanchet Mitarbeiter / Project team: Adam Furman, Karel Wuytack, Karen Crequer Bauleiter / Construction management: Bovis Lend Lease

Bauherr / Client: Porto 2001 / Casa da Música

Kostenplanung / Quantity surveyors: Davis Langdon Management Town Planning Consultants DP9

Architekten / Architects: OMA, Rotterdam Rem Koolhaas, Ellen van Loon (Partners in charge)

Audio-/ Videoberatung / AV Consultant: Mark Johnson Consultants

Projektleitung / Project architects: Arianne Fisher, Michelle Howard

Mitarbeiter / Project team: Isabel Silva, Uwe Herlijn, Nuno Rosado, Robert Choeff, Barbara Wolff, Stephan Griek, Govert Gerritsen, Saskia Simon, Mitarbeiter / Thomas Duda, Christian von der Muelde, Project team: Rita Amado, Philip Koenen, Peter Müller, Chris van Duijn, Hiromasa Shirai, Steven Krystian Keck, Eduarda Lima, Christoff Smith, Gabriela Bojalil, Joao Bravo Da Scholl, Alex de Jong, Alois Zierl, Olaf Hitz, Costa, Catarina Canas, Holly Chacon, Dan Jorge Toscano, Duarte Santos, Nelson Cheong, Keren Engelman, Gaspard Carvalho, Stefanie Wandinger, Catarina Estourgie, Kam Fai Tai, Fang Tieying, Canas, Shadi Rahbaran, Chris van Duijn, Feng Pei, Sarah Gibson, Chris James, Maria Baptista, André Cardoso, Paulo Michel van der Kar, Paul Kroese, Peter Costa, Ana Jacinto, Fabienne Louyot, Lee, Liu Xiaodong, Stuard Maddox, Nicolas Firket, Christina Beaumont, Joseph Monteleone, Christina Murphy, Anna Littl Shiro Ogata, Roberto Otero, Daan Ooievaar, Torsten Schroeder, Shi Wettbewerb / Wenchian, Faustina Tsai, Jasmine Tsoi, Wang Xinyuan, Victoria Willocks, Wu You, Competition: Rem Koolhaas, Fernando Romero Xu Tian Tian, Dirk Zschunke Havaux, Isabel Silva, Barbara Wolff, Uwe Herlijn Wettbewerb / Competition: Architekten vor Ort, Bauleitung / Rem Koolhaas, Ole Scheeren, Shohei Local architects, Construction Shigematsu, Alain Fouraux, Fernando management: Donis ANC Architects, Porto mit/with Adrianne Fisher, Anu Leinonen, Hiromasa Jorge Carvalho, Teresa Novais Shirai, Tammo Prinz, Catarina Canas, Tragwerksplanung / Erez Ella, Victoria Willocks, Johannes Structural engineering: Buchholz, Guillaume Colboc, Mamen Arup, London Escorihuela, Sarah Gibson, Shiro Ogata, mit / with Torsten Schroeder, L. E. Tsao, Zhaohui AFA, Vila Nova de Gaia Wu, Yimin Zhu

Tragwerksplanung / Structural engineering: Bao Lianjin, Mu Wei (Chefingenieure / Structural chief engineers)

Architekten / Architects: OMA; Rotterdam Rem Koolhaas (Partner in charge)

Casa da Música Porto, PT

Projektleitung / Project architects: Anu Leinonen, Charles Berman, Adrianne Fisher

Projektpartner vor Ort / Associate Architect and Engineer: ECADI (East China Architecture and Design Institute), Shanghai

Serpentine Gallery Pavilion London, UK

Haustechnik / Building services: Arup, London mit / with AFA, Vila Nova de Gaia Fassade / Facade: Robert Jan van Santen; Arup facades Gewellte Glasfassade / Curved glass facade: ABT Arnhem, Rob Nijsse Akustik / Acoustics: TNO Eindhoven und /and Dorsser Blesgraaf, Renz van Luxemburg, Theo Raijmakers Brandschutz / Fire protection: Arup fire, George Faller Fertigstellung / Completion: 2005

Integrierter Entwurf / Integrated Design: Arup

Abbau und Renovierung / Dismantling and Refurbishment: Keltbray Fertigstellung / Completion: 2006

Niederländische Botschaft / Netherlands Embassy Berlin, DE Bauherr / Client: Niederländisches Außenministerium – Dienst Gebouwen Buitenland, Den Haag / The Hague Architekten / Architects: OMA, Rotterdam Rem Koolhaas, Ellen van Loon (Partners in charge) Direktor / Project director: Erik Schotte

Bauphysik / Building physics: Lichtveld Buis & Partners, Utrecht Fassadenplanung / Facade planning: Rache und Willms, Aachen und / and Insideoutside, Amsterdam Akustik / Acoustics: Dorsserblesgraaf, Eindhoven Brandschutz / Fire protection: Hosser Hass + Partner, Berlin Lichtplanung / Lighting design: OVI, Washington DC /Berlin Generalunternehmer / General contractor: Kondor Wessels Berlin GmbH, Berlin Fertigstellung / Completion: 2003

Prada Epicenter NYC, US Bauherr / Client: Prada, New York Architekten / Architects: OMA /AMO, New York / Rotterdam Rem Koolhaas, Ole Scheeren (Partners in charge) Projektleiter / Project architects: Timothy Archambault, Eric Chang Mitarbeiter / Project team: Ergian Alberg, Amale Andraos, Benjamin Beckers, Christina Chang, Chris van Duijn, Alain Fouraux, Jennifer Jones, Julia Lewis, Christiane Sauer, Markus Schaefer, Oliver von Spreckelsen Tragwerksplaner / Structural engineering: Leslie E. Robertson Associates, New York Haustechnik / Building services: Ove Arup & Partners, New York Lichtplanung / Lighting design: Kugler Tillotson Associates Akustik / Acoustics: Shen Milsom & Wilke Fertigstellung / Completion: 2001

Projektleitung / Project architects: Michelle Howard, Gro Bonesmo Mitarbeiter / Project team: Beth Margulis, Anu Leinonen, Daan Ooievaar, Adrianne Fisher, Robert Choeff, Christian Muller, Oliver Schütte, Fernando Romero Havaux, Matthias Hollwich, Katrin Thorhauer, Barbara Wolff, Bruce Fisher, Anne Filson, Udo Garritzman, Jenny Jones, Shadi Rahbaran, Mette Bos, Adam Kurdahl, Stan Aarts, Julien Desmedt, Annick Hess, Rombout Loman, Antti Lassila, Thomas Kolbasenko, Moritz von Voss, Paolo Costa, Carolus Traenkner, Susanne Manthey, Christiane Sauer, Tammo Prinz, Nils Lindhorst, Felix Thoma Tragwerksplaner / Structural engineering: Royal Haskoning, Rotterdam und / and Arup, Berlin Haustechnik / Building services: Huygen Elwako Raadgevende Ingenieurs BV, Rotterdam und / and Arup, Berlin

Projektbeteiligte / Project Credits

183


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
OMA by DETAIL - Issuu