Martin Rauch: Refined Earth

Page 27

Screws ensure that earth layer and trass-lime or reinforced concrete beam hold together. They are screwed into rammed earth before casting.

Diagram left: The lintel above the doors of the Batschuns Chapel, executed in rammed earth on both sides. Section at 1:10 scale.

Diagram right: Standard section of the Rauch House. Façade of rammed earth, interior wall finished with clay plastering. Section at 1:10 scale.

Rammed earth wall 45 cm

Finish clay plaster 1 cm Clay undercoat 3 cm Reed insulation 2 x 5 cm Clay mortar

Reinforced conrete lintel 20 x 32 cm

Brick check Rammed earth wall 45 cm Reinforced trass-lime mortar

Screws

30 x 20 cm

97