Part III Use Standards | 16.338 Temporary Uses
16.338 TEMPORARY USES 16.338.01 PURPOSE AND APPLICABILITY These provisions address certain uses that are intended to be of limited duration, to ensure that they will not permanently alter the character or physical features of the sites they occupy, and will not have negative effects on surrounding development. Unless exempt, all temporary uses described in this Chapter shall require a Temporary Use Permit as provided below. The Director may only approve the Temporary Use Permit after finding that the application meets all of the applicable requirements of this Chapter.
16.338.02 REQUIREMENTS FOR SPECIFIC TEMPORARY USES A. Real Estate Office Within A Subdivision. 1. Accessory Structures and Facilities. Accessory structures and facilities are permitted in conjunction with the establishment of a temporary real estate office in conformance with an approved Temporary Use Permit. 2. Parking. The application shall include a site plan showing the real estate office and a parking area adequate to serve the users and visitors of the office. 3. Time Limitation. Maximum time limitation is 1 year. Extensions may be approved for a maximum of 2 years. B. Construction Office.
1. Conformity with Regulations. Prior to occupancy of a new building, the existing building will be brought into conformity with any additional regulation rendered applicable by the placement of any new building on the site. Conformity will be accomplished by removal, reconstruction, relocation, conversion, change of use or any combination thereof. 2. Guarantee of Completion. The Director shall require the landowner to provide a guarantee, which may include a bond or certified check, to insure full compliance with the zoning regulations upon completion of the new building or sooner if, in the manager’s opinion, work pertaining to the completion of all facilities required by law is not being diligently pursued. D. Animal Husbandry and Agricultural Education Projects. 1. Time Limitation. The maximum time period for any Temporary Use Permit is 2 years. 2. Health and Safety Requirements. The Temporary Use Permit application shall include a statement from the Solano County environmental health division that the proposed use complies with applicable County health and safety regulations. E. Christmas Tree Sales.
1. Sewage Disposal System. If a sewage disposal system is installed in a temporary construction office, it shall comply with the requirements of the building division.
1. Date of Opening. A Christmas tree sales facility shell neither be open for business nor show any evidence of this temporary use, during any calendar year, more than 60 days prior to Christmas Day.
2. Parking. The application for a Temporary Use Permit shall include a site plan showing the construction office and a parking area adequate to serve the users and visitors of the office.
2. Time Limitation. Maximum time limitation is 2 months.
3. Removal or Conversion. A temporary construction office shall be removed or shall be converted to a permitted use prior to the issuance of a certificate of use and occupancy for the main building or buildings. If construction is phased over a length of time, the Temporary Use Permit may provide that certificates of occupancy may be issued for completed buildings, except the last buildings to be completed, prior to removal or conversion of the temporary use.
164
C. Existing Buildings.
TITLE 16: ZONING CODE | VALLEJO, CA
3. Merchandise to Be Sold. A permitted Christmas tree sales facility may sell ornaments and other Christmas decorations in addition to Christmas trees but shall not engage in the sale of any merchandise not directly associated with Christmas trees and Christmas decorations. 4. Electrical Permit. The applicant shall secure an Electrical Permit from the building division if the facility is to be energized.
Draft: 01/06/2021