Roadmap for improving Early Warning and Early Action

Page 48

Road Map for Improving the Availability, Access and Use of Disaster Risk Information for Early Warning and Early Action including in the Context of Transboundary Risk Management AUC

monitoring phase especially in a system that needs to work smoothly across multiple levels, from the continental to the regional, and the national to the local levels. •

Figure 3 details the workflow of implementation of the system by identifying the four pillars of action that contribute to the overall system and that provide essential information to be consulted by the coordination operation room. The thematic components that need to be developed in parallel to one another and in connection with all the other initiatives include Risk Knowledge, Monitoring and Forecasting; Dissemination & Communication, Preparedness & Response, including raising public awareness.

AUC DREA RECS DRR DRMA

AUC DREA ACMAD RECS CC NHMS

AUC DREA ACMAD DRMA NHMS

AUC DREA DPA DSA PSD RECS DRR DRMA

AUC DREA

African Union Commission DRR Unit and Meteorology Unit

DPA

Department for Political Affairs

DSA

AUC Department for Social Affairs

PSD

Department for Peace and Security

ACMAD

African Center of Meteorological Applications for Development

RECS DRR

Regional Economic Communities Disaster Risk Reduction Unit

RECS CC

Regional Economic Communities Climate Centres

NDRMA

National Disaster Risk Management Agencies

NHMS

National Hydro Meteorological Services

UN System, International Organizations and Governments

Figure 3. Implementation Concept for the Establishment of the Supranational Multi-Hazard Early Warning System in Africa for Early Action and Transboundary Risk

1.

Risk knowledge is essential to determine the right scenarios to be addressed in the preparation phase and to assess the capacity to respond to the different possible scenario realizations. Important investments have already been made in developing national risk profiles. Country level probabilistic risk profiles are a strong asset when applied in support of a continental EWS. They need continuous improvement in order to be ready for use for multiple related applications. Quantitative risk profiles provide a measure of the risk, highlighting areas with high concentrations of potentially affected people, or at risk of physical and economic damages to infrastructures. Fully probabilistic risk profiles analyse all possible flood and drought loss scenarios. These scenarios, eventually used to produce the risk curve, can also be used as a basis for emergency planning. The scenarios, identified for the probabilistic risk assessment, provide a unique reference for understanding the

45


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Roadmap for improving Early Warning and Early Action by CIMA Research Foundation - Issuu