BUILDING EDUCATION - Learning Environments

Page 1

BUILDING EDUCATION

LEARNING ENVIRONMENTS

BOND Building is a premier full-service construction management and general contracting company delivering innovative solutions and collaborative client partnerships.

As a key area of expertise, we are focused on DEVELOPING THE FUTURE OF EDUCATION through the use of advanced technology and the construction of state-of-the-art facilities, utilizing creative and innovative strategy.

There’s nothing old school about it. We’ve been building innovative, world-class spaces and developing infrastructure for some of the most prestigious campuses in New England for more than a century.

Within the education sector, BOND Building’s focus goes far beyond a single project. We work closely with our college and university clients to gain a strong understanding of their long-range master plans so we can build facilities and create a framework that will support their institutional goals for years to come.

BOND Building thinks like an owner to develop studentcentered construction approaches with a laser focus on safety and minimizing disruption. Our dedication to the growth and development of academic campuses is a driving force that results in state-of-the-art learning, living and collaboration space for students across the Northeast.

OUR TEAM OF DEDICATED

DAVE CAPALDO, AIA Vice President, Public Sector

ACADEMIC BUILDERS

DAN RAMOS Vice President, Operations BOB MISCHLER Vice President, Operations MIKE SPODEK, CM-LEAN Project Executive

learning environments

BRYANT UNIVERSITY

Academic Innovation Center

The Academic Innovation Center is a two-story, 48,290SF facility which includes an innovation forum, faculty space, break-out rooms, an admissions center and cross-functional classrooms for students in the College of Business and College of Arts and Sciences. The building is designed to offer unprecedented flexibility, with moveable tables, smart technology and light-filled collaborative spaces that promote experiential teaching and new learning modules.

The opening of the Academic Innovation Center is a strategic inflection point for Bryant University. We have created a world-class learning environment that aligns with Bryant’s bold future. This transformational, world-class facility will be a legacy for generations to come.

project at a glance
“ square feet project achievement award 2017 saved through valve engineering 48k CMAA NE $200k bryant university smithfield, ri einhorn
architecture owner location architect
yaffee prescott

BOSTON UNIVERSITY

Joan & Edgar Booth Theatre

Boston University selected BOND Building to provide preconstruction and construction management services for the new Joan & Edgar Booth Theatre and Boston University Production Center. During an aggressive 15-month schedule, BOND Building constructed a 75,000 SF multi-functional facility, offering support spaces and design labs for teaching and producing student theatre. The new building features a two-level subsurface parking garage and adjoining parking lot, providing space for 286 vehicles.

A beautifully landscaped plaza on Commonwealth Avenue provides a welcoming focal point along with landscaped buffer zones along Essex and Dummer Streets.

square feet

75k LEED 250

black box seats

It’s a testament to our philosophy of what the theater is. And it reflects the aesthetic of the building itself, with its tilted facade, which reflects the life of the people in the plaza and on the sidewalk.

silver level

project at a glance
boston university brookline, ma
elkus manfredi architects location
owner architect

Emerson College’s Paramount Center is a first-of-its kind mixed-use residential, academic and performance venue. The 180,000 SF structure is a multi-use project that included the landmark restoration of Boston’s 1932-built Paramount Theatre and a total reconstruction of two adjacent buildings at 545 Washington Street in Downtown Boston. BOND Building provided construction management services for the new facility that now houses a 592-seat theatre, a 125-seat black box theatre, a 200-seat film-screening room, rehearsal studios, practice rooms, classrooms and four floors of residence hall space for Emerson students.

EMERSON COLLEGE Paramount Theatre

...The final design and execution has surpassed our expectations and aspirations. The collaboration with BOND Building and all the team members, shows in the details and the quality of work.

project at a glance
square feet restoration seat theatre 180k $90M
- Howard Elkus FAIA, RIBA, LEED AP Elkus Manfredi Architects emerson college boston, ma elkus manfredi architects owner location architect
592

BENTLEY UNIVERSITY Student Center

Bentley University’s Student Center is the campus’ home for student life. More than a decade after its opening, the amount of space needed for student organizations and services exceeded the building size. BOND Building was employed to provide preconstruction and construction services

for an 18,000 SF expansion and 20,000 SF renovation of the existing facility to accommodate the need for additional gathering, work and collaboration space. Dubbed the “Bentley Bubble,” the facility includes collaboration space, study rooms, team project rooms, new concessions, student activity offices and a pub.

Students just find their space and the building comes alive. We want it to be the place students can count on to build their community.

project at a glance
“ square
renovation sq ft expansion
bentley university waltham, ma perkins + will owner location architect silver level LEED
feet
20k 18k

BOSTON UNIVERSITY

Center for Student Services

Located in the center of busy Kenmore Square, Boston University’s 120,000 SF Center for Student Services consolidates several of the institution’s academic and advising programs into one space, while providing a much-needed student dining and meeting space on the eastern side of its campus. The Center’s first two floors are dedicated to student dining, its top four floors to educational and career development programs and its basement to a bakery and coffee shop, function room and community space.

These are places where people go and they stay for a long time, whether they’re sitting at a table and studying or working with students in their program or their class.

project at a glance
square feet seat dining 122k 1400 boston university boston, ma bruner/cott owner location architect gold level LEED

North Quad Infrastructure Upgrade

UMass Lowell’s North Quad, a centerpiece of the North Campus, has undergone a significant transformation. Composed of the interconnected Southwick, Kitson, Falmouth & Pasteur Halls, the University has revitalized these historic buildings for use as state-of-the-art office, classroom and computational laboratory space. The new Quad required a sound infrastructure to support these changes. BOND Building was engaged to provide preconstruction and construction services for the first phase of this project.

UMASS LOWELL

project at a glance

umass lowell (umba)

lowell, ma

owner location architect

icon

diesel emergency generators

additions/ pods

200kV ADA 2 improved

STONEHILL COLLEGE

Thomas and Donna May

School of Arts & Sciences

BOND Building provided preconstruction and construction management services for the 35,000 SF Academic & Welcome Center built on the site of the Old Student Union. The Center features an admissions room with tiered seating for more than 50 people, administrative and faculty offices, a 350-seat auditorium, classrooms, meeting spaces, a bookstore and an Au Bon Pain Café.

BOND Building used both in-house building information modeling (BIM) and laser scanning services to analyze the facility’s existing conditions and develop MEP systems, particularly useful in areas needing heavy drainage and ventilation.

project at a glance

stonehill college

owner location

easton, ma

architect

slam collaborative

square feet

seat auditorium

35k 50+ 350 seat admissions room

HARVARD UNIVERSITY

Arthur M. Sackler Building

BOND Building was selected to reconfigure and renovate studio and gallery space vacated by the Harvard Art Museums in the Sackler Building.

The project scope included life safety upgrades, accessibility upgrades, deferred maintenance, and regulated material abatement. Preservation was an integral part of this project for the following special features: entry lobby, main stair, gallery character, auditorium colonnade, and primary facades.

BOND Building’s Virtual Design & Construction (VDC) team played a critical role during this early stage. Laser scanning of both the interior and exterior of the building provided the design team with highly accurate Revit models of the existing building facade, structure, and other building systems.

project at a glance

harvard university

cambridge, ma

owner location architect

designlab architects

originally opened in 1985

59k preconstruction phase

ROBUST square feet

EXPER IENCE

BOND Building considers protecting every person within or near the construction site its foremost priority. No priority overrules safety at any time. We integrate safety into our construction planning and activities. This is represented by OUR 2022-2023 EMR RATING OF .79

SAFETY FORWARD

BEST PRACTICES.

EXPER
IENCE

Strong Planning & Preconstruction Expertise

Experts in Academic Building Construction

In-House VDC - Uses Laser Scanning & BIM Coordination Techniques, Tools and “Smart Planning” to Deliver Budget Certainty

Integration of Lean Strategies throughout the Process

KEYS TO SUCCESS VISION. EXCELLENCE.

BOND-BUILDING.COM DAN RAMOS Vice President, Operations 617.293.5971 cell | dramos@bond-building.com DAVID CAPALDO, AIA, LEEP AP Vice President, Public Sector 617.909.6711 cell | dcapaldo@bond-building.com

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.