BUILDING EDUCATION - Higher Education Overview

Page 1

BUILDING

EDUCATION

HIGHER EDUCATION

BOND Building is a premier full-service construction management and general contracting company delivering innovative solutions and collaborative client partnerships.

As a key area of expertise, we are focused on DEVELOPING THE FUTURE OF EDUCATION through the use of advanced technology and the construction of state-of-the-art facilities, utilizing creative and innovative strategy.

There’s nothing old school about it. We’ve been building innovative, world-class spaces and developing infrastructure for some of the most prestigious campuses in New England for more than a century.

Within the education sector, BOND Building’s focus goes far beyond a single project. We work closely with our college and university clients to gain a strong understanding of their long-range master plans so we can build facilities and create a framework that will support their institutional goals for years to come.

BOND Building thinks like an owner to develop studentcentered construction approaches with a laser focus on safety and minimizing disruption. Our dedication to the growth and development of academic campuses is a driving force that results in state-of-the-art learning, living and collaboration space for students across the Northeast.

THE BOND FAMILY OF COMPANIES

TIM PEER, PE VP, DISTRICT ENERGY DAVE CAPALDO, AIA VP, PUBLIC SECTOR PAUL JAMES SVP, RISK MANAGEMENT & GENERAL COUNSEL BOB MISCHLER VP OPERATIONS DAN RAMOS VP OPERATIONS MIKE WALSH, LEED AP VP, HEALTHCARE & LIFE SCIENCES CHRIS FOGG, CM-BIM, CM-LEAN VP, INTEGRATED SERVICES JAMES DINARDI, CCIFP CHIEF FINANCIAL OFFICER FRANK HAYES PRESIDENT BOND Building Construction, Inc. BOND-BUILDING.COM
Healthcare & Life Sciences Education District Energy
BOND Brothers, Inc. BONDBROTHERS.COM
MARKETS:
TONY BOND CHIEF EXECUTIVE OFFICER & PRESIDENT
BOND
Civil Infrastructure Electric Transmission & Distribution Oil & Gas Power Generation Commercial HVAC Water & Wastewater Industrial
RICH SMALL CHIEF FINANCIAL OFFICER
Civil & Utility Construction, Inc. BOND-CIVILUTILITY.COM
KANE CUDDY PRESIDENT CHRIS DECKER VP, NORTHERN NEW ENGLAND DAN FOPPIANO VP, NEW YORK CITY SCOTT CHURCHILL VP, SALES AND REVENUE STRATEGY KRISTAN KOCH CHIEF FINANCIAL OFFICER

OUR TEAM OF DEDICATED

DAVE

ACADEMIC BUILDERS

DAN RAMOS Vice President, Operations BOB MISCHLER Vice President, Operations MIKE SPODEK, CM-LEAN Project Executive

PRECONSTRUCTION & PROJECT PLANNING

WITH

GREG

We strive to be “cost stewards” for our clients...

Our Preconstruction Group, led by Greg Williamson, includes an expert team of building professionals with comprehensive backgrounds in creating detailed, accurate and reliable budgeting.

WILLIAMSON vp , preconstruction

A HOLISTIC APPROACH TO PLANNING

BOND Building adds immediate value to our clients through our smart planning exercises during preconstruction. Project planning decisions have the greatest impact on cost, schedule and quality. That’s why we take a “holistic approach” to preconstruction, evaluating the total impact of each decision. We consider each component – whether it’s constructability, cost evaluation, schedule impacts, or procurement strategies – and determine if the end result aligns with our client’s goals.

TECHNOLOGY & EXPERIENCE

Our formula for success is simple. We combine advanced technology with a highly experienced Estimating Department to support a practical, efficient, affordable and buildable design. Our estimating systems and processes integrate with BIM software by extracting quantities from the model’s develop-

ing intelligence. We integrate Revit models with On Screen Take-Off (OST) to summarize our findings in WinEst and produce real time estimates. Digitized colored graphics in OST and graphics from the Revit model help to clarify and illustrate BOND Building’s assumptions and quantifications.

PARTNERS IN COST LEADERSHIP

We strive to be “cost stewards” for our clients, acting as a partner to align project planning with financial goals. By listening to stakeholders involved – including owner, users and design teams – we can offer valuable insights that help our clients prioritize scope, allocate funds and achieve cost savings. By conducting comprehensive feasibility studies, we understand the cost drivers behind each project and offer creative solutions such as off-site prefabrication, alternative materials or sequencing, or market sensitive procurement strategies to realize best value.

Estimating & Value Engineering

Scheduling

Logistics/Sequencing/Phasing

Procurement/Suitability of Materials & Equipment

Planning for Exploratory Work

Constructibility Review

Interdisciplinary Coordination & Review

Permitting

Bidding

Sustainability and LEED

Commissioning Planning

Formal Risk Analysis

PRECONSTRUCTION PLANNING

higher education

COLLEGE OF THE HOLY CROSS

Hart Center at the Luth Athletic Complex

The College of the Holy Cross engaged BOND Building to provide preconstruction and construction management services for the renovation and expansion of the Hart Athletic Center.

This revitalized, modern facility is the central piece of the College’s plan to transform and rejuvenate their Athletics program.

281k 100 143k

This facility is a game-changer for Holy Cross, raising the profile of our athletics program and our entire institution. What we now have at Holy Cross exceeds the athletic facilities of so many of our peer institutions and even some of the top programs in the country in certain areas.

project at a glance
“ square feet yards of turf sq ft addition
college of the holy cross worcester, ma sasaki associates owner location architect

BRYANT UNIVERSITY

Academic Innovation Center

The Academic Innovation Center is a two-story, 48,290SF facility which includes an innovation forum, faculty space, break-out rooms, an admissions center and cross-functional classrooms for students in the College of Business and College of Arts and Sciences. The building is designed to offer unprecedented flexibility, with moveable tables, smart technology and light-filled collaborative spaces that promote experiential teaching and new learning modules.

The opening of the Academic Innovation Center is a strategic inflection point for Bryant University. We have created a world-class learning environment that aligns with Bryant’s bold future. This transformational, world-class facility will be a legacy for generations to come.

project at a glance
“ square feet project achievement award 2017 saved through valve engineering 48k CMAA NE $200k bryant university smithfield, ri einhorn
architecture owner location architect
yaffee prescott

BOSTON UNIVERSITY

Joan & Edgar Booth Theatre

Boston University selected BOND Building to provide preconstruction and construction management services for the new Joan & Edgar Booth Theatre and Boston University Production Center. During an aggressive 15-month schedule, BOND Building constructed a 75,000 SF multi-functional facility, offering support spaces and design labs for teaching and producing student theatre. The new building features a two-level subsurface parking garage and adjoining parking lot, providing space for 286 vehicles.

A beautifully landscaped plaza on Commonwealth Avenue provides a welcoming focal point along with landscaped buffer zones along Essex and Dummer Streets.

square feet

75k LEED 250

black box seats

It’s a testament to our philosophy of what the theater is. And it reflects the aesthetic of the building itself, with its tilted facade, which reflects the life of the people in the plaza and on the sidewalk.

silver level

project at a glance
boston university brookline, ma
elkus manfredi architects location
owner architect

HARVARD BUSINESS SCHOOL

Tata Hall

Sustainability was a central theme to Tata Hall’s design. A 37’ tall glass atrium is doubleskinned, providing a thermal blanket in cold weather and cooling convection in summer months. A rooftop, electricitygenerated photovoltaic array contributes to a 50% reduction in energy consumption and a 40% reduction in greenhouse gases. Other design choices reduce water consumption by 900,000 gallons per year.

harvard university

boston, ma

owner location architect

william rawn associates

project at a glance square feet

165k LEED 50%

energy reduction

platinum level

BRISTOL COMMUNITY COLLEGE

Bristol Community College (BCC) offers over 150 programs including nursing, dental hygiene and life sciences. To serve the needs of its increasing student population, BCC required a new Health and Science Building equipped with leading technology. The new 50,600 SF facility is one of the largest Zero Net Energy (ZNE) science buildings in the region. It includes teaching laboratories, support spaces, offices and community spaces.

Throughout the design process, the team uncovered ways to eliminate the use of fossil fuels while increasing efficiency and dramatically reducing demand — three critical components of achieving ZNE.

project at a glance

of construction 150 LEED 24 mo

This project was not just about a new building, but rather about how a building can help represent and champion the culture of an institution that has made sustainability a top priority.

- Fiske Crowell, FAIA, LEED AP Sasaki Principal bristol community college fall river, ma sasaki associates owner location architect

UMASS DARTMOUTH

School for Marine Science and Technology (SMAST)

With a goal to bring together the marine science activities of the University in one location, UMass Dartmouth decided to build a new, 64,500 SF facility. Closely collaborating with architect Ellenzweig and project manager Hill International, BOND Building provided preconstruction and construction management at-risk services for the new SMAST Building. The new facility supports the largest marine science program in the UMass System.

targeting

project at a glance
We really wanted, with the new building, to symbolize that this represents a new era for the program.
- Steven Lohrenz Dean of SMAST university of massachusetts dartmouth new bedford, ma ellenzweig owner location architect
“ silver level LEED
square feet scientists and staff
65k 150

MASSACHUSETTS INSTITUTE OF TECHNOLOGY Media Lab Expansion

The MIT Media Lab is a six floor structure with approximately 163,000 SF of laboratory, office and meeting space. The complex serves as a showplace for new concepts in design, communications systems and collaborative research.

The mission of the facility is to ignite new energy and connectivity between researchers. The glass throughout the building forces transparency among its occupants.

163k 25+

square feet

platinum level LEED research groups

The media lab will help plumb the depths of how technology can have a greater impact on industry, society and business.

owner location architect

project at a glance
massachusetts institute of technology cambridge, ma maki & associates

STONEHILL COLLEGE

Thomas and Donna May

School of Arts & Sciences

BOND Building provided preconstruction and construction management services for the 35,000 SF Academic & Welcome Center built on the site of the Old Student Union. The Center features an admissions room with tiered seating for more than 50 people, administrative and faculty offices, a 350-seat auditorium, classrooms, meeting spaces, a bookstore and an Au Bon Pain Café.

BOND Building used both in-house building information modeling (BIM) and laser scanning services to analyze the facility’s existing conditions and develop MEP systems, particularly useful in areas needing heavy drainage and ventilation.

project at a glance

stonehill college

owner location

easton, ma

architect

slam collaborative

square feet

seat auditorium

35k 50+ 350 seat admissions room

HARVARD UNIVERSITY

Arthur M. Sackler Building

BOND Building was selected to reconfigure and renovate studio and gallery space vacated by the Harvard Art Museums in the Sackler Building.

The project scope included life safety upgrades, accessibility upgrades, deferred maintenance, and regulated material abatement. Preservation was an integral part of this project for the following special features: entry lobby, main stair, gallery character, auditorium colonnade, and primary facades.

BOND Building’s Virtual Design & Construction (VDC) team played a critical role during this early stage. Laser scanning of both the interior and exterior of the building provided the design team with highly accurate Revit models of the existing building facade, structure, and other building systems.

project at a glance

harvard university

cambridge, ma

owner location architect

designlab architects

originally opened in 1985

59k preconstruction phase

ROBUST square feet

STONEHILL COLLEGE

BOND Building provided preconstruction and construction management services for Stonehill College’s School of Business, which is a key component of the school’s revitalization program to transform the campus for the future.

Located in the main quadrangle of the campus, the 65,000 SF facility provides an innovative and active learning space for students in accounting, finance, international business, management, marketing, economics, and healthcare administration. It features cutting-edge technology and flexible, adaptive classrooms that support handson learning and collaboration, preparing students to operate more successfully in the working world.

project at a glance

stonehill college

easton, ma

owner location architect

slam collaborative

extensive and effective use of BIM

65k services

PRECONSTRUCTION & CONSTRUCTION square feet

BOSTON COLLEGE

Thomas More Apartments Residence Hall

Boston College engaged BOND Building to provide preconstruction and construction management services for its new 490 bed residence hall located at 2150 Commonwealth Avenue. The facility strengthens the College’s residential community by providing student living space in a mix of apartment-style suites. The residence hall blends seamlessly with the surrounding campus buildings, fostering student collaboration and creating a welcoming entry point from the major Commonwealth Avenue thoroughfare. The project achieved LEED Silver accreditation and utilized Lean building practices to streamline schedule.

boston college

boston, ma

owner location architect

einhorn yaffee prescott

490

available beds

project at a glance square feet silver level

245k LEED

BRANDEIS UNIVERSITY Residence Hall

Brandeis University engaged BOND Building to provide preconstruction and construction management services for its new 50,000 SF, 160-bed residence hall. The new building will feature a new common space for students, study spaces, four lounges, a kitchen and a courtyard. Elevators and a main stairway will allow for easier movement between floors. The new residence hall will also be the most sustainable building on campus. A renovation of the beloved Chum Coffee House was re-opened in time for the fall 2017 semester.

This is a phenomenal project, which incorporates sustainability and modern design. We are excited to deliver upon the vision of this new facility which reflects the University’s commitment to academic excellence and innovation.

project at a glance
square feet bed residence hall 50k
- Robert Murray BOND Building President brandeis university waltham, ma william rawn associates owner location architect

REALITY CAPTURE | VIRTUAL DESIGN & CONSTRUCTION | MEP SERVICES

INTEGRATED SERVICES START WITH THE END IN MIND.

BOND Building’s Integrated Services model is a collaborative approach that combines the latest technology innovations with the brightest teams to manage a project’s entire life-cycle.

Develop Logistics Plans Supported by Model Renderings, 4D Timeline Simulations and Critical Pick Rigging Animations

Conduct Constructability Peer Reviews

Provide Laser Scanning Services that Create Accurate As-Built Models of Existing Conditions

Evaluate Installation Accuracy with use of Hololens Augmented Reality, BIM Box and BIM 360 Field Resolve Spatial Conflicts and Constructability Issues

Provide Solution-Based Clash Detection

Manage “Supplemental” Revit Model to Enhance the Detail of the Coordination Long Lead Equipment Validation

Touch QA/QC Technology for Real-Time Analytics and Metrics (Accessed in the Field on iPads)

Deliver Long-Term Operations & Maintenance (O&M) Ready Facilities

EXPER IENCE

BOND Building considers protecting every person within or near the construction site its foremost priority. No priority overrules safety at any time. We integrate safety into our construction planning and activities. This is represented by OUR 2022-2023 EMR RATING OF .79

SAFETY FORWARD

BEST PRACTICES.

EXPER
IENCE

Strong Planning & Preconstruction Expertise

Experts in Academic Building Construction

In-House VDC - Uses Laser Scanning & BIM Coordination Techniques, Tools and “Smart Planning” to Deliver Budget Certainty

Integration of Lean Strategies throughout the Process

KEYS TO SUCCESS VISION. EXCELLENCE.

BOND-BUILDING.COM DAN RAMOS Vice President, Operations 617.293.5971 cell | dramos@bond-building.com DAVID CAPALDO, AIA, LEEP AP Vice President, Public Sector 617.909.6711 cell | dcapaldo@bond-building.com

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.