LEAFLET TRN INSTALLATIONS ASSOCIATED TO TRANSPORT

Page 4

MAIN WORKS RELATED TO TRANSPORT INSTA High Speed of Levante. Levante. Accesses to Albacete Client: ADIF

Date: October 2005 and August 2007

Main missions: Detailed design and technical Assistance, which, among others, includes the electrification, the railway installations and the new interlocking for conventional gauge of: - Travellers station - Railway Variant (5,0 km) - Freight Terminal - Maintenance Base

New Railway Complex of Valladolid Client: ADIF

Date: April 2005 and March 2009

Main missions: Detailed design and Technical Assistance witch, among others, includes the railway safety installations, with a new interlocking, the electrification, the installations associated to the new facilities of the complex and its urbanisation and the equipment of the machinery of the different centres: - Infrastructure maintenance base - Freight Terminal - Integral railway maintenance base - Centre of railway welding - Centre of rail technology

Installations of the Tunnels of the Calle 30 (Madrid) Client: Madrid Calle 30, S.A. Main missions:

Date: April 2006

Inspection, supervision and quality guarantee, of the command centre of the tunnels of the M-30 and definition of the installation specifications and integration works.

- 45km of urban tunnels - 30 installation subsystems: energy, ventilation, detection and fire extinction, lighting, evacuation CCTV, acoustics, etc. - New Command Centre that having 900 cameras, 3.500 speakers, 287 variable signalisation panels, 711 SOS pickets , mobile phone coverage and radio communications


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.