LEAFLET TRN RELATED TO ROADS

Page 1

IngenierĂ­a

Consultancy and Road Engineering

Headquarters C/ Doctor Esquerdo, 97 28007 Madrid – Spain Tel. +34 91 409 60 75 Fax. +34 91 557 04 11 Skype: trningenieria @: trn@trningenieria.com Web: www.trningenieria.com


A Company specialised in Transport Engineering TRN Ingenierí Ingeniería y Planificació Planificación de Infraestructuras S.A. S.A is a Spanish company founded in 1996 by professionals of the transport and the architecture fields. Its main Objective is the client satisfaction, detecting his needs to offer the more innovative and favorable solutions within the accorded delays, trying to develop adapted methodologies for the treatment of each project. The activities performed by TRN Ingeniería are mainly developed in the Transport field, field such in the railway field as in the urban transport. The multidisciplinary team of TRN Ingeniería comprises the knowledge related to transport from the planning to the commissioning and consulting in the operation of different transport systems, including the project development and the construction supervision. Consulting and Planning Feasibility Studies Preliminary studies Detailed designs operation Construction Supervision Operation Consulting TRN Ingeniería has participated actively in international projects related to financed projects by multilateral entities, having references within the fourth continents : Europe (Spain, France and Romania), Latin America (Colombia, Mexico and Peru), Africa (Algeria and Cameroon) and Asia (China and India).

The company has offices in: - Madrid (Headquarters) - Barcelona (Transfer Enginyeria) - Colombia (TRN branch) - Peru (TRN branch)

- Romania (TRN Proiectare) - Mexico (commercial representation) - Cameroon (commercial representation) - Brazil (commercial representation)


Consultancy and Road Engineering TRN Engineering and Infrastructure Planning SA, specialised in the field of transport, has a wide experience in planning, design and construction supervision of new alignment highways, highways as well as multiple interventions in highways and conventional roads in service (reconditioning , alignment improvement, road widening, accesses ordination, rest areas, safety road improvements, road reinforcements, etc.) and tunnel installations. installations The works have been developed in different fields and have been marked by the high technology and the know how developed by the personnel of TRN Ingeniería in civil engineering, road infrastructures, security installations, signalling and communications, operation and maintenance.

TRN Ingeniería offers technologic know how in the field of roads, from the planning to the operation, acquired during more than 15 years of trajectory.

The integral conception of the project allows us to anticipate and incorporate futur problems from the preliminary design, to the definition of viable technical and fonctional sollutions.

Related to the Spanish Road Network, Network TRN Ingeniería has worked in more than 1.000 km, positioning itself as an engineering benchmark. Has participated in eight (8) Preliminary and feasibility Designs (150 km), fifteen (15) detailed designs (100 km), and five (5) road safety contracts. In the field of new roads alignment , TRN has participated in more than 18 works in the public sector. Among its main clients we can find: The Ministry of Public Works, Generalitat Valenciana, GISA (Cataluña), Provilsa (Castilla y León). It is remarkable the intervention of TRN Ingeniería in the technical assistances of the road works control and supervision , having participated in actions totalling 2.761 km, among which we can highlight the control and installations of the tunnels in the MM-30 of Madrid, Madrid worldwide referent when it comes to urban tunnels.


MAIN WORKS RELATED TO THE ROAD TRAN Highway AA-57. Section: VilaboaVilaboa-A Ermida (Pontevedra) Pontevedra) Client: Ministry of Public Works Date: March 2009 - January 2013 Budget of the contract (VAT excluded): 1.075.196,73 € Main tasks: Alignment and detailed design of the following projects: - Highway of 6,5 km and connection branch of 1,8 km with the N550 and with conventional road section - Two junctions in the highway - One junction in the N-550 - Four viaducts - Five passages above the highway - Six passages under the highway - More than 20.000 m2 ecologic walls

Road Safety in the State Road Network (Madrid) Client: Ministry of Public Works Date: April 2010 - April 2013 Budget of the contract (VAT excluded): 556.189,00 € Main tasks: Alignment of projects and studies for the road safety improvement in the state road network of the demarcation of Madrid: - Studies of the accidents and action propositions - Propositions of preventive actions - Specific studies in road safety and support for the elaboration of reports and computer management. - Study orders and alignment of 10 projects, with a total amount of the projected works of more than 65 M€.

Fourth belt of Zaragoza. Section: Roundabout east (Zaragoza) Client: Ministry of works Date: November 2005 – November 2008 Budget of the contract (VAT excluded): 539.226,93 € Main tasks: Assistance to control and supervision of the works of the 9,64 km highway, corresponding 6,54 km to the core of the east roundabout of the fourth belt, and 3,1 km meters to the Variant of the N-II, with the following characteristics: - Viaduct above the river Ebro, 396 m - False urban tunnel, of 585 m - Nine overpasses - Eight underpasses - Pedestrian walkway - 4,8 millions of m3 of earth moving - 68.900 m3 of concrete - 225.000 t of MBC


NSPORT PERFORMED BY TRN INGENIERÍA Highway AA-15. Section: Sauquillo del CampoCampo-Almazá Almazán (Soria) Soria) Client: Ministry of Public works Date: January 2006 – November 2007 Budget of the contract (VAT excluded): 409.677,33 € Main tasks: Alignment and detailed design : - Highway of 16 km, from which 10 km are of new alignment and 6 of duplication of the road. - Six junctions -Two viaducts above the channel of the Duero river - Viaduct above the Duero river - Pergola above the railway - 15 transversal passages

Highway AA-7. Expansion to a third rail by road (Murcia) Client: Ministry of Public Works Date: July 2008 – ongoing Budget of the contract (VAT excluded): 666.167,95 € Main tasks: Alignment and detailed design for the widening of the platform to three rails of a section of the highway in service - 16 km long - Two junctions and a semi junction, with modification of one of the junctions - Four viaducts - 23 transversal passages - Actions to ensure the stop coverage visibility and preliminary study of the work phases

Control and Installations Center. Tunnels of the MM-30 (Madrid) Client: Madrid Calle-30 Date: April 2006 – August 2008 Budget of the contract (VAT excluded): 730.772,59 € Main tasks: Assistance to the control and supervision for inspection, supervision and quality guaranty of the control centre construction works and the specification of the installation of the 43 km of the M-30 tunnels, with the following characteristics: - 35.000 luminaires - 520 Variable message panels - 975 cameras of TV and 67 traffic lights - 80.000 m of optic fiber - 2.500 BIES and 675 pickets SOS - 725 gas detector and anemometers - 36 remote stations


The 30 main TRN Road references PRELIMINARY DESIGN, ALIGNMENT AND CONSTRUCTION PROJECTS Highway A-40. Section: Santa Cruz de la Zarza-Tarancón. Alignment, detailed design Highway A-59. Section :Vilaboa-O Viso. Alignment and detailed design Studies and Road safety . State Roads Demarcation in Madrid. A-1. Molar crossing; A-1, junction with the M-40; M-40, roundabout p.k 27; M-40. P.k. 19, modification of the alignment. Detailed design A-3, junction with the M-50. Alignment Highway A-7. Section: junction Orihuela/Benferri-junction Monteagudo/Fortuna widening to a third rail by road. Alignment and detailed design Highway A-57. Section: Vilaboa-A Ermida. Alignment and detailed design Highway A-15. Section: Sauquillo del Campo-Almazán Alignment and detailed design Road CV-15. Section La Pelechaneta (Vall d'Alba) CV-165. Preliminary Design. Environmental Impact study and landscape integration study

Highway A-22. Section: Variant of Almacelles (Este) – L.M. of Huesca. Alignment and detailed design

N-230. Sections: Alguaire-Lp Huesca. Structural pavement Rehabilitation project. Margin improvements and rural accesses redistribution

N-230. Section: Lleida-Alguaire. Structural road Rehabilitation project. Margin improvements and rural accesses redistribution

N-II. Section: Municipal term of Alcarrás. Detailed design Road safety improvement of the intersections and accesses redistribution

Highway A-2. Three rest areas in the P.K. 453,000; 472,500 and 482,000. Alignment and detailed design Highway A-62. Section: Fuentes de Oñoro-Frontier with Portugal. Alignment and detailed design

Road Safety and road rehabilitation: N-550, p.k. 133. Pedestrian walkway; N640. Variant of Ponte Vilariño; N-550. Section: Redondela-Porriño; N-541. Section: p.k. 81,800 al 82,200, Detailed design. A-55 p.k. 8,000 al 14,000. Service roads. Rehabilitation project Rest areas in the highways A-4 y A-5 Detailed design PLANNING AND PRELIMINARY STUDIES Highway A-57. to Cañiza (Highway A-52)-Pontevedra. Preliminary study. Highway A-59. Highway A-57 - Arterial Vigo Network and access to the airport of Peinador. Preliminary study. Corridor N-110. Segovia-Santo Tomé del Puerto. Preliminary study Highway A-57. Section Pilarteiros-Barro and connection AP-9. Preliminary study Highway Alcázar de San Juan - N-IV. Preliminary study. VA-30. West outer ring road of Valladolid. Preliminary study Conversion to highway of the road SG-20.Segovia Bypass. Preliminary study Operations area and logistic activities in fields of the Motril's port improvement. Study and project of the implantation and development Variant of Redondela. N-550. Preliminary study

TRAFFIC STUDIES Construction and operation of the highway El Morrrazo and the autonomic road network in the peninsula of El Morrazo. Traffic study Highway A-23. Section: Torrubia - María de Huerva. Traffic study Highway A-59. Section: O Viso-Arrufana y Arrufana-Airport. Traffic study CONSTRUCTION SUPERVISION Madrid Calle 30. Installations and Command Center. Inspection, supervision and quality assurance.

Fourth belt of Zaragoza. Section: East outer ring . Control and supervision of the works Conservation of the pavement and rehabilitation of structures in the A-4, A-5, A42 and N-400. Control and supervision of six works Highway A-67. Section: Osorno-Villaprovedo. Control and supervision of the works


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.