LEAFLET TRN RELATED TO THE SUPERVISION OF THE WORKS

Page 1

IngenierĂ­a

Construction Supervision

Headquarters C/ Doctor Esquerdo, 97 28007 Madrid – Spain Tel. +34 91 409 60 75 Fax. +34 91 557 04 11 Skype: trningenieria @: trn@trningenieria.com Web: www.trningenieria.com


A Company specialised in Transport Engineering TRN Ingenierí Ingeniería y Planificació Planificación de Infraestructuras S.A. S.A is a Spanish company founded in 1996 by professionals of the transport and the architecture fields. Its main Objective is the client satisfaction, detecting his needs to offer the more innovative and favorable solutions within the accorded delays, trying to develop adapted methodologies for the treatment of each project. The activities performed by TRN Ingeniería are mainly developed in the Transport field, field such in the railway field as in the urban transport. The multidisciplinary team of TRN Ingeniería comprises the knowledge related to transport from the planning to the commissioning and consulting in the operation of different transport systems, including the project development and the construction supervision. Consulting and Planning Feasibility Studies Preliminary studies Detailed designs operation Construction Supervision Operation Consulting TRN Ingeniería has participated actively in international projects related to financed projects by multilateral entities, having references within the fourth continents : Europe (Spain, France and Romania), Latin America (Colombia, Mexico and Peru), Africa (Algeria and Cameroon) and Asia (China and India).

The company has offices in: - Madrid (Headquarters) - Barcelona (Transfer Enginyeria) - Colombia (TRN branch) - Peru (TRN branch)

- Romania (TRN Proiectare) - Mexico (commercial representation) - Cameroon (commercial representation) - Brazil (commercial representation)


Consulting and Engineering in the Construction Supervision TRN Engineering and Infrastructure Planning SA, specialised in the field of transport, has a wide experience in planning, design and construction supervision of railway works, roads, metro, tramway and associated equipments construction . The necessary optimisation of the projects and the complexity of the works have highlighted the services of the technical assistance during the construction, provided by TRN and its experienced multidisciplinary teams. The works have been developed in different fields and have been marked by the high technology and the know how developed by the personnel of TRN Ingeniería as in civil engineering, road infrastructures, security installations, signaling and communications, operation and maintenance. TRN Ingeniería offers technologic know how in the field of roads, from the planning to the operation, acquired during more than 15 years of trajectory.

The integral conception of the project allows us to anticipate and incorporate future problems from the preliminary design, defining viable technical and functional solutions

TRN Ingeniería offers specialised and experienced technical assistance to works in different fields, with the provided technical guarantee of knowing in detail the entire project cycle, from planning to operation, so it can offer a wide range of services related to the supervision in construction: Supervision of works Control and supervision Health and Safety Coordination Among its main clients we can find: Ministry of public works, Adif, Renfe, Madrid Calle 30, railway of the andalousian board, Metro of Madrid.


MAIN WORKS RELATED TO THE CONSTRUCTION S High speed line AntequeraAntequera-Granada. Section: QuejigaresQuejigares-Variant of Loja). Platform Client: ADIF Date: January 2012 – Ongoing Budget of the contract (VAT excluded): 1.453.678,77€ Description of the works: Execution of the high speed platform in a section of 3,121 Km long Main units: - Viaduct above the railway line. (580 m) - Viaduct above the river Frío (374 m) -1 superior passage and one inferior passage - Earth works: 623.796 m3 - Concrete 54.475 m3 - Steel: 8.662 Tm

New railway access of Levante. Levante. Section: AlbaceteAlbacete-Variant of Alpera. Alpera. Phases I and II Client: ADIF Date: February 2009 – October 2012 Budget of the contract (VAT excluded): 3.384.856,61 € Description of the works: We execute a high speed platform in a section of 44 Km and a conventional line section of 3,5 Km Main units: : - Pergola under A-31 - Viaduct above A-31 (562 m) - 2 Viaducts of 3 openings (104m) - 13 superior passages - 2 inferior passages -Earth works: 3.500.991 m3 - Concrete: 69.645 m3 - Steel: 11.430 Tm

Fourth belt of Zaragoza. Section: Round East (Zaragoza) Client: Ministry of Public Works Date: August 2005 – November 2008 Budget of the contract (VAT excluded): 1.078.453,86 € Description of the works: We execute 9,64 km of highway, corresponding 6,54 km to the East round core to the fourth belt and 3,10 km to the Variant of theE N-II Public Units: - Viaduct above the river Ebro (396 m) - False urban tunnel (585 m) - 9 superior passages - 8 inferior passages - Earth works: 4. 790.000 m3 - Concrete 68.893 m3 - Steel: 9.600 Tm


SUPERVISION PERFORMED BY TRN INGENIERÍA New railway complex of Valladolid Client: Valladolid high speed 2003 Date: Mars 2009 – Ongoing Budget of the contract (VAT excluded): 3.142.151,34 € Description of the works: The action is made in a surface of more than 70 Ha for warehouses and platforms, among which we can highlight the new central workshop of Integria reparations with 77.000 m² Surface of industrial warehouse Main Units: - Earth moving: 1.619.860 m3 - Concrete 83.619 m3 - Steel: 3.409 Tm

Works of the line 1 of the light rail train in Granada. Workshops and carriages Client: Railways of the andalousian board Date: December 2008–Ongoing Budget of the contract (VAT excluded): 575.829,10 € Description of the works: Construction of the light rail train line 1 in Granada, as well as the workshop and carriages complex Main units: -Length of the rails: 7180 m -Nº Detours: 25 -Nº of rails, workshops and carriages: 14 - Nº of facilities: 3 - Length of the optic fiber: 6730 m - Nº of catenaria pickets: 135

Highway AA-67 Cantabria - Meseta. Meseta. Section OsornoOsorno-Villaprovedo Client: Ministry of Public Works Date: August 2005 – December 2008 Budget of the contract (VAT excluded): 925.916,24 € Description of the works: Construction of section with highway characteristics between the locations of Osorno and Villaprovedo (Palencia) Main Units: - 2 Viaducts (300 m) - 9 superior passages - 3 inferior passages - Earth works: 2.500.000 m3 - Concrete 20.000 m3 - Steel: 2.150 Tm


The 20 main TRN Construction Supervision references RAILWAY WORKS Control of the works of the Girona station construction. Phase I Control of the works of the the high speed line Antequera-Granada platform. Section: Quejigares-Variant of Loja Control of the works of the construction project of the new railway high speed access of Levante. Madrid-Castilla La Mancha-community of Valencia- Murcia region. Section: Albacete-Variant of Alpera. Phase II Technical assistance and coordination in health and safety practices on the jobsite of the "New railway complex of Valladolid" Control of the platform works of the new railway access of Levante. Madrid-Castilla La Mancha- Community of Valencian- Murcia region. Section: Albacete-Variant of Alpera. Phase I Control of the platform works of the new high speed access railway Levante. Madrid-Castilla La Mancha-Community of Valencia-Region of Murcia. Section: Accesses to Albacete Control of the platform works of the new railway access of Levante. Madrid-Castilla La Mancha-Comunnity of Valencia- Murcia region. Section: Torrejoncillo-Abia de la Obispalia Project and control of the platform works. Section: Caudete-Villena, New high speed railway access to Levante. Madrid-Castilla La Mancha – Comunnity Region of Murcia. Execution site: Caudete-Villena. Control and supervision of the renovation works of the electrification installation in Arévalo and Gomeznarro station. L/Madrid-Hendaya Control and supervision of the works of electrification installation in the stations of Velayos, Sanchidrián y Adanero – Muñoz. Section: Ávila – Medina del Campo, de la L/Madrid - Hendaya ROAD WORKS Inspection , supervision and guarantee of the quality of the command centre of the M-30 tunnels and the specifications of installations and integration works. Control and supervision of the works: Fourth belt of Zaragoza. Section: Round East Control and Supervision of 6 works of road conservation and structure rehabilitation in the A-4, A-5, A-42 and N-400, in the province of Toledo Control and supervision of the works: Highway Cantabria-Meseta A-67. CN-611, from Palencia to Santander, P.K. 49,800 to 560,500. Section: Osorno-Villaprovedo WORKS OF METRO AND TRAMWAY Supervision of the works of the light rail train line 1 in Granada. Workshops and carriages Engineering services for the legalisation of the low voltage installations of 49 stations in the Madrid metro network. Engineering service for the legalisation of the low voltage installations of line 9 Metro of Madrid stations HEALTH AND SAFETY COORDINATION Health and Safety coordination for the widening of the parking in the light rail train station of Valdemoro Health and Safety coordination for the remodelling of the Meco station Health and Safety coordination in the execution of the Ciempozuelos station parking Health and Safety coordination in the execution of the Valdemoro station parking


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.