Truebeck | Education Qualifications

Page 1

EDUCATION

SERVING OTHERS SINCE 2007. PIONEERING IDEAS AND RAISING THE BAR.

Truebeck Construction was founded with a gamechanging spirit and an ambitious vision: disrupt the traditional and ordinary, and rigorously raise the bar to do our best work. Period. We’re driven by the belief that we can improve construction practices and elevate standards, while creating remarkable places in our community.

Many things are built. Few things are crafted smart and well. We have an entrepreneurial nature – thinking big, but not acting big – and perform as true builders with boots on the ground. We absolutely love construction, and you’ll see that in everything we do. It’s never business as usual on our jobsites or in the office; in fact, it’s more like a championship game.

We strive for greatness in the details, the dirty work, and in the victory of helping you achieve your vision.

OFFICE LOCATIONS

Portland

Sacramento

San Francisco San Mateo

ABOUT US

Truebeck Construction is an industryleading full-service general contractor specializing in technical building, complex projects, and interiors. Clients come to us when they have ambitious goals, and when they want certainty, predictable costs, and high-performance buildings. We build it right the first time and deliver the best value

A FULL-SERVICE GC

Truebeck’s work environment foregoes department silos, and instead encourages deep collaboration—with disciplines sitting side-by-side. Working in nimble, autonomous teams, each project squad develops their own strategies and efficiencies to achieve the best outcome for your vision. When you work with Truebeck, you engage all our integrated disciplines.

Alternative Delivery Methods

Construction Technology + Innovation

MARKET SECTORS

Education

Commercial Healthcare Interiors

Life Sciences

Mass Timber

Mission Critical

Mixed-Use

Multi-Family

$1 billion

Design-Build

Integrated Project Delivery

MEP Expertise

Preconstruction

Safety Management

Self-Perform

550+

QUALIFICATIONS + EXPERIENCE
ANNUAL AVERAGE REVENUE
EMPLOYEES

OUR VALUES

These are the values that guide our people and business. They’re what we look for in every employee across the company. Recognizing that our success is founded upon these beliefs, they embody our culture and promise to our employees and business partners. This is our DNA.

TRUEBECK CONSTRUCTION

WE WIN AS A TEAM AND HIGH-FIVE A LOT.

DON’T DO WHAT’S EASY. DO WHAT’S RIGHT. AND HUSTLE. PROJECT SUCCESS. EVERY TIME. NO EXCUSES.

IF IT’S NOT THE BEST, IT SIMPLY WON’T DO.

COURAGEOUSLY, MAKE IDEAS REALITY. BUSINESS AND LIFE ARE ALL ABOUT PEOPLE.

TRUEBECK CONSTRUCTION 11 9 6 3 10 8 5 2 7 1 4
AWARDS

PROJECT AWARDS

AIA Merit Award for Energy and Sustainability

DBIA, Regional Award for Educational Category

Go Beyond Award for a New Construction Project

USGBC-Northern California, Green Building Super Hero

UC Davis Winery, Brewery & Food Science Bldg, Davis, CA (8)

Coworky Award for Best Space Design

ENR Best Project

Bespoke Co-working, San Francisco, CA (4)

ENR Best Project

Twitter Headquarters/1Tenth, San Francisco, CA (9, 11)

ENR Best Project

Gilead Wellbeing Center, Foster City, CA

ENR Best Project

SmartLabs North Tower Lab & Office, So. San Francsico , CA

ENR Best Project

Mozilla Headquarters, Mountain View, CA (3)

ENR Best Project

IIDA Award

GitHub Headquarters, San Francisco, CA (2)

SAFETY AWARDS

President’s Safety Award

Construction Employers’ Association (2016–Present)

CA Voluntary Protection Program (Cal/VPP) Designation

Cal/OSHA (2016–Present)

Excellence in Safety

Construction Employers’ Association (2007–2021)

1st Place National Construction Safety Excellence Award

AGC (2013)

IIDA Design Excellence Award for Best in Education

TEL HI Child Care Center, San Francisco, CA

Interior Design Magazine, Best Tech Office of the Year

Largest San Francisco Construction Project

Uber Headquarters, Mission Bay, San Francisco, CA (1)

NAIOP Best of the Bay Award

Tribune Tower, Oakland, CA

Real Estate Deal of the Year

Uptown Station, Oakland, CA

Silicon Valley Structures Milestone Project of the Year

Apple Park, Cupertino, CA (5, 6)

Silicon Valley Structures Award Project of the Year

Stanford Research Park at 3223 Hanover, Palo Alto, CA (7)

NOTABLE COMPANY AWARDS

Best Places to Work

San Francisco Business Times (2013, 2014, 2017-2022) (10)

Top 100 Bay Area Corporate Philanthropist

San Francisco Business Times (2017– 2022)

QUALIFICATIONS + EXPERIENCE
TRUEBECK CONSTRUCTION

University of California, Santa Cruz

Kresge College Campus Renewal SANTA CRUZ, CA

PROJECT DESCRIPTION

Kresge College is a dynamic, academic community along a ridge in a redwood forest. Kresge students study liberal arts through creative community spaces, interdisciplinary and experimental teachings, and conscientious approaches to living and learning. The Truebeck/EHDD design-build team will address the University’s need for student housing and also focus on critical campus repairs and renovation, imminent seismic upgrade requirements, and site accessibility.

The redevelopment includes eight new dormitories providing 585 beds, new Town Hall building, renovation of five academic buildings, and demolition of 10 existing structures. The eight new residential halls consist of mass timber and steel structures, with Kresge L being the tallest at six stories. The advantages of mass timber prefabrication are leveraged to provide schedule and cost savings and improved carbon impacts. The project also includes extensive campus sitework on challenging terrain.

SIZE

156,000sf

CONSTRUCTION COST

$250 million

PROJECT ARCHITECT

EHDD Architecture

KEY FEATURES / AWARDS + CERTIFICATIONS

Design-build; Mass timber

TRUEBECK CONSTRUCTION
TRUEBECK
CONSTRUCTION
QUALIFICATIONS + EXPERIENCE

University of California, Davis

Winery, Brewery, and Food Science Building

DAVIS, CA

PROJECT DESCRIPTION

This award-winning design-build project for the UC Davis consists of three main components: the winery for the Department of Viticulture and Enology; the brewery small scale fermentation and classroom; and the food pilot plant for the Department of Food Science and Technology. The entire project provided a world-class research and teaching facility. Support spaces for each department include laboratories, classrooms, offices, controlled temperature rooms, and storage facilities.

The facility was designed and built to achieve LEED Platinum certification. Sustainable features include an energy efficient design, rainwater storage for all landscaping irrigation, photovoltaic panels, and the maximization of daylight into the space. The facility is designed to allow for future capabilities to capture/ sequester carbon dioxide and reclaim processed water in the winery.

SIZE

34,000sf

CONSTRUCTION COST

$17.25 million

PROJECT ARCHITECT

Flad Architects

KEY FEATURES / AWARDS + CERTIFICATIONS

Design-build; LEED Platinum, USGBC-Northern California, Green Building Superhero; AIA Merit Award for Energy and Sustainability; California Construction Best Award; Award of Merit for Green Building

TRUEBECK CONSTRUCTION
QUALIFICATIONS + EXPERIENCE

Sonoma State University

Wine Spectator Learning Center

ROHNERT PARK, CA

PROJECT DESCRIPTION

This project was a renovation and seismic upgrade of a 1960s-era university commons building into a modern educational facility with three focal areas: an education core, a student commons with areas for collaboration and student-run businesses; and an industry center with space for professional and academic faculty and program leadership. Sonoma State’s Wine Spectator Learning Center is a state-ofthe-art facility with classrooms and outdoor space to teach 300+, venues for public seminars and events, and technology to reach the world. The design utilizes modern learning and working practices to inspire collaboration for students and visitors. The Student Commons encompass a student hub, a wine entrepreneurship laboratory, an outdoor study terrace and a wine business research library.

SIZE

18,000sf

CONSTRUCTION COST

$8.3 million

PROJECT ARCHITECT

TLCD Architecture

KEY FEATURES / AWARDS + CERTIFICATIONS

North Bay Business Journal Top Project Award (2017)

TRUEBECK CONSTRUCTION
QUALIFICATIONS + EXPERIENCE

University of California, Santa Cruz

Merrill College Renovation

SANTA CRUZ, CA

PROJECT DESCRIPTION

Complete renovation of the interior and exterior of five dormitories and surrounding site work at the UC Santa Cruz. Two, five-story poured-in-place concrete buildings had new windows installed, new access bridges constructed, new elevators for ADA access, remodeled student dormitory rooms, and new roof and mechanical systems installed. Two, three-story wood framed with plaster exterior buildings had new windows installed, new interior finishes, and new fire sprinkler systems. One, two-story apartment building with four units had all new windows and doors installed, new interior finishes, and new fire protection systems added.

SIZE

84,000sf

CONSTRUCTION COST

$25 million

PROJECT ARCHITECT

Cody Anderson Wasney Architects

TRUEBECK CONSTRUCTION
QUALIFICATIONS + EXPERIENCE

Sonoma State University

Stevenson Hall

ROHNERT PARK, CA

of new construction comprised of building expansion with cantilevered steel, atrium addition, and significant seismic retrofitting. Complete renovation of the existing three-story 1967 Stevenson Hall building—the campus’ largest academic building—includes complete new systems, 60% exterior skin replacement designed to provide more natural light, and site improvements. The project accommodates classrooms, offices, conference rooms, computer and bioscience labs, and a psychology observation room. Sustainability is a critical project component, with improving environmental quality and reducing resource utilization primary focuses for this LEED Gold project.

Truebeck performed extensive preconstruction services as well as phasing, scheduling, and site logistics solutions. Core project objectives aim to improve campus educational spaces to better meet the needs of the associated disciplines.

CONSTRUCTION COST

$75.5 million

PROJECT ARCHITECT

EHDD Architecture

KEY FEATURES / AWARDS + CERTIFICATIONS

Design-build; LEED Gold; Fitwel Star

TRUEBECK CONSTRUCTION
QUALIFICATIONS + EXPERIENCE

San Francisco University High School California Campus

SAN FRANCISCO, CA

PROJECT DESCRIPTION

In a four-phase effort that spans four campuses for San Francisco University High School, an independent college preparatory school, the Campus Master Plan will increase school enrollment and dramatically improve campus teaching, learning, athletic and community gathering spaces.

This project includes the first phase of incremental make-ready improvements to existing campuses and the phase two California Campus development. The new California Campus includes the demolition of the existing structure on the 19,888sf site and construction of a new 49,000sf building, complete with a competition-ready gymnasium with telescoping bleachers, 4,500sf of general assignment classrooms, 7,500sf of specialized learning spaces such as science labs and prep rooms, 12,000sf of formal and informal work and community gathering spaces including food service for students and teachers, 2,500sf of faculty and administration space, and outdoor commons areas.

SIZE

49,000sf

CONSTRUCTION COST

Confidential per Client

PROJECT ARCHITECT

Leddy Maytum Stacy Architects

TRUEBECK CONSTRUCTION
QUALIFICATIONS + EXPERIENCE

Lick-Wilmerding High School

Campus Expansion and Renovation

SAN FRANCISCO, CA

PROJECT DESCRIPTION

Lick-Wilmerding High School is one of California’s leading College Preparatory schools. This 55,140sf private high school campus expansion replaced an outdated 1950s-era building with a new steel structure while maintaining the historic building exterior. The building replacement accommodated new classrooms, staff offices, and locker rooms for gym use.

The project also builds a new entry, plaza, lobby and administrative offices at Ocean and Howth streets and renovated part of an existing building to reconfigure and expand science laboratories and technology classrooms. The project achieved LEED Platinum certification, as well as Living Building Challenge Petal certification, a program that requires meeting a series of advanced performance requirements during 12 continuous months of operation. Incorporating Net Positive Energy in its design, the building produces more energy than it consumes.

SIZE

47,140sf (New Building); 8,000sf (Tenant Improvement)

CONSTRUCTION COST

$30 million

PROJECT ARCHITECT

EHDD Architecture

KEY FEATURES / AWARDS + CERTIFICATIONS

Net Positive Energy; LEED Platinum, Living Building Challenge Petal certification

TRUEBECK CONSTRUCTION
QUALIFICATIONS + EXPERIENCE

Marin Country Day School

Upper School Improvements

CORTE MADERA, CA

PROJECT DESCRIPTION

Marin Country Day School is an independent K-8 coed day school at a 35-acre campus in Corte Madera, California. The campus redevelopment included demolition of several existing small buildings, 24-foot-tall retaining wall, new two-story 10,000sf classroom and science building, built into a hillside with significant rock excavation, and installation of temporary modular classrooms.

Additionally, Truebeck undertook the extensive site improvements, consisting of two new sports fields, parking area, underground utilities, and a complete creek restoration. The project achieved LEED Platinum and Net Zero certification.

SIZE

10,000sf

CONSTRUCTION COST

$19 million

PROJECT ARCHITECT

EHDD Architecture

KEY FEATURES / AWARDS + CERTIFICATIONS

LEED Platinum; Net Zero Energy

TRUEBECK CONSTRUCTION
QUALIFICATIONS + EXPERIENCE

Pinewood School

Middle Campus Renewal & Expansion

LOS ALTOS, CA

PROJECT DESCRIPTION

The project included demolition of five classroom buildings and one single family home and construction of six new one-story, wood-framed classroom buildings, which house 10 new academic classrooms, a science classroom, art and music classrooms, and a computer lab/library. The project also included a new high bay, multi-purpose building with a restroom/mechanical core and server kitchen. The existing two-story administration building was renovated to house new teacher workrooms and office spaces, including new MEP and fire sprinkler systems. The existing garage was relocated and converted from a classroom into conference space. Site redevelopment included expanded parking, revised traffic circulation and parking layout, and hardscape and softscape landscaping. The total new open space is 43,520sf, with a 21,250 play area including hardcourts, a playing field, and play structure surfacing. The campus includes a substantial on-site water management system.

SIZE

23,050sf (Buildings); 64,770sf (Sitework)

CONSTRUCTION COST

Confidential per client

PROJECT ARCHITECT

Cody Anderson Wasney

TRUEBECK CONSTRUCTION
QUALIFICATIONS + EXPERIENCE

Cathedral School for Boys

Terrace Addition & Classroom Renovation

SAN FRANCISCO, CA

PROJECT DESCRIPTION

Originally constructed in the 1960s, the Cathedral School for Boys undertook a 12,000sf capital improvements project consisting of a new 4,000sf second-level addition and 8,000sf renovation of the Lower and Upper School classrooms. The majority of the renovations were made to the original school building, with the new addition being built on top of the structure that was added in 2008 in between the school and Grace Cathedral.

Surrounded by the landmark Grace Cathedral, construction in this tight, congested environment was challenging, especially given the location of the addition between the occupied and operational existing school building and the cathedral—the nature of the work was “surgical” and required creative logistical planning. The new addition has also been designed following precepts for additions to historic buildings, requiring Historic Preservation Commission review in the planning process.

SIZE

12,000sf

CONSTRUCTION COST

$10 million

PROJECT ARCHITECT

Charles Bloszies

TRUEBECK CONSTRUCTION
QUALIFICATIONS + EXPERIENCE

TEL HI

Child Care Center

SAN FRANCISCO, CA

PROJECT DESCRIPTION

Located within Uber’s new 450,000sf global headquarters in Mission Bay, the 14,941sf early child care center includes dedicated pre-school, toddler, and infant areas with sleeping quarters contained within the infant spaces. The facility also includes large multi-purpose breakout areas, individual micro-kitchens, and a 4,593sf play yard complete with jungle-gym, water features, shade sails, rubber flooring, and art installations. Ginsburg Kershner Associates (GKA) has been the childcare consultant for this project as well as in childcare centers for top Tech companies like Apple, Salesforce, and Facebook.

SIZE 14,941sf

CONSTRUCTION COST

$4.5 million

PROJECT ARCHITECT

ZGF Architects

TRUEBECK CONSTRUCTION
QUALIFICATIONS + EXPERIENCE

Felton Institute

Early Care & Education Tenant Improvement

SAN FRANCISCO, CA

PROJECT DESCRIPTION

The Felton Institute has an innovative, identityfocused approach to learning which cultivates an inclusive, and nurturing child care environment. This project is a 4,600sf build-out of new infant and toddler classrooms, library, playground, and teachers’ lounge in an early care and education center.

SIZE

4,600sf

CONSTRUCTION COST

$2 million

PROJECT ARCHITECT

Leddy Maytum Stacy Architects

KEY FEATURES / AWARDS + CERTIFICATIONS

Design-build

TRUEBECK
CONSTRUCTION
QUALIFICATIONS + EXPERIENCE

Crystal Springs Uplands School

Mansion Renovation

HILLSBOROUGH, CA

PROJECT DESCRIPTION

An independent, coeducational, college-prep day school for sixth through 12th grades, Crystal Springs’ 1915 mansion, designed by Willis Polk & Co., is a 47,000sf steel and concrete structure comprised of three levels, a full basement, and an intermediate level in the service wing. The historic renovation includes seismic, MEP, and technology upgrades to meet student and faculty needs and current CA building codes. The new facility includes enlarged classrooms, upgraded energy performance, improved landscaping and parking areas, and comprehensive hardscape and sitework. Rehabilitated interior finishes in the mansion include specialty European fixtures, marble fireplaces and mantles originating from a 16thcentury Italian castle, a 16th-century hand-carved ceiling from northern Italy in the ballroom, and Italian ironwork and German woodcarving throughout.

SIZE

47,000sf

CONSTRUCTION COST

$25 million

PROJECT ARCHITECT

KEY FEATURES / AWARDS + CERTIFICATIONS

Historic restoration; Seismic upgrade

TRUEBECK CONSTRUCTION
EHDD

University of California, Berkeley

VLSB Teaching Lab Renovation

BERKELEY, CA

PROJECT DESCRIPTION

The Valley Life Sciences Building project consists of two biological teaching laboratories and laboratory preparation space. Relocation of classrooms and computer labs within existing library. Completed in an operating classroom and lecture hall. Work performed off-hours ensuring facility remained fullyfunctional throughout construction.

SIZE

5,000sf

CONSTRUCTION COST

$2.6 million

PROJECT ARCHITECT

GL Planning & Design

TRUEBECK CONSTRUCTION
MARKET SECTOR Portland Sacramento San Francisco San Mateo
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.