Truebeck | Education Qualifications

Page 1


SERVING OTHERS SINCE

Truebeck is a top 10 general contractor defined by safety, quality, partnership, and values. Founded by Sean Truesdale and David Becker in 2007, Truebeck quickly established a reputation for excellence through a commitment to best-in-class service, innovation, and high performance. Truebeck specializes in building awardwinning projects within the commercial office, education, healthcare, life science, mission critical, mixed-use, multifamily, and interiors market sectors.

Born in the Bay Area, Truebeck has grown to 450+ employees and four offices dedicated to serving clients throughout the West Coast. We remain steadfast and committed to improving construction practices and elevating industry standards while contributing to the community. Truebeck’s foundational values continue to guide our people and business.

OFFICE LOCATIONS

San Francisco

San Mateo

$1 billion

ABOUT US

Truebeck Construction is an industryleading full-service general contractor specializing in technical building, complex projects, and interiors. Clients come to us when they have ambitious goals, and when they want certainty, predictable costs, and high-performance buildings. We build it right the first time and deliver the best value

A FULL-SERVICE GC

Truebeck’s work environment foregoes department silos, and instead encourages deep collaboration—with disciplines sitting side-by-side. Working in nimble, autonomous teams, each project squad develops their own strategies and efficiencies to achieve the best outcome for your vision. When you work with Truebeck, you engage all our integrated disciplines.

Construction Technology + Innovation

Design-Build

Integrated Project Delivery

MEP Expertise

MARKET SECTORS

These are the values that guide our people and business. They’re what we look for in every employee across the company. Recognizing that our success is founded upon these beliefs, they embody our culture and promise to our employees and business partners. This is our DNA.

WE WIN AS A TEAM AND HIGH-FIVE A LOT.

DON’T DO WHAT’S EASY. DO WHAT’S RIGHT. AND HUSTLE.

PROJECT SUCCESS. EVERY TIME. NO EXCUSES. IF IT’S NOT THE BEST, IT SIMPLY WON’T DO.

COURAGEOUSLY, MAKE IDEAS REALITY. BUSINESS AND LIFE ARE ALL ABOUT PEOPLE.

PROJECT AWARDS

AIA Merit Award for Energy and Sustainability

DBIA, Regional Award for Educational Category

Go Beyond Award for a New Construction Project

USGBC-Northern California, Green Building Super Hero

UC Davis Winery, Brewery & Food Science Building (8)

Coworky Award for Best Space Design & ENR Best Project

Bespoke Co-working (4)

DBIA Awards, Innovations & Design Excellence

Sonoma State Stevenson Hall

DJC Oregon Top Projects, 1st Place, Industrial, Manufacturing, or Logistics

The Factor Building

ENR Best Project Awards

Twitter Headquarters/1Tenth (9, 10)

Gilead Wellbeing Center

SmartLabs North Tower Lab & Office

Mozilla Headquarters (3)

GitHub Headquarters (2)

ENR California, Best Project, Excellence in Sustainability & Best Project, Government/Public Building;

Silicon Valley Business Journal Structures Awards, Public/Civic Project

County of San Mateo, County Office Building (COB3)

ENR, Best Project, California Merit Award

SF-Marin Food Bank

SAFETY AWARDS

CA Voluntary Protection Program (Cal/VPP) Designation

Cal/OSHA (2016–Present)

President’s Safety Award

Construction Employers’ Association (2016–2023)

Excellence in Safety

Construction Employers’ Association (2007–Present)

1st Place, National Construction Safety Excellence Award

AGC (2013)

IIDA Award

San Mateo Science Center

GitHub Headquarters (2)

IIDA Design Excellence Award, Best in Education

TEL HI Childcare Center

ENR California, Best Project, Interior/ Tenant Improvement; Silicon Valley Business Journal Structures Awards, Honoree for Interiors, Small Arc Institute

Interior Design Magazine, Best Tech Office of the Year, Largest San Francisco Construction Project; Uber Headquarters, Mission Bay, San Francisco, CA (1)

Metal Construction Association, Best Overall, Best

Solar, and Best Custom project; Silicon Valley Business Journal Structures Awards, Honoree for Office Project, Medium

Thirty75 Tech Office Development

NAIOP Best of the Bay Award Tribune Tower

Real Estate Deal of the Year Uptown Station

Silicon Valley Business Journal Structures Awards, Milestone Project of the Year

Apple Park (5, 6)

Silicon Valley Business Journal Structures Awards, Project of the Year

Stanford Research Park at 3223 Hanover (7)

NOTABLE COMPANY AWARDS

Best Places to Work

San Francisco Business Times (2013–2014, 2017-2024)

Top 100 Bay Area Corporate Philanthropist

San Francisco Business Times (2017–2024)

University of California, Santa Cruz Kresge College Campus Renewal

SANTA CRUZ, CA

PROJECT DESCRIPTION

Kresge College is a dynamic, academic student community organized along a ridge in a redwood forest. Kresge students study liberal arts through creative community spaces, interdisciplinary and experimental teachings, and conscientious approaches to living and learning. The Truebeck/ EHDD design-build team will address the University’s urgent need for more student housing and also focus on critical campus repairs and renovation, imminent seismic upgrade requirements, and site accessibility.

The redevelopment includes eight new dormitories, utilizing modular construction, with 585 beds, new Town Hall building, the renovation and refresh of five academic buildings, and demolition of 10 structures. The eight new residential halls consist of mass timber and steel structures, with Kresge L being the tallest at six stories. The advantages of mass timber prefabrication are leveraged to provide schedule and cost savings and improved carbon impacts. The project also includes extensive sitework.

SIZE

156,000sf

CONSTRUCTION COST

$250 million

PROJECT ARCHITECT

EHDD Architecture

KEY FEATURES / AWARDS + CERTIFICATIONS

Design-build; Mass timber; LEED Silver; Modular and pre-fabrication construction

University of California, Davis

Winery, Brewery, and Food Science Building

DAVIS, CA

PROJECT DESCRIPTION

This design-build world-class research and teaching facility for UC Davis consists of three main components; a winery for the Department of Viticulture and Enology; a small scale fermentation brewery and classroom; and a food pilot plant for the Department of Food Science and Technology. The facilities house a working small-scale winery, brewery, and food processing pilot plant, in addition to a dairy processing room. The winery includes large experimental fermentation areas, controlled temperature rooms barrel, bottle cellars, and a testing lab. Support spaces for each department include laboratories classrooms offices controlled temperature rooms and storage facilities. Extensive sustainable features include energy-efficient lighting, rainwater storage for landscaping irrigation, PV panels, and maximizing daylight. The facility is designed to allow for future capabilities to capture/ sequester carbon dioxide and reclaim process water in the winery.

SIZE

34,000sf

CONSTRUCTION COST

$17.25 million

PROJECT ARCHITECT

Flad Architects

KEY FEATURES / AWARDS + CERTIFICATIONS

Design-build; LEED Platinum, USGBC-Northern California, Green Building Superhero; AIA Merit Award for Energy and Sustainability; California Construction Best Award; Award of Merit for Green Building

Sonoma State University

Wine Spectator Learning Center

ROHNERT PARK, CA

PROJECT DESCRIPTION

This project was a renovation and seismic upgrade of a 1960s-era university commons building into a modern educational facility with three focal areas: an education core, a student commons with areas for collaboration and student-run businesses; and an industry center with space for professional and academic faculty and program leadership. Sonoma State’s Wine Spectator Learning Center is a state-ofthe-art facility with classrooms and outdoor space to teach 300+, venues for public seminars and events, and technology to reach the world. The design utilizes modern learning and working practices to inspire collaboration for students and visitors. The Student Commons encompass a student hub, a wine entrepreneurship laboratory, an outdoor study terrace and a wine business research library.

SIZE

18,000sf

CONSTRUCTION COST

$8.3 million

PROJECT ARCHITECT

TLCD Architecture

KEY FEATURES / AWARDS + CERTIFICATIONS

North Bay Business Journal Top Project Award (2017); AIA Redwood Empire Chapter Merit Award (2018).

University of California, Santa Cruz

Merrill College Renovation

SANTA CRUZ, CA

PROJECT DESCRIPTION

The LEED Silver project included a complete renovation of the interior and exterior of five dormitories and surrounding sitework at the University of California Santa Cruz. Two, five-story poured-in-place concrete buildings had new windows installed, new access bridges constructed along with new elevators for ADA access, remodeled student dormitory rooms, and new roof and mechanical systems installed. Two three-story wood framed with plaster exterior buildings had new windows installed, new interior finishes, and new fire sprinkler systems installed and one two-story apartment building with 4 units had all new windows and doors installed, new interior finishes, and new fire protection systems added.

SIZE

84,000sf

CONSTRUCTION COST

$25.5 million

PROJECT ARCHITECT

Cody Anderson Wasney Architects

KEY FEATURES / AWARDS + CERTIFICATIONS

LEED Silver

Sonoma State University

Stevenson Hall Renovation

PROJECT DESCRIPTION

Utilizing a design-build delivery method designed to increase collaboration, the project includes 32,000sf of new construction for the colleges of Education, Social Sciences, Business and Economics. The project was a complete renovation and expansion including an atrium addition with significant seismic retrofitting throughout. Truebeck provided all new MEPF systems, 60% exterior skin replacement designed to provide more natural light, and site improvements. The project accommodates classrooms, offices, an urban design studio, conference rooms, computer and bioscience labs, and a psychology observation room. Sustainability is a critical component, with improving environmental quality and reducing resource utilization primary focuses for this LEED Gold project.

Truebeck performed extensive preconstruction services as well as phasing, scheduling, and site logistics. Core objectives aim to improve campus educational spaces to better meet the needs of the associated disciplines.

SIZE

140,000sf

CONSTRUCTION COST

$72 million

PROJECT ARCHITECT

EHDD Architecture

KEY FEATURES / AWARDS + CERTIFICATIONS

Design-build; LEED Gold; Fitwel Star; Extensive sitework; BIM coordination; Design-Build Institute of America Innovation Award; Design-Build Institute of America Design Excellence Award

San Francisco University High School California Campus

SAN FRANCISCO, CA

PROJECT DESCRIPTION

In a four-phase effort that spans four campuses for San Francisco University High School, the independent college preparatory school, the Campus Master Plan will increase school enrollment and dramatically improve campus teaching, learning, athletic and community gathering spaces. This project includes the first phase of incremental make-ready improvements to existing campuses and the phase two California Campus development. The new California Campus includes the demolition of the existing structure on the 19,888sf site and construction of a new 49,000sf building, complete with a competition-ready gymnasium with telescoping bleachers, 4,500sf of general assignment classrooms, 7,500sf of specialized learning spaces such as science labs and prep rooms, 12,000sf of formal and informal work and community gathering spaces including food service for students and teachers, 2,500sf of faculty and administration space, and outdoor commons areas.

SIZE

49,000sf

CONSTRUCTION COST

Confidential per Client

PROJECT ARCHITECT

Leddy Maytum Stacy Architects

Lick-Wilmerding High School Campus Expansion and Renovation

SAN FRANCISCO, CA

PROJECT DESCRIPTION

Lick-Wilmerding High School is one of California’s leading College Preparatory schools. This 55,140sf private high school campus expansion replaced an outdated 1950s-era building with a new steel structure while maintaining the historic building exterior. The building replacement included a seismic retrofit and accommodated new classrooms, staff offices, and locker rooms for gym use.

The project also builds a new entry, plaza, lobby and administrative offices at Ocean and Howth streets and renovated part of an existing building to reconfigure and expand science laboratories and technology classrooms. The project achieved LEED Platinum certification, as well as Living Building Challenge Petal certification, a program that requires meeting a series of advanced performance requirements during 12 continuous months of operation. Incorporating Net Positive Energy in its design, the building produces more energy than it consumes.

SIZE

47,140sf (New Building); 8,000sf (Tenant Improvement)

CONSTRUCTION COST

$30 million

PROJECT ARCHITECT

EHDD Architecture

KEY FEATURES / AWARDS + CERTIFICATIONS

Net Positive Energy; LEED Platinum, Living Building Challenge Petal certification

Lick-Wilmerding High School

Theater Roof & Gym Upgrades

SAN FRANCISCO, CA

PROJECT DESCRIPTION

Lick-Wilmerding High School is one of California’s leading College Preparatory schools. This interior improvement project involved comprehensive upgrades to the facility, including mechanical, electrical, and architectural improvements. It included removal and replacement of existing rooftop HVAC equipment, installation of a new SBS roofing membrane, and re-roofing of the existing theater with new mechanical rooftop units (RTUs).

The gymnasium underwent significant renovations, including the replacement of basketball flooring, bleachers, and backstops, along with upgraded athletic equipment. Additionally, all-new electrical systems were installed to support the gym’s enhanced functionality.

SIZE

10,000sf

CONSTRUCTION COST

Confidential per client

PROJECT ARCHITECT

Gym: EHDD Architecture

Theater: NSA Architects

KEY FEATURES / AWARDS + CERTIFICATIONS

Mechanical & electrical upgrades; RTUs; SBS roofing membrane; Upgrades to gymnasium

Marin Country Day School

Upper School Expansion

PROJECT DESCRIPTION

Marin Country Day School is an independent K-8 coed day school at a 35-acre campus in Corte Madera, California. The campus redevelopment included demolition of several existing small buildings, 24-foot-tall retaining wall, new two-story 10,000sf classroom and science building, built into a hillside with significant rock excavation, and installation of temporary modular classrooms.

Additionally, Truebeck undertook the extensive site improvements, consisting of two new sports fields, parking area, underground utilities, and a complete creek restoration. The project achieved LEED Platinum and Net Zero certification.

SIZE 10,000sf

CONSTRUCTION COST

$19 million

PROJECT ARCHITECT

EHDD Architecture

KEY FEATURES / AWARDS + CERTIFICATIONS

LEED Platinum; Net Zero Energy

Pinewood School

Middle Campus Renewal & Expansion

LOS ALTOS, CA

PROJECT DESCRIPTION

The project included demolition of five classroom buildings and one single family home and construction of six new one-story, wood-framed classroom buildings, which house 10 new academic classrooms, a science classroom, art and music classrooms, and a computer lab/library. The project also included a new high bay, multi-purpose building with a restroom/mechanical core and server kitchen. The existing two-story administration building was renovated to house new teacher workrooms and office spaces, including new MEP and fire sprinkler systems. The existing garage was relocated and converted from a classroom into conference space.

Site redevelopment included expanded parking, revised traffic circulation and parking layout, and hardscape and softscape landscaping. The total new open space is 43,520sf, with a 21,250 play area including hardcourts, a playing field, and play structure surfacing. The campus includes a substantial on-site water management system.

SIZE

23,050sf (Buildings); 64,770sf (Sitework)

CONSTRUCTION COST

Confidential per client

PROJECT ARCHITECT

Cody Anderson Wasney

Cathedral School for Boys

Terrace Addition & Classroom Renovation

SAN FRANCISCO, CA

PROJECT DESCRIPTION

Originally constructed in the 1960s, the Cathedral School for Boys undertook a 12,000sf capital improvements project consisting of a new 4,000sf second-level addition and 8,000sf renovation of the Lower and Upper School classrooms. The majority of the renovations were made to the original school building, with the new addition being built on top of the structure that was added in 2008 in between the school and Grace Cathedral.

Surrounded by the landmark Grace Cathedral, construction in this tight, congested environment was challenging, especially given the location of the addition between the occupied and operational existing school building and the cathedral—the nature of the work was “surgical” and required creative logistical planning. The new addition has also been designed following precepts for additions to historic buildings, requiring Historic Preservation Commission review in the planning process.

SIZE 12,000sf

CONSTRUCTION COST

$10 million

PROJECT ARCHITECT

Charles Bloszies

TEL HI

Child Care Center

SAN FRANCISCO, CA

PROJECT DESCRIPTION

Located within Uber’s new 450,000sf global headquarters in Mission Bay, the 14,941sf early child care center includes dedicated pre-school, toddler, and infant areas with sleeping quarters contained within the infant spaces. The facility also includes large multi-purpose breakout areas, individual micro-kitchens, and a 4,593sf play yard complete with jungle-gym, water features, shade sails, rubber flooring, and art installations. Ginsburg Kershner Associates (GKA) was the childcare consultant for this project as well as in childcare centers for top tech companies like Apple, Salesforce, and Facebook.

SIZE 14,941sf

CONSTRUCTION COST

$4.5 million

PROJECT ARCHITECT

ZGF Architects

Felton Institute

Early Care & Education Tenant Improvement

SAN FRANCISCO, CA

PROJECT DESCRIPTION

The Felton Institute has an innovative, identityfocused approach to learning which cultivates an inclusive, and nurturing child care environment. This project is a 4,600sf build-out of new infant and toddler classrooms, library, playground, and teachers’ lounge in an early care and education center.

SIZE 4,600sf

CONSTRUCTION COST $2 million

PROJECT ARCHITECT Leddy Maytum Stacy Architects

KEY FEATURES / AWARDS + CERTIFICATIONS

Design-build

Felton Institute

548 Delta Street Tenant Improvement

SAN FRANCISCO, CA

PROJECT DESCRIPTION

The Felton Institute has an innovative, identity focused approach to learning which cultivates an inclusive, and nurturing child care environment. This early childhood education center renovation is in an existing building on three levels. The scope includes demolition of existing partitions and floor areas, preservation of existing structure and the addition of new structural, electrical, plumbing, mechanical, accessible path, stairs, and a food prep kitchen. The scope also includes a new ADA lift, new LULA lift, sitework, and play surfacing.

SIZE

4,600sf

CONSTRUCTION COST

$6.19 million

PROJECT ARCHITECT Leddy Maytum Stacy Architects

KEY FEATURES / AWARDS + CERTIFICATIONS

ADA compliant; LULA lift; Sitework; Demolition

Confidential Girls’ School Parking Garage

PROJECT DESCRIPTION

Truebeck is building phase one of this campus modernization project to bring the school a sustainable state-of-the-art campus. Phase one includes a new underground parking garage beneath the existing play field. The new garage will have be 25,655sf with 52 standard parking spaces. The parking garage ramp will allow one lane for entry and one for exit. Site improvements include stormwater capture and treatment, replacing the softball field at the grade, minor parking lot modifications for the garage entrance and exit.

SIZE

25,655sf

CONSTRUCTION COST

Confidential per Client

PROJECT ARCHITECT

Form4 Architecture

KEY FEATURES / AWARDS + CERTIFICATIONS

Underground parking garage; 52 parking spaces

Crystal Springs Uplands School

Mansion Renovation

HILLSBOROUGH, CA

PROJECT DESCRIPTION

An independent, coeducational, college-prep day school for sixth through 12th grades, Crystal Springs’ 1915 mansion, designed by Willis Polk & Co., is a 47,000sf steel and concrete structure comprised of three levels, a full basement, and an intermediate level in the service wing. The historic renovation includes seismic, MEP, and technology upgrades to meet student and faculty needs and current CA building codes. The new facility includes enlarged classrooms, upgraded energy performance, improved landscaping and parking areas, and comprehensive hardscape and sitework. Rehabilitated interior finishes in the mansion include specialty European fixtures, marble fireplaces and mantles originating from a 16thcentury Italian castle, a 16th-century hand-carved ceiling from northern Italy in the ballroom, and Italian ironwork and German woodcarving throughout.

SIZE

47,000sf

CONSTRUCTION COST

$25 million

PROJECT ARCHITECT

EHDD

KEY FEATURES / AWARDS + CERTIFICATIONS

Historic restoration; Seismic upgrade

University of California, Berkeley

VLSB Teaching Lab Renovation

BERKELEY,

CA

PROJECT DESCRIPTION

The Valley Life Sciences Building project consists of two biological teaching laboratories and laboratory preparation space. Relocation of classrooms and computer labs within existing library. Completed in an operating classroom and lecture hall. Work performed off-hours ensuring facility remained fullyfunctional throughout construction.

SIZE 5,000sf

CONSTRUCTION COST

$2.6 million

PROJECT ARCHITECT GL Planning & Design