BEFORE THE ARIZONA POWER PLANT AND TRANSMISSION LINE SITING COMMITTEE IN THE MATTER OF THE APPLICATION OF ARIZONA PUBLIC SERVICE COMPANY IN CONFORMANCE WITH THE REQUIREMENTS OF ARIZONA REVISED STATUTES SECTION 40-360, ET SEQ., FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AUTHORIZING THE NORTH VALLEY 230KV FACILITY PROJECT, CASE NO. 120 INCLUDING THE CONSTRUCTION OF APPROXIMATELY 31 MILES OF 230KV TRANSMISSION LINES, TWO 230KV SUBSTATIONS, AND THREE SUBSTATION INTERCONNECTIONS IN MARICOPA COUNTY, ARIZONA, ORIGINATING AT THE WESTWING SUBSTATION IN SECTION 12, TOWNSHIP 4 NORTH, RANGE 1 WEST, G&SRB&M AND INTERCONNECTING AT THE RACEWAY SUBSTATION IN SECTIONS 4 AND 5, TOWNSHIP 5 NORTH, RANGE 1 EAST, G&SRB&M, CONTINUING TO THE PROPOSED AVERY SUBSTATION IN SECTION 15, TOWNSHIP 5 NORTH, RANGE 2 EAST, G&SRB&M AND THE PROPOSED MISTY WILLOW SUBSTATION IN SECTION 8, TOWNSHIP 4 NORTH, RANGE 3 EAST, G&SRB&M, AND TERMINATING AT THE PINNACLE PEAK SUBSTATION IN SECTION 10, TOWNSHIP 4 NORTH, RANGE 4 EAST, G&SRB&M. DOCKET NO. L-00000D-02-0120

IN THE MATTER OF THE APPLICATION ARIZONA PUBLIC SERVICE COMPANY IN CONFORMANCE WITH THE REQUIREMENTS OF ARIZONA REVISED STATUTES SECTION 40-360, et seq., FOR A CERTIFICATE OF ENVIRONMENTAL COMPATIBILITY AUTHORIZING THE TS-9 TO PINNACLE PEAK 500kV/230kV TRANSMISSION LINE PROJECT WHICH INCLUDES A 500kV TRANSMISSION LINE, A 230kV TRANSMISSION LINE AND ASSOCIATED FACILITIES AND INTERCONNECTIONS ORIGINATING FROM THE PROPOSED TS-9 SUBSTATION LOCATED SOUTH OF SR74 IN PEORIA, AT SECTION 33, TOWNSHIP 6 NORTH, RANGE I EAST, G&SRB&M, TO THE EXISTING PINNACLE PEAK SUBSTATION LOCATED NEAR 64th STREET AND PINNACLE PEAK ROAD IN PHOENIX, AT SECTION 10, TOWNSHIP 4 NORTH, RANGE 4 EAST, G&SRB&M. DOCKET NO. L-00000D-06-0635-00131 APPLICATION TO AMEND DECISION NO. 65997 AND DECISION NO. 63943

NOTICE OF HEARING A PUBLIC HEARING WILL BE HELD before the Arizona Power Plant and Transmission Line Siting Committee (Committee) regarding the Application of Arizona Public Service Company (APS or Applicant) to amend Decision No. 65997 and Decision No. 63943, which approved Certificates of Environmental Compatibility (CEC) in Line Siting Case 120 (CEC 120) and Line Siting Case 131 (CEC 131), together with the Supplement to Application to Amend (collectively the Application to Amend). The Application to Amend requests modification to CEC 120 to permit APS to expand the size of the Avery substation footprint to approximately sixty-four (64) acres, and modifications to CEC 131 to (i) permit APS to relocate an approximate four-mile segment of the existing Morgan-Pinnacle Peak Line from its approved corridor approximately 1,000 feet north to prevent interference with the operations of the Taiwan Semiconductor Manufacturing Plant (Plant) and (ii) to authorize the construction of a third substation to ensure adequate service to the Plant (collectively the Project). A map of the Project is attached as Exhibit A. In response to the Application to Amend, the Arizona Corporation Commission (ACC) referred this matter back to the Committee for an evidentiary hearing to obtain testimony on all issues raised by the Application to Amend. The hearing on the Application to Amend will be held at the Briarwood Country Club clubhouse located at 20800 N. 135th Avenue, Sun City West, AZ 85375. The hearing will begin on July 26, 2021, at 1:00 p.m. and continue on July 27, 2021 through July 30, 2021, commencing at 9:00 a.m. each day as necessary through the completion of the hearing. PUBLIC COMMENT WILL BE TAKEN IN A SPECIAL EVENING SESSION ON JULY 26, 2021, BEGINNING AT 5:30 P.M., VIA TELEPHONE, ZOOM, OR IN PERSON, AT THE BRIARWOOD COUNTRY CLUB CLUBHOUSE, 20800 N. 135TH AVENUE, SUN CITY WEST, AZ 85375. PUBLIC COMMENT MAY ALSO BE TAKEN AT THE BEGINNING OF EACH HEARING DAY, OR AT

OTHER TIMES DURING THE HEARING, AT THE DISCRETION OF THE CHAIRMAN OF THE COMMITTEE. PLEASE BE ADVISED THAT THE PUBLIC HEARING AND PUBLIC COMMENT SESSION WILL FOLLOW CENTERS FOR DISEASE CONTROL (CDC), STATE AND LOCAL GUIDELINES ADDRESSING COVID-19 FURTHER RESTRICTIONS ON PUBLIC ACCESS, ADDITIONAL SAFETY PROTOCOLS, AND REVISIONS TO THE HEARING SCHEDULE MAY OCCUR DUE TO PUBLIC HEALTH CONSIDERATIONS. DUE TO THE COVID-19 PANDEMIC, THE PUBLIC IS STRONGLY ENCOURAGED TO PARTICIPATE BY EITHER WATCHING THE HEARING ONLINE OR LISTENING TO THE HEARING VIA TELEPHONE RATHER THAN ATTENDING IN PERSON. At least 24 hours in advance of the hearing, information regarding online and telephone hearing access, as well as any additional details regarding COVID-19 safety protocols or other revisions to the hearing schedule will be posted on the Project website at https://www.aps.com/biscuitflats and on the ACC website at: http://azcc.gov/AZ_Power_Plant/linesiting-calendar.asp. Messages can be left at (602) 282-8890 and the call will be returned with information regarding hearing details as requested. The Chairman may, at his discretion, recess the hearing to a time and place to be announced during the hearing, or to be determined after the recess. The date, time, and place at which the hearing will be resumed will be posted on the above-noted Project website and the ACC website. NOTE: NOTICE OF ANY SUCH RESUMED HEARING WILL BE GIVEN; HOWEVER, PUBLISHED NOTICE OF SUCH A RESUMED HEARING IS NOT REQUIRED. No tour of the Project Area is planned by the Chairman at this time. If the Chairman or Committee later decide to conduct a tour, notice that includes a map and itinerary of any such tour will be available at the hearing and posted on the

Continued on page XX 33


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
The Foothills Focus - Zone 1- 6.16.2021 by Times Media Group - Issuu